浚挖 的英文怎麼說

中文拼音 [jùn]
浚挖 英文
dredging
  • : 浚構詞成分。
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  1. In this paper, the method combined the “ s ” shape sediment control dam with the dredged channel has been put forward

    為此,在比較各種疏方案效果的情況下,提出了泥槽與增設折線型防淤堤相結合的清淤疏措施。
  2. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏浚挖槽的回淤量,必須依靠控制上游來沙量、調整入水口門位置、加設防淤堤及提高庫水位等手段,而不能通過調整泥槽寬度、位置及數量等措施來達到目的。
  3. As one type of dredging equipment, a cutter suction dredger can dredge material and fill land by continually cutting soil and transporting slurry to the disposal area

    絞吸式泥船作為一種疏設備,單船作業可疏和吹填。它能連續地掘和輸送泥漿,因而具有廣泛的適用性和經濟性。
  4. We put emphasis on the method and process of establishing a controller link field control network ; have designed the monitoring program and remote service manager program. the completed system realizes the automatically monitoring and remote - communication of the dredging work of cutter suction dredger

    重點闡述了組建controllerlink現場控制網路的方法和步驟,編制了上位機監控程序和遠程服務管理器程序,基本實現了絞吸式泥船疏作業的自動化監控和遠程通訊。
  5. If provided with high pressure pump and water gun, it can make up a hydraulic mechanized earth work unit, used for ground leveling, dredging in rivers and pools, digging, excavation and transportation in small hydraulic engineering, as well as the air defense and underground project in cities

    若與高壓水泵,水槍配合,組成水力機械化土方工程機組,就可用作于土地平整,河道與池塘的疏、鑿開等小型水力工程的方與輸方,以及城市的防空工程,地下工程。
  6. Development of cutter suction dredge simulator

    絞吸式泥船疏作業模擬訓練器的研製
  7. The author also synthetically analyzed each effect factor on dredging, concluded several relationships between dredging dimensions and efficiency as formulae 7 - 1. 7 - 2 and 7 - 3

    通過對各槽影響因素的綜合分析,得到了式7 - 1 、 7 - 2 、 7 - 3等疏浚挖槽尺寸與槽效果的關系。
  8. Based on the appraisal of three kinds of means that reflect the effect of dredging, proposed several judging indexes ( such as dredging efficiency ) to estimate excavating results

    在評述疏浚挖槽效果指標的基礎上,提出了槽效率減淤指標等概念,為科學的判斷槽效果奠定了基礎。
  9. Correspondingly, its theory is up to developed to a higher level. in this thesis, taking the risk management activities of the two parties of insurance as the perceptive and the process of engineering insurance as the clue, the establishment of risk management system is analyzed during the process of risk identification and evaluation, insurance contract arrangement, disaster prevention and loss reduction, and the compensation management. furthermore

    本文在查閱大量文獻的基礎上,對疏泥泵及排泥管道的動態特性現象進行了分析,並應用面向對象的c + +語言開發了比較通用的計算機程序,對緊急關閥、水下掘機具(如絞刀、斗輪等)吸泥口堵塞以及事故拋泵等典型的動態工況特性進行了計算和分析。
  10. Picture of the type of amphibious dredger that will be used for de - silting the water channel

    圖為疏17號基圍水道所使用的水陸兩用土機類型。
  11. This paper summarize the estuary sediment management methods also, analyze and the following aspects and give evaluations : estuary dredging and lead the flow, lead water to scour the river channel, build the xihekou reservoir, estuary gate deposition management, dike reinforced etc

    本文還對河口泥沙的處理途徑和措施進行了概括總結,對河口疏與導流、引海水沖刷河道、建設西河口水利樞紐、攔門沙治理、人工有計劃改道和出漢、加高堤防和加固防護工程和河固堤工程等進行了分析評價。
  12. It has been tested by dredger simulation training machine and is running perfectly

    初步通過了絞吸式泥船疏作業模擬器的測試,運行狀況良好。
  13. In the working of cutter suction dredger, the slurry is transported by solid - liquid two - phase flow that is consisted of sand and water. this method cannot carry slurry too long, so some projects cannot be taken on

    在絞吸式泥船疏作業中,泥漿是由泥沙和水組成的固-液兩相流得以輸送的,往往因排泥距離不長而使許多工程無法承擔。
  14. The structure and the working process of a trailing suction dredger are complex, and the working environment and the material to be dredged vary very much

    耙吸式泥船的結構和疏過程都非常復雜,其工作環境和工作對象變化較大。
  15. Improving the working character and the efficiency of trailing suction hopper dredgers will greatly increase the production, save power and bring more interests for dredging industry

    改善耙吸式泥船的工作特性和工作效率將大大提高疏產量、節省能源,為疏工程創造更多的效益。
  16. Based on plenty of investigations and researches, the thesis developed lots of lively, vivid, visual integrative monitor and alarm interfaces with excellent interactive quality by processing graphical edit software in the integrative monitoring and alarming system. the thesis managed to make them to be an ordinal, clear and distinct system, by programming and designing as a whole, arranging and organizing systematically

    模擬訓練器集中監控報警系統以國產1750m ~ 3 h絞吸式泥船集中監控報警系統為模擬母型,在大量調查研究基礎上,通過對各種監控數據、報警提示適當取捨、擴充,並進行總體規劃設計,經過分門別類地編排組織,採用過程圖形編輯軟體開發了大量生動、形象、直觀、交互性強的集中監控報警界面,使之組成脈絡分明、層次清晰的有序系統。
  17. The dredger is one of major facilities in the fields of channel dredge, hydro project, prevent or control flood, ocean development, seaport construction etc. at present, the management maintenance methods of dredger are primary time based maintenance and run - to - breakdown maintenance

    泥船是航道疏與整治、水利工程、防洪搶險、海洋開發及海港建設的主要工具。目前對泥船管理維修的方法主要有定期維修和事後維修。
  18. First the author memorized the yellow river excavation history and concluded development of modern dredging science, and found that most researches of dredging are related to navigation regulation, little used to flood control especially in the yellow river with silty. based on the experiment of generalized physical model of the lower reach of the yellow river, and the study of the loaden flow mechanism and the dredging efficiency, the author get some new ideas as follows : 1

    通過對黃河疏的歷史以及現代疏工程學的發展進行了回顧和總結,認為已有的疏研究大多基於航道疏工程,對于防洪疏特別是在黃河這種多沙型河流上進行防洪疏的研究極為欠缺,本文基於黃河下遊河道概化模型試驗,對疏浚挖槽后水沙運動機理及效果等進行了研究,得到以下認識。
  19. 5. based on the physical model, summarized the general mode of river development in excavated segment with its up and lower influence reach after dredging, it means that gradually deposit in dredging segment while wash out in up reach, and the change intensities are weakening as the time goes on

    概括總結出了河段疏浚挖槽后,疏浚挖槽河段及其上下影響河段的河床演變及水面線變化的模式,即槽段逐漸回淤,槽上游段逐漸沖刷,並且其回淤及沖刷的強度隨時間的推移由大變小。
  20. 6 three sets of a method statement for the dredging, stockpiling and transportation of sediment ; and the stockpiling and transportation of construction waste and excavated material from within the works boundaries shall be deposited with the director before the commencement of construction of the relevant works of the projects

    在展開建造有關工程之前,須向署長存放3套關于工程界線內沉積物的浚挖、堆存及運送,以及建築廢料和出物料的堆存及運送的方法說明,以待批準。
分享友人