浚達 的英文怎麼說

中文拼音 [jùn]
浚達 英文
gunter von kleist
  • : 浚構詞成分。
  • : Ⅰ動詞1 (暢通) extend 2 (達到) reach; attain; amount to 3 (通曉; 明白) understand thoroughly...
  1. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏挖槽的回淤量,必須依靠控制上游來沙量、調整入水口門位置、加設防淤堤及提高庫水位等手段,而不能通過調整挖泥槽寬度、位置及數量等措施來到目的。
  2. The shoreline is 423. 5 km, and the channel 13 m deep and 250m wide. by september 2007, the channel from guishan to nansha will be deepened to 15. 2 m

    廣州港岸線長423 . 5公里,珠江口至黃埔港區的墩頭西基調頭區,航道水深- 13米,底寬250米。計劃到2007年9月份,桂山至南沙航段航道水深深到- 15 . 2米。
  3. In the canal with sand moving balance and stable bed, may keep the current status ; for the sediment canal which seriously reduced discharge, may properly clean sediment ; for the seriously scoured canal, such as curved canal, should lining the canal

    對于輸沙到平衡、河床比較穩定又到輸水能力的渠段,可保持現狀;對淤積比較嚴重又影響輸水能力的局部渠道,可進行適當疏清淤;對淘刷比較嚴重的彎道凹岸進行工程護砌。
  4. It can help the students whose major is dredging and the dredger operators getting acquainted with dredging process, so that they can be trained to get the best production under the different circumstances

    它主要用於培訓疏專業的學生和挖泥船的船員掌握先進的疏作業方法,以到高效疏的目的。
  5. The function of forecasting was added in the system to reduce the students " mistakes greatly in term of the training ' s demand. the optimized dredging operation guiding and training system makes the dredging process training simulator be better at training and teaching

    作業優化操作提示系統使疏作業模擬訓練器更有利於培訓與教學,用於培訓疏專業學生和挖泥船船員掌握先進疏方法,到高效作業目的。
分享友人