海閘 的英文怎麼說

中文拼音 [hǎizhá]
海閘 英文
coaster gate
  1. West sea water floodgate, joining high and beautiful

    西、高麗參
  2. The west sea water floodgate

    西
  3. The bank of shanghai of university of shanghai, the park of zhabei of construction bank railway hospital, the green sea new station on the ground of daning, the subway extends line ( in building ), inner loop, zhonghuan ( while planning ), overhead on the 1st, form the three - dimensional network of communication lines

    大學上銀行,建行鐵道醫院北公園,大寧綠地上新客站,地鐵1號延伸線(在建中) 、內環、中環(規劃中) 、高架,形成立體交通網。
  4. When i read this piece of news, i thought of something that happened not that long ago in shanghai, 840 vagrant cats ( with some house cats among them ) were rescued by shanghai society for the protection of small animal members at a toll booth on the shanghai - guangzhou expressway ( these cats were purchased by cat dealers in zhejiang, anhui and other places then shipped to guangzhou restaurants to be turned into food ), who then posted messages to every bbs forum to collect medicine and food to cure these poor little lives

    當讀了這篇新聞報道的時候,想到了前不久在上發生的一件事, 840隻流浪貓(其中也有些家貓)被上小動物保護者在上至廣州的高速公路口處解救下來(這些貓是從浙江、安徽等地被貓販子收購下來送往廣州餐館里做菜肴用的) ,並在各個論壇里發帖子徵集藥品、食物來救治這些可憐的小生命。
  5. Maritime structures - design of dry docks, locks, slipways and shipbuilding berths, shiplifts and dock and lock gates

    上建築.第3部分:干船塢滑臺以及造船用船臺船吊及船塢與門設計
  6. Shipment traffic usually is heavy in littoral area, the navigation capability is required in many riverway. navigation lock was set to suit for the water level ' s variety caused by tide. for a long period, being lack of the quantified assessment on the influence of saltwater intrusion, approaches that freshwater is inpoured to the lock chamber are adopted lest the high concentration salt water be imported to the inland waterway, when the navigation lock is in operation. but such manner should not be reasonale enough

    沿地區船運發達,很多河道有通航要求,為克服潮汐造成的水位變化而設置船。長期以來,由於缺乏對鹽水入侵內河河道產生影響的定量評估,在船運行過程中為防止高鹽度鹹水入侵內河,通常採用將內河淡水打入室的方式來調節通航水位,船的這種運行方式不盡合理。
  7. In an actual case of the numerical modeling on the flood of both the north branch and the mid - downstream of daqing river in haihe river hasin, the flood is simulated with one - dimensional model, in which flood regulation of the retarding basin, the discharge gate control and the infiltrations of the northern rivers are considered

    河流域大清河北支及中下遊河道洪水數值模擬的實際工作中,應用了一維河網模型進行洪水的模擬計算,並根據實際情況加入了蓄滯洪區調度、泄洪控制調度以及近年來北方河道入滲的特點等條件,計算效果良好。
  8. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍工程的發展進程與國內外圍的開發現狀,重點介紹了我國目前圍工程的特點及在圍工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  9. Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex

    堤和水的修建都是圍工程先期施工的部分,堵口則是堤修築的最後階段,堵口合龍成敗關繫到圍工程成敗,由於此階段所遇到的水力條件十分惡劣,口門落差可達2 3m ,流速最大可達到6 8m / s ,且水流極其復雜,根據我國《圍工程技術規范》規定圍堵口必須進行龍口水力計算。
  10. Yuhuan yixin valve factory locates the beauty strand of rich east china sea, the vegetable contain " the country of the pomelo " province jade bracelet county of zhejiang that it call, with wen zhou ge2 ' s shore opposite, the land - and - water transportation is very convenient. the my plant profession produces the copper ball valve, cape valve, mouth of water, check valve, closes the valve and takes care ofconnect several valves of species of etc. door product, product far sell etc. of the europe and america, southeast asia, middle east nation andregion, the product quantity has been win the favor and the trust of all countries guest room

    玉環縣益鑫閥門廠位於美麗富饒的東之濱,素有"文旦之鄉"之稱的浙江省玉環縣,與溫州隔岸相峙,水陸交通十分便利.本廠專業生產銅球閥、閥、角閥、水嘴、止回閥、截止閥、管接等多個品種的閥門類產品,產品遠銷歐美、東南亞、中東等國家和地區,產品質量一直贏得各國客戶的青睞和信賴。
  11. Perusing a shanghainese menu is like a lesson in the geography of eastern china, with many dishes originating from the provincial cities of neighbouring fujian, jiangsu and zhejiang. well - known examples include the tied crabs and glazed ham, which originates from the southern song garden city of suzhou, beggar s chicken from hangzhou, as well as the west lake s watercress and fish dishes

    經過百年演變,這地區的菜式和鄉村食譜經已由上師傅融匯貫通,令上菜成為款式最多的中國菜肴,例如大蟹和蜜汁火腿是蘇州的名菜叫化雞是杭州的傑作西湖則以西洋菜和鮮魚著名。
  12. Shanghai tv university, zhabei branch, china

    電視大學北分校
  13. The standard of allowable mooring force for ocean ship lock is also discussed

    並針對的船舶允許系纜力標準進行了探討。
  14. Presently, it ' s a obstruction of developing inland waters transportation that inland waters channel is in a condition of low level and limited capacity of lock on the channel. therefore, lock on the channel must be reconstructed at once, together with the hole channel ' s renovate

    目前,上內河航道等級低、船通航條件差,是開展內河集裝箱運輸的障礙,因此,上內河航道整治中內河船改造刻不容緩,作為內河航道整治的配套工程船改造必需同步進行。
  15. In the turbulent flow, the fluid ’ s physical parameters has the stochastic change along with the time and the space, it is very difficult to carries on its rate process ’ s precise computation and the simulation with mathematics method, but unstable condition navier - stokes equation regarding open canal current of water transient motion suitable

    后水流經過加糙的漫段時,其水流狀態屬明渠紊流。流體中的各種物理參數,都隨時間與空間發生隨機的變化,很難用數學的方法對其運動過程進行精確計算和模擬。
  16. On the base the damage models of concrete and analysis methods of horizontal loading capacity of pile are introduced. using the method mentioned above thin - wall cylinder piles of the out - gate the engineering in east punan shanghai are analyzed, and comparing with testing results it is prove that calculation results are reasonable

    在此基礎上引入了混凝土的損傷模型,提出了樁的水平承載力的分析方法,並利用該方法對上浦南東片出海閘導流堤採用的薄壁筒樁進行了水平變力逐步加載分析,並與試驗結果進行比較,驗證了分析結果的合理性。
  17. In the end, these methods are used to analyze the continuous wall foundation of the outlet - gate in east punan, shanghai and find its internal force under typical load

    文中最後將本文研究成果應用於上浦南東海閘在典型荷載作用下的受力分析,得到了合理的結果。
  18. Comments : starwood hotels & resorts has added four points by sheraton shanghai, daning to the city ' s zhabei district just recently, a sign of the prestigious hotel company ' s absolute confidence in shanghai and china markets

    《大酒店》點評:喜達屋酒店及度假村國際集團不久前剛在上浦東新添上喜來登由由酒店,近日又在上海閘北區再添活力。
  19. The hotel will be a part of the integrated " daning - the life hub " which is a multi - purpose, innovative and open - air urban lifestyle center in central zhabei, north of shanghai central business district

    酒店位於上海閘北區(共和新路和大寧路交匯點,地鐵一號線延長路站北側)靠近中心商業區,是大寧國際商業廣場- -集商住、辦公、商場和生活娛樂等設施於一體的現代城市生活中心的組成部分。
  20. The 1, 576, 000 square - feet kerry everbright city phase ii mixed - use development project in zhabei district progresses as scheduled. the residential towers are expected to be completed in 2007

    位於上海閘北區總樓面面積達1 , 576 , 000平方尺的嘉里不夜城第ii期多用途物業發展項目,工程正如期進行。
分享友人