海面基準面 的英文怎麼說

中文拼音 [hǎimiànzhǔnmiàn]
海面基準面 英文
ultimate base level
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ名詞1 (標準) standard; guideline; criterion; norm 2 (目標) aim; target Ⅱ動詞1 (依據; 依照)...
  • 海面 : sea level; sea surface; sea海面標志 [工業] sea marker
  1. According to whether there are later tectonic activities or not it can be divided into mountain planation surface, lower planation surface and buried planation surface. according to active condition, it can be divided into active surface, dormant surface, exotic surface and defunct surface. taking the base level into consideration, it can be divided into sea - eroded and deposited planation surface, denudated planation surface, snowline planation surface and upper eroded planation surface

    依據夷平形成后是否遭到後期構造變動將夷平分為山地夷平、原地夷平和埋藏夷平;依據夷平的活動狀態可分為活動、休眠、外來和廢止;依據侵蝕可分為蝕-堆積夷平、剝蝕夷平、雪線夷平和上部剝蝕夷平;依據底可分為穩定地帶上的夷平和活動地帶上的夷平;依據氣候帶可分為平原、山麓和聯合山麓、雙層水平和刻蝕平原、凍融山足和凍融剝夷平原。
  2. Finally, he writes his definitions, following the hard - and - fast rule that each definition must be based on what the sentences in front of him show about the meanings of the word

    最後,他終于寫下了他的定義,遵循著這樣一條放諸四而皆的規則:每條定義需於擺在他前的句子所表明的詞語的意思。
  3. Yellow sea datum : the level to which land surveys in mainland china are referenced

    :中國大陸測量土地的礎高度。
  4. A rather large spring tide occurred on july 4, 2004. on that occasion, the lowest sea level recorded in victoria harbour was 0. 07 metre below chart datum and a few ferries experienced difficulty while berthing

    二四年七月四日亦出現了一次較大的大潮,當日維多利亞港錄得的最低水位為以下0
  5. According to the hong kong observatory s tidal records at the tai po kau tide gauge station, the highest sea level was 2. 94 metres above chart datum on that day

    根據香港天文臺大埔?測潮站的記錄,當日的最高水位為以上2 . 94米。
  6. All elevations are relative to chart datum

    所有標高均相對于
  7. Chart datum : the level to which soundings or tide heights are referenced

    :測量水深或潮水高度的礎高度。
  8. Based on the spectrum of mean sea level ( msl ) and the relation model between two tidal stations, the mathematical model for hydrographic datum transfer are studied

    於平均的頻譜結構和兩驗潮站潮位之間的關系模型,對傳遞的方法原理進行了理論研究。
  9. Shkp follows international trends and is always looking for new ways to achieve the highest quality. it was the pioneer developer to employ new technologies such as infrared detector to check external walls, high - pressure water jets to test windows and laser levellers to inspect floors

    新地經常到外考察,參考國際一級企業所厘訂的,又不斷引進新技術提高質素和效率,例如新地率先應用以紅外線科技測試外墻用高壓水槍全測試鋁窗以鐳射平水儀檢查地臺等。
  10. Above chart datum

    以上
  11. The tidal predictions are for victoria harbour and the tide heights are in metres above chart datum

    潮汐預報是以維多利亞港為。潮水高度為以上高度,以米為單位。
  12. Tide height is in metre above the chart datum which is 0. 146 m below the hong kong principal datum

    潮水高度為以上高度,以米為單位。香港的在主水平下0 . 146米。
  13. Water level in the tolo harbour was as high as 5. 4 metres above chart datum as compared with the normal high tide of 2. 2

    吐露港的潮水高度竟達以上5 . 4米,而正常的漲潮只有2 . 2米。
  14. Tide height is in metre ( m ) above the chart datum which is 0. 146 m below the hong kong principal datum

    潮水高度為以上高度,以米為單位。香港的在主水平下0 . 146米。
  15. Both the asynchronous effect of synchronous reduction method and the time shift effect of regression reduction method are discovered and more precise models for both above methods developed in this paper

    研究還表明:平均的回歸分析傳遞法和深度的潮差比傳遞法均是最小二乘潮位擬合傳遞法的特殊形式。
  16. Uninterrupted pedestrian connection from the statute square to the waterfront would be provided through the site. - the maximum building heights of the 4 " waterfront related commercial and leisure uses " sites are 15 mpd 2 storeys for the " ou " site, 25 mpd 4 storeys for the two " ou " sites and 13 mpd 1 storey for the " ou " site

    至於4幅"與旁有關的商業及休憩用途"土地的最高建築高度為: "指定用途1 "地帶為主水平以上15米兩層高2幅"指定用途2 "地帶為主水平以上25米四層高,以及"指定用途3 "地帶為主水平以上13米一層高。
  17. The hong kong principal datum is approximately 0. 88 m below the yellow sea datum

    香港的主水平約在黃下0
  18. If an immersed tube about 10 metres high is placed above the existing seabed level, which is at around - 12mpd

    -假如在現有床上約主水平以下12米處敷設直徑約10米的沉管。
  19. Dredging of an immersed tube tunnel trench to - 30mpd alongside the existing gravity structure seawalls would undermine the seawalls, the bases of which are around - 5mpd

    現有的重力式結構堤的地在主水平以下約5米,沿堤挖掘沉管隧道坑道至主水平以下30米會削弱這些堤。
  20. The road level of the cwb, as well as its eastbound slip road to the hong kong convention and exhibition centre extension, will need to be raised to - 7. 1 mpd to avoid clashing with the existing mtr cross harbour tunnel tsuen wan line with its roof at - 14. 6mpd

    -中環灣仔繞道的路高度,以及通往香港會議展覽中心的東行支路必須提高至主水平以下7 . 1米,以避開現有地鐵過隧道荃灣線,該隧道管道頂部位於主水平以下14 . 6米
分享友人