消能坎 的英文怎麼說

中文拼音 [xiāonéngkǎn]
消能坎 英文
end sill
  • : 動詞1 (消失) disappear; vanish 2 (使消失; 消除) eliminate; dispel; remove 3 (度過; 消遣) pa...
  • : 能名詞(姓氏) a surname
  1. Research on peculiarity of wave in the downstream of diffluent piers with low ridge

    分流墩工下游水流波動特性研究
  2. It was amazing to find a four - year - old boy esara bhashitha kauminda, from dewundara, in southern sri lanka, visiting kandy for the first time identifying the location of the house in which he lived in his previous life, six years ago as a school boy

    這是一則令人驚奇的息,來自位於斯里蘭卡南部的達問答拉的四歲小孩,伊薩拉.巴希塔.考明達,就在第一次來到蒂的時候就指出他前世所住的房子位置,他說自己六年前還是一個六歲的學童。
  3. Can t stop, robinson, i am hastening to purchase the only reliable inkeraser kansell, sold by hely s ltd, 85 dame street. well out of that ruck i am

    魯濱孫,我不耽誤,得趕緊去買唯一靠得住的塞爾牌字靈,戴姆街八十五號希利商店出售的。
  4. What ' s more, we put forward some experienced formulas on the basis of the cortical analysis. the result of the research show that by installing diffluent piers with low ridge, we can eliminate the root of oscillatiny water jump, perfect the energy dissipation effect of water jump, also, we can improve the flow condition of down - stream. the fact that the main flow of down - stream is in the middle, not only effectively lower the speed of the bottom flow in the ridge rear, alleviate the erosion to the river bed, but also avoid the heavy wave resulted from the main flow in the surface, thus improve the surface wave of down - stream obviously. we can work out the body style parameters of diffluent piers with low ridge according to the project flow condition and experience formulas, and then reckon the down - stream surface wave condition for the protected building of the down - stream bank

    研究結果表明:設置低分流墩后,除了擺動水躍水舌擺動的根源,提高了水躍的效果,改善了下游水流流態。下游水體的主流在中部,既有效的降低了后水流底流速,減輕水流對河床的沖刷,又避免了主流位於表面導致波浪過大的結果,下游的水面波浪明顯得到削減。依據經驗公式,可根據工程水流條件設計出低分流墩的體型參數,進而估算出下游沿程的水面波浪,為下游岸邊的砌護提供依據。
  5. The researches including discharge capacity, pressare properties, cavitation characteristics at some key positions, hoisting load of the gate, configuration of energy dissipator at the exit dentated - sill, and downstream scouring were performed by hydraulic model tests

    藉助系列水工模型試驗對水布埡放空洞的泄流力、壓力特性及關鍵部位的空化特性、閘門啟閉力、出口鼻工體型及下游沖刷等進行了較深入的研究、分析。
  6. The trajectory bucket is improved and optimized for suitable trajectory distance and small scouring

    泄洪洞挑流挑流時,當泄流量較小時,挑距較短。
  7. A new energy dissipator - double curved differential dentated - extraordinary - shaped bucket was provided, and its effect of energy dissipation is good

    提出了一種新型工?雙曲差動異型鼻,該鼻有良好的效果。
  8. By the hydraulic model test the application feasibility of the roller bucket with low - ridge was demonstrated. comparing the hydraulic calculation data and operation rusultes, the article made some summarise. the principle of mixed flow for energy dissipation design has been well vertified through the study results

    本文主要通過對某電站水利樞紐下游防沖的水力計算和整體模型、斷面模型的試驗分析,驗證了低鼻戽流在此類工程中應用的可行性。
  9. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱壩泄洪的特點是壩高落差大,流量大,功率大,位於河谷狹窄地區,泄洪與防沖問題突出.經科學研究,採用「分散泄洪,削弱水流沖擊力,加固河床,增強河道抗沖力」的綜合治理措施,較好地解決泄洪布置問題.提出了表孔大差動加分流齒、雙層多孔、水流撞擊、下設水墊塘聯合的典型布置方案,經實踐證明,方案可靠,效果好
  10. Current. in order to make diffluent piers with low ridge to be popularized and applied, the surface wave of low fr. current is chosen as the research object. we measure the surface wave elements and the velocity distribution of various diffluent piers scheme by the experiment of physical model. we also analyze the average wave height, the the average value of the square of wave, unit width of the wave ' s energy, the probability density distribution of wave height, and the power chart character, so as to reveal the weakening wave mechanism of the diffluent piers

    低fr水流的核心是波浪問題,為了低分流墩的推廣應用,本研究以低fr水流的表面波浪作為研究對象,通過物理模型試驗,對各種分流墩方案工的下游水面波浪要素、流速分佈進行測試,分析低分流墩下游波浪的平均波高、均方根、單寬波、波高概率密度分佈及功率譜特性變化規律,從而揭示了低分流墩的削波機理。
  11. It makes the t type barrier and continuous end sill connected. by this method, it can produce forced jump dissipation of energy. as a result, it decreases the length of the stilling basin and lows the cost

    T形墩力池是在平底力池內,設置t形墩與連續尾相連接,藉以產生強迫水躍進行,從而減小力池的長度,降低造價。
分享友人