消間裝置 的英文怎麼說

中文拼音 [xiāojiānzhuāngzhì]
消間裝置 英文
noise-suppression device
  • : 動詞1 (消失) disappear; vanish 2 (使消失; 消除) eliminate; dispel; remove 3 (度過; 消遣) pa...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 裝置 : 1 (機器設備的配件)installation; device; apparatus; equipment; arrangement; gear; appliance; rig...
  1. There are over 80 sets test apparatus in tech - innovation centre, including : anechoic chamber, vibration tester, vibration measurement analysis, impact instrument, constant temperature and humidity facilities. salt spary test case, circle insulation withstand voltage tester, insulation resistance tester, withstand voltage tester, electric lead tester, electrical leakage tester, earth resistance tester, chassis dynamometer, chassis dynamometer control system, high stability dc resistance tester, electrical capacity tester, temperature rise test system

    中心擁有各類分析測試儀器和試驗80餘臺套,包括:音室振動臺噪聲振動測試分析系統沖擊儀恆溫恆濕實驗儀鹽霧試驗箱匝耐壓分析儀絕緣電阻分析儀對地耐壓分析儀泄露電流測試儀對地電阻測試儀測功機測功機控制系統高精度直流電阻測試儀電參數測試儀帶電溫升測試儀復合式三坐標測量儀萬分投影儀及電功測試分析系統等。
  2. This enables trouble free processing of even the toughest rubber compounds

    輥驅動直接連接于螺旋斜線齒輪實現,中不經過任何傳動耗。
  3. Land piling, space frame system, landscaping, air - conditioning, audio electronics, burglar alarm and security, electrical, uninterruptible power supply, fire services, fountain, lift, escalator and passenger conveyor, mechanical plant and equipment, repair and restoration of historic buildings, etc

    土地打樁、空構架系統、綠化工程、空調、音響、防盜及保安、電力、無斷供電、噴水池、升降機、自動梯及乘客輸送帶、機械、維修及修復有歷史性樓宇工程等
  4. And integrate actual circs and principle of noise elimination, developed one kind of new silencer, thereby gained our ends that noise is attenuated

    並結合我廠實際情況與聲原理,研製出了一種新型的,從而達到了降低我廠電解車噪聲的目的。
  5. Compared with natural ventilating up - draft barn, the common curing barn installed with " automatic controlling temperature and forced humid air exhausting apparatus " can enhance evidently superior leaves ratio, average price and income of raw tobacco, decrease evidently substandard tobacco leaves ratio, lighten work hardness, shorten curing time, reduce fuel consumption, save labor power and reduce curing cost

    摘要普通烤房安「烤煙自動控溫強制排濕」后,與自然通風氣流上升式烤房相比,烤后的煙葉在上等煙率、均價、收益等方面都有明顯提高,級外煙明顯減少,此外,還能降低勞動強度,縮短烘烤時,減少燃料耗,節約勞動力,降低烘烤成本。
  6. One - off grant to assist owners of pre - euro diesel heavy vehicles of long idling operational mode to retrofit their vehicles with emission reduction devices

    一次過撥款資助車主為引擎須長時空轉的歐盟前期重型柴油車輛安排放
  7. This allows extended treatment sessions with less force needed and at the same time the lifespan of the hydraulic construction increases

    這項功能令治療時得以廷長,減低體力的耗,廷長油壓的壽命。
  8. At 3, 000, 000km from geodesa the crafts hyper spatial propulsion drive is engaged and the ship disappears from deltan medium range telemetry

    在距離吉德薩300萬的地方,超級空推進器與此銜接了,然後飛船在德爾塔中級遙感失了。
  9. In computer graphics and videotex, a display mode in which the characters are blanked out at regular intervals under the control of a timing device in the receiver

    計算機制圖技術和可視圖文技術中的一種顯示方式,在此方式中,在接收機的定時控制下,字元以有規律的失。
  10. In this paper, based on analysis the distributing rule of permanent magnetic field, a novel method for dynamic tracing micro drug delivering device in alimentary canal has been proposed

    本文在分析永磁體空磁場分佈規律的基礎上,提出了利用磁定位原理實現動態跟蹤微型藥物釋放化道運動狀態的方法。
  11. In this article, a 74500dwt bulk carrier being built in our shipyard is taken for example. based on the calculations for the capacity required, two generator sets and a shaft generator are arranged for the power station on this ships. analyses are made on different units of each generator set, and some reliability tests have been carried out at the same time

    本文通過對工廠建造的74500t散貨輪電站容量的計算,配了兩臺柴油發電機組,並在主機的後部中軸上安了一臺軸帶發電機,並對各發電機組的各個環節進行分析,進行必要的可靠性試驗,並確定運行過程中的維修方案,從而確保船舶電站的正常可靠運行,而簡單的操作方法、簡便的維修、運行的低耗,體現了該船舶電站的實用性。
  12. The basic principle of the method is that, when the micro drug delivering device mounted with a permanent magnet pass through the alimentary canal, the variety of magnetic field was detected by hall sensors, so the location of micro drug delivering device could be deduced and dynamic tracing can be achieved

    其基本過程是在微型藥物釋放上固定永磁體,當其通過化道時在體外檢測磁場變化,進而實時計算出微型藥物釋放的空,並描記出運動軌跡,實現動態跟蹤。
  13. Property enables the settings provider to disambiguate multiple instances of the same wrapper class

    屬性使設提供程序可以除同一個包類的多個實例之的歧義。
  14. Study an effect of using sulfur - removal waste residue ( the vice - product produced by sulfur - removal device of the factory using coal as energy resource to absorb oxidizing sulfur, whose mainly composition is gypsum ) as an amendment to the alkali soil in theory. with certain water as leaching requirement leaching soil column indoor employed with certain quantity sulfur - removal waste residue after collecting and analyzing representative soil sample. collecting and analyzing the filtrate, then calculate the data and speculate the result to guide the field production

    本文重點是對煤煙脫硫廢渣(利用煤炭作為能源的工廠的除硫除硫氧化物后的副產物,主要成分為石膏)改良堿土進行理論研究,方法上以室內土柱淋溶模擬為主,採集有代表性的堿土並分析其成分后,採用小水量定額灌洗,收集分析濾液化學成分,進行推理分析計算並指導田的生產實際。
  15. Special multicrown designed gearing with limited radial clearance perfectly centring the rotating pieces and eliminating lateral vibrations

    專門採用多齒輪冠設計的齒輪,其限定的徑向隙能夠完美地實現與旋轉部件的對中,除了橫向擾動。
  16. The results shows that the factors which influence the power consumption include the rotary speed of main shaft, the trolley speed, the interval between moved cutter and static cutter and the mulched straw, the distance between sawtooth and ground has the less influence than the above factors

    分析結果表明:影響功率耗的主要因素有:主軸轉速、臺車前進速度、動定刀之隙和秸稈覆蓋量,鋸齒離地隙對防堵功率耗的影響很小。
  17. Through design and analysis of the main parts of sawtooth anti - blocking mechanism, the main factor of influence on the performance of sawtooth anti - blocking mechanism is the rotary speed of main shaft, the trolley speed, the interval between moved cutter and static cutter, the distance between sawtooth and ground, the mulched straw and so on

    通過對鋸齒防堵中主要零部件的設計分析,得出主軸轉速、臺車前進速度、動定刀隙、鋸齒離地隙、秸稈覆蓋量等是影響鋸齒防堵防堵性能的主要因素。根據實驗目的,確定了防堵功率耗的測試方法。
分享友人