液力控制箱 的英文怎麼說

中文拼音 [kòngzhìxiāng]
液力控制箱 英文
hydraulic control box
  • : 名詞(液體) liquid; fluid; juice
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 名詞1. (箱子) chest; box; case; trunk 2. (像箱子的東西) anything in the shape of a box
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    梁製造由鋼筋工程、模板工程、混凝土工程、預應工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應應變雙確保預應施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. The total target that the transportation departments do about adjusting the construction of transportation capability is keeping the shipping abilities constant and reducing to 18 percent in the dry cargo and break bulk cargo ; rise up 12 percent in oil ships ; owning 1. 5 percent in chemical and liquid ships and 6. 5 percent in roll - roll and other ships in 2005. the transportation capability is controlled by the promotion of 2. 5 pecent during 2006 and 2010. the transportation capability is reduced to 75 percent in dry cargo and break bulk cargo and risen up 13 percent in oil ships ; 2 percent in chemical and liquid ships ; 10 percent in roll - roll container and other ships in 2010

    交通部關于運結構調整的總體目標是: 2005年前,長江省際運輸運總量基本保持不變,通過結構調整到2005年使干散貨運比重下降到18 ,油船比重上升到12 ,化學品船和化氣船佔1 . 5 、汽車滾裝船等其它船舶佔6 . 5 ; 2006年? 2010年,長江省際運輸運總量平均增長在2 . 5以內,通過結構調整,到2010年使干散貨船運比重下降到75 ,油船比重上升到13 ,化學品船和化氣船佔2 ,汽車滾裝船、集裝船等其它船舶佔10 。
  3. The basic principle of hydraulic system of tb80k trimming is set forth. the changing process of engaging pressure is analyzed and studied, the engaging pressure is produced in transmission controlled by electro - hydraulic proportion when shift gear is switched ; the hydraulic control system used in remote control is studied and designed applied with electro - hydraulic proportional control theory and on the basic of the hydraulic characteristic of tb80k trimming dozer, more and more electro - hydraulic reform projects and assumption are present

    本文闡述了tb80k推耙機壓系統的基本原理;對電比例變速換檔在各檔之間切換的接合壓變化過程進行試驗分析研究;應用電比例理論,結合tb80k推耙機壓系統結構特點進行遙系統研究和設計,並提出了多種電改造方案和設想。
分享友人