深井作業 的英文怎麼說

中文拼音 [shēnjǐngzuò]
深井作業 英文
heavy duty service
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : Ⅰ名詞1 (行業) line of business; trade; industry 2 (職業) occupation; profession; employment; ...
  • 深井 : bore深井泵 bore hole pump; [機械工程] deep-well pump; 深井潛水泵 deep well submerged pump
  1. Abstract : anchor packer is one of the important downhole tools which areused in oil production and waterflood technical operation, such as layer waterflood, layer fracture or acidation, mechanical water block. after anchor is fixed in the simulated test unit, the invasion depth of the casing can be known with the help of the sensor around the casing wall, and then the failure degree is concluded. this is very important for the anchor packer design and site operation

    文摘:在油田開發中封隔器是實施機械採油、分層注水、分層壓裂或酸化、機械卡堵水等注采工藝的主要下工具之一,封隔器上的卡瓦是保證工可靠性的重要元件,把卡瓦安裝在模擬試驗裝置中,通過在套管壁周圍分佈位移傳感器,測得卡瓦錨定后切入套管壁度,判斷卡瓦對套管的損傷程度,這對封隔器的設計和現場使用具有十分重要的意義。
  2. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型管道鋪設、機電設備和石油化工大型反應塔、儲罐的安裝、校準、鐵塔及其它鋼木結構的豎立、拼裝焊接、校準、鐵軌、枕木的鋪設、移位、交通運輸中笨重貨物的裝卸、電線張緊、坑道支撐木的拆除、林區木材的集放等等,對于局部空間受到限制的狹窄工場所、高空、野外、坑道、深井作業和無機電供能場所的各種牽引、提升、選用本系列產品尤為適宜。
  3. Based on the project named 《 seiwave earthquake deposit layer forecasting and well deploying system 》 which is presided by daqing oil field limited liability company reconnaissance exploitation academe. it implement graphics display module, graphics manipulation module, graphics filling module and optimizing of plot speed in 《 three - dimensional earthquake interpret hypo - system 》 which is the core portion of 《 seiwave earthquake deposit layer forecasting and well deploying system 》. it is deeply investigated the special knowledge of earthquake interpret

    本文以《 seiwave地震資料儲層預測與位部署系統》項目為依託,入研究了此系統中相關的圖形顯示知識和專知識,實現了《 seiwave地震儲層預測與位部署系統-三維地震資料解釋子系統》中圖形顯示、圖形操、圖形填充功能和繪圖性能的優化,進一步提高了油田的勘探效率。
  4. In chapter six, based on the preceding chapters " research, the practicality of the full scale dr i 11 ing simulating test device has been tested by the debugging and the performance test. under simulating drilling conditions, the rock mechanical properties and the bits " dynamical tests are analyzed and set forth specifically. at the same time the effect of bottom pressure difference on the oil field exploration and development has been discussed

    第六章在前述分析研究的基礎上,通過對模擬裝置的系統調試及性能測試,驗證了全尺寸鉆模擬裝置的實用性,在鉆模擬條件下對巖石的機械性質、牙輪鉆頭動態測試給予了具體的分析闡述,同時還分析探討了底壓差對油田勘探開發的影illb ,並且為宋101的實際施工提供了非常有價值的指導參數。
  5. Fully understand sand control downhole tools theories, prefer worked as downhole sand control tool supervisor, or surface pumping operator, supervisor before

    對防砂,壓裂下工具和地面泵送設備有較的理解,有實際操泵經驗,曾經帶隊從事下防砂壓裂工具操或地面設備操
  6. Understand hydraulic fracturing engineering, prefer worked as frac engineer or sand control field engineer before, can use stimplan, or fraccad, myer, fracpro, etc to do preliminary design, mini frac analysis, post job match and report, more than 3 years would be an advantage

    對防砂,壓裂下工具和地面泵送設備有較的理解,有實際操泵經驗,曾經帶隊從事下防砂壓裂工具操或地面設備操
  7. Deep well dewatering of soft soil two - layer structure excavation is a kind of economical and effective dewatering method to ensure waterproof in deep excavation. nevertheless its negative impact on is often unavoidable. deep excavation dewatering often leads to the formation of a depressing cone, which may cause the cracking and even the breaking of surrounding buildings and utilities

    在軟土地區二元結構地層,採用降低承壓水,是保證基坑施工的一種經濟有效的方法,但也存在著一定的負面影響,因為降水勢必會形成降水漏斗,而引起基坑周邊地面沉降,可能導致周邊建築物和公共設施的開裂或損壞。
分享友人