深井 的英文怎麼說

中文拼音 [shēnjǐng]
深井 英文
bore深井泵 bore hole pump; [機械工程] deep-well pump; 深井潛水泵 deep well submerged pump
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. The acv 513 - 6 pump control valve starts in an open position during pump start - up, purging the deep well of air and debris to atmosphere

    6泵控制閥在泵啟動期間開始處于開啟的狀態,將深井中的氣體和碎片清除到大氣中。
  2. Applicability of three deep - well grounding modes

    三種深井接地方式的適用性
  3. Band wheel pumping power

    深井泵抽油的皮帶驅動
  4. It can be said that the solution to the space problem of limit load and the calculation of foundation bearing capacity for deformed groundwork have some academic and scientific value. the dynamic pile testing of foundation and batholith as well as deep well load testing system has been put into use in real work environment and gained some social and economic benefit

    本文關于界限荷載的空間問題解答,考慮地基變形的地基承載力工程演算法具有一定的學術價值;本文中的地基(及巖基)承載力動測法及深井載荷試驗系統已在工程實踐中應用,並取得了較好的社會和經濟效益,具有一定的工程實用意義。
  5. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動測法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢測川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及斤載荷試驗四方面進行了入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  6. Control technology of composite roof in deep well coal bed

    深井煤層復合頂板控制技術
  7. Abstract : duri ng concrete deep well constructi on , because of thediffi culti es i n engi neeri ng geographi cal conditi ons , the ordi nary bilateral hydrauli c sli di ng formwork technology can not be adopted. therefore , an unilateral sli di ng formwork technology lifted by chai n block method can beappli ed to advantage and better solved the proble m

    文摘:在混凝土深井施工中,由於受地理環境的限制,不能內外安裝模板時,難以應用一般的液壓滑模施工技術,而採用單面模板、鏈條葫蘆提升滑模工藝,可較好地解決這一問題。
  8. The chinese are credited as the first to have drilled deep water wells.

    最早鑿出深井的光榮屬于中國人。
  9. During the year, the sham tseng fire station - cum - ambulance depot and tuen mun fireboat fire station were commissioned

    年內,深井消防局暨救護站及屯門滅火輪消防局已先後投入服務。
  10. Research on viscosity reduction by electric heating technology in ultra - deep flowing well in tahe oilfield

    塔河油田自噴深井筒電加熱降粘技術研究
  11. Construction of a 1000m plus deep shaft in a high temperature and heavy water flow environment

    大涌水高溫條件下千米深井的施工實踐
  12. Impeller diameter maximum approach for deep well pumps

    深井離心泵葉輪極大直徑設計法
  13. Stainless steel multistage deep - well submersible pump

    Sj不銹鋼多級深井潛水電泵
  14. Water from deep well is directed to thirsty cattle and parched crops.

    深井裡的水輸送給乾渴的家畜和焦乾的莊稼。
  15. Technology of pre - stressed bolt support for rock floor gateway in deep mine complicated conditions

    深井復雜條件下底板巖巷預應力錨桿支護技術
  16. Supersonic deep - well detector for submerged shaft sinking

    淹水沉超聲波深井測探儀
  17. Mine freezing shaft sinking technology for deep mine in henan coal mines

    發展中的河南煤礦深井凍結鑿技術
  18. The roto - jet pump is a new kind of very low specific speed pump which is developed in recent years. it is always used in carbin black, food production, chemical industry and deep well mining system to supply the steady outflow with low flux and high pressure

    旋轉噴射泵是近些年才發展起來的一種極低比轉數泵,主要用在碳黑、食品、化工以及深井采礦系統中用以提供小流量高水頭的穩定出流。
  19. A mature website is just like a deep well with permanent crystal water

    一個成熟的網站就像一口深井,有取之不盡的清泉。
  20. This paper unite surveys works in dong gua shan mines construction under 1 km place researching four key technology in mine s survey, they are construction survey technology in km deep mine, km deep mine s connected survey technology, km deep level survey technology of longer distances link up in many heads opening and basic control survey technology, km mine s extension when the production must go on accurate fixed position survey technology, and all obtained success

    本文結合在千米以下冬瓜山銅礦建設時期的測量工作,研究了部礦山測量四個方面的關鍵技術,即千米深井施工測量技術、千米深井聯系測量技術、千米深井中段多頭開拓長距離貫通和基本控制測量技術、千米深井不停產延精密定位測量技術,並取得了成功的效果。
分享友人