深井壓裂 的英文怎麼說
中文拼音 [shēnjǐngyāliè]
深井壓裂
英文
deewell fracturing-
Abstract : anchor packer is one of the important downhole tools which areused in oil production and waterflood technical operation, such as layer waterflood, layer fracture or acidation, mechanical water block. after anchor is fixed in the simulated test unit, the invasion depth of the casing can be known with the help of the sensor around the casing wall, and then the failure degree is concluded. this is very important for the anchor packer design and site operation
文摘:在油田開發中封隔器是實施機械採油、分層注水、分層壓裂或酸化、機械卡堵水等注采工藝作業的主要井下工具之一,封隔器上的卡瓦是保證工作可靠性的重要元件,把卡瓦安裝在模擬試驗裝置中,通過在套管壁周圍分佈位移傳感器,測得卡瓦錨定后切入套管壁深度,判斷卡瓦對套管的損傷程度,這對封隔器的設計和現場使用具有十分重要的意義。Fully understand sand control downhole tools theories, prefer worked as downhole sand control tool supervisor, or surface pumping operator, supervisor before
對防砂,壓裂井下工具和地面泵送設備有較深的理解,有實際操泵經驗,曾經帶隊作業從事井下防砂壓裂工具操作或地面設備操作。Understand hydraulic fracturing engineering, prefer worked as frac engineer or sand control field engineer before, can use stimplan, or fraccad, myer, fracpro, etc to do preliminary design, mini frac analysis, post job match and report, more than 3 years would be an advantage
對防砂,壓裂井下工具和地面泵送設備有較深的理解,有實際操泵經驗,曾經帶隊作業從事井下防砂壓裂工具操作或地面設備操作。Deep well dewatering of soft soil two - layer structure excavation is a kind of economical and effective dewatering method to ensure waterproof in deep excavation. nevertheless its negative impact on is often unavoidable. deep excavation dewatering often leads to the formation of a depressing cone, which may cause the cracking and even the breaking of surrounding buildings and utilities
在軟土地區二元結構地層,採用深井降低承壓水,是保證深基坑施工作業的一種經濟有效的方法,但也存在著一定的負面影響,因為降水勢必會形成降水漏斗,而引起基坑周邊地面沉降,可能導致周邊建築物和公共設施的開裂或損壞。Abstract : in this paper, the feature of time - bifurcation for plate - beam stability is studied by mechanics model of plate - beam structure of rock in compression. the instability time of plate - beam is dependent on the rock material feature. delay bulking occurs under some load. the formula of time - bifurcation is given. the mechanisms of roadway floor heave and delay rockburst are preliminarity discussed
文摘:採用巖石板裂梁的縱向受壓的力學模型,考慮深部巖石的流變性,分析了板梁穩定性的時間分叉特性.板梁失穩與巖體的流變性質密切相關,在一定載荷下,經歷一段時間后會發生延遲失穩,給出了時間分叉點的計算式.並對深部礦井延遲性巖爆發生機制進行了初步分析分享友人