深度計深度 的英文怎麼說
中文拼音 [shēndùjìshēndù]
深度計深度
英文
depthometer depth-
The content of the study as follow : 1 to choice the ship form, mainly ship ' s overall size ; draft, according to design of shanghai deep - water port and development of container ; 2. to deside the date of width ; depth ; path ; tract and sinkage through simulator tests ; 3. to replenish and modify some date for channel design to very large container vessels in " design code of general layout for sea port " 4. to study ship ' s turning area ; ship ' s stop distance the new and special content of the study as follow : 1. statistics of path at the channel given by difference operators with the affections certain wind. currents. seas and other influences shows the path really needed under certain condition
並可在各類航道和水域的通航安全評估及操船方法,航跡帶寬度,航道寬度,航跡帶分佈,船舶各種航行狀態時的下沉量研究中應用。本課題研究的內容: ( 1 )根據洋山深水港設計規劃和集裝箱船舶的發展趨勢,通過研究、分析、比較,選擇最合適的船型,尤其是船舶主尺度和船舶吃水。 ( 2 )在大量模擬研究情況下,得出進港航道所需的航道寬度和深度。( 5 ) the author researches the relationship between the deep foundation ' s shape, area and depth and the deep excavation dewatering. the formula, which calculates the minimum distance between foundation ' s bottom panel and the confined water layer ' s top panel, was put forward
(五)研究了基坑形狀、面積、深度與深基坑降水相關性,給出了計算基坑底板至承壓含水層頂板間的最小距離公式,分析了針對不同基坑應採用的降水方法。However, due to the complexity of the carrian case, its extent and magnitude were difficult to estimate. the legal department then assigned six crown counsels to work with tf3 to facilitate our legal briefs.
但鑒于這宗案件案情復雜,涉及范圍的闊度及深度一時難以估計,律政署一開始便委派了六名檢察官與專案小組一同工作,方便隨時提供法律的觀點和意見。The system is able to efficiently increase temperature and meet crop requirement of temperature for yield. in researching and designing solar energy conserving system in soil for active greenhouse, it adopts instrument of rhlog, tests temperature of six layers to soil temperature, and draws various curve of temperature. it shows the system can efficiency increase soil temperature and reduces change range of temperature in greenhouse in wintertime
在研究和設計主動式溫室太陽能地下蓄熱系統中,採用溫度自記儀器,測試了室溫及土壤中六個不同深度的溫度數據,繪制了相關溫度變化曲線,該曲線表明了主動式溫室太陽能地下蓄熱系統能有效提高冬季溫室土壤的溫度,並且減小了日溫變化幅度。There are many factors must be desided such as width ; depth ; ship ' s turning area ; ship ' s stop distance during the design of shanghai deep - water channel. very large container vessels. navigating at the channel with the affections certain wind, currents, seas and other influences, may cause more huge damage and expenditures for the accidents without safety operation. some date for channel design to very large container vessels has been gone beyond in " design code of general layout for sea port " and needs to replenish, modify. the purpose of this study is : to choice the ship form, mainly ship ' s overall size ; draft, according to design of shanghai deep - water port and development of container, then to get the date of width and depth of channel through simulator tests
對8000teu 、 5250teu超大型集裝箱船舶的航道寬度設計已超出了該規范的規定范疇,急需補充甚至修改。本課題研究的目的是根據洋山深水港設計規劃和集裝箱船舶的發展趨勢,通過研究、分析、比較,選擇最合適的船型,尤其是船舶主尺度和船舶吃水。在此基礎上,採用船舶操縱模擬器進行航行模擬研究,在大量模擬研究情況下,得出進港航道所需的航道寬度和深度。Based on the full - depth / part - depth shear spring model proposed by luo weide and the theoretical corealation between the pile base resistance and the pile base settlement presented by randolph, a elastic analytical approach for computing the pile compression is conducted
本文利用羅惟德全深度? ?變深度剪切彈簧模型推導了樁身壓縮量的彈性理論解析計算方法,選用randolph的樁端沉降與樁端阻力的關系,利用荷載傳遞法推導了樁身壓縮量的數值計算方法。The principal conclusions include : ( a ) the composite system is composed of both active - bearing structural members and inactive - bearing ones, being of a character of combination of rigid retaining structures with flexible ones, so its working mechanism will be behaved as sharing loadings, waterproof and impermeability, loading transfer, local reinforcement and pre - reinforcement ; ( b ) the experimental results show that much more subsoil will participate in retaining action, soil stresses of internal slope will be shared uniformly and deflections caused by excavation will be reduced notably because of cooperation of nails and cement - soil mixing pile wall ; and ( c ) the internal forces of facing in vertical model will be a control factor of design and the cross section tensile strength of cement - soil wall will govern strength of the
主要研究結論有: ( 1 )復合土釘支護的作用機理主要為臨時加固土體以保證局部穩定、有機聯系以共同承擔荷載、改善土體性質起到止水抗滲作用。 ( 2 )試驗結果表明:復合土釘支護能夠充分調動周圍土體共同作用,有效地控制基坑變形;復合土釘支護中止水帷幕的插入深度和強度對控制邊坡變形與失穩有較大作用;復合土釘支護效果明顯優於一般的土釘支護。 ( 3 )面層與邊坡土體共同變形,設計時可按外力作用下的彈性地基梁進行計算。The basic theory of dewatering, the dewatering calculation methods, the impact of dewatering on the surrounding environment, the definition of hydrogeology parameters and the shape, area and depth of the deep foundation dominate over this dissertation
其中,降水的基本理論、降水的計算方法、降水對周邊環境的影響、水文地質參數的確定、降水井結構以及基坑形狀、面積、深度與深基坑降水相關性是本文的研究重點。Analysis on depth calculation of projectiles penetration into concrete
彈體侵徹混凝土深度計算公式分析Standard practice for calculating pavement macrotexture mean profile depth
鋪地織物中間縱面深度計算的標準實施規程Calculating method of landslides drive force, and determination of the diameters of borehole and anchor cable, the number of the anchor cables, the anchorage length and types of the anchor head as well are also discussed
本文還探討了作用在抗滑樁上的滑坡推力設計值的計算方法,以及錨索材料的選定、錨固深度計算、錨頭類型選擇、錨索與樁的連接設計、施工工藝與質量控制措施、檢測與監測等等。Binocular vision research is one of the most active branches of computer vision technology, including many research aspects such as camera calibration, image acquisition, feature extraction, stereo matching, depth measurement and depth information interpolation
雙目視覺研究是計算機視覺研究中最為活躍的分支之一,主要包括攝像機定標、圖像採集、特徵提取、立體匹配、深度計算及深度信息內插六部分內容。Taking into consideration of the factor include heat diffuse coefficient of soil and time, which affect soil temperature of differential deep, the model can calculates temperature of any time in different depth
模型中充分考慮了土壤熱擴散率、時間對溫室土壤不同深度的溫度影響,可計算出任一時間、土壤不同深度的溫度。In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied
其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。Depth : the depth of the calculation. a higher number results in a long calculation time, but also in finer details
深度:計算深度。一個較大的值會導致很長的計算時間,但是能得到逼真的效果。The paper embodied with fact of hengxin corporation, and focus on the proplem of material purchasing. applying modern theories and means of supply chain administration and logistics administration, through reorgnizing material purchasing management and procedure. through authenticating supplior, we have established the evaluation procedure of supplior to strengthen the management of supplior, and applying computer technology and network technology, and realized electronics, information and centrality of purchasing administration, thus, production is guaranteed, purchasing cost is decreased and market competitive ability is improved. parts of contents and ideas in this paper have been applied in hengxin corporation and preliminary fruits have been gained
本課題結合大連恆新零部件製造公司(以下簡稱恆新公司)的實際情況,針對恆新公司物資采購管理方面存在的問題,通過研究現代物流與供應鏈管理等先進的管理思想和方法,對恆新公司物資采購組織和機制以及采購流程進行重組,同時對供應商進行認證和管理,建立供應商評審程序及招標采購制度,加強對供應商的管理,並應用計算機技術及網路技術,建立基於供應鏈的恆新公司物流管理信息系統,力圖在管理的力度和深度上真正解決該公司物資采購問題,從而節約成本、提高效益、保證質量、提高企業的管理水平和市場競爭力。Abstract : through the survey of master degree theses on landscape architecture from peking university, beijing forestry university, chongqing university, southeast university, south china agricultural university, huazhong university of science and technology, nanjing forestry university, tianjin university, tongji university, and china agricultural university from 1996 to 2006, the analysis in width and depth is made on the aspects like the quantity changes, research areas and directions, research features and existing problems of master degree theses, so as to analyze and summarize the academic research development lines of landscape architecture in china in recent 10 years, and explore the development trend of future academic research of landscape architecture
摘要:通過對北京大學、北京林業大學、重慶大學、東南大學、華南農業大學、華中科技大學、南京林業大學、天津大學、同濟大學、中國農業大學10所院校1996 ? 2006年來風景園林碩士學位論文的統計分類,從廣度和深度兩方面分析碩士學位論文的寫作數量變化、研究領域與方向、研究特徵、存在問題等多方面內容,以期分析總結近10餘年來中國風景園林學科學術研究的發展脈絡,從而探尋未來中國風景園林學科學術研究的發展趨勢。The depth of the drawings and designs for stage d of the project submitted by the designer shall comply with the provisions in exhibit 3 ? requirements from the client on the depth of the design results
設計方提交工程d階段的圖紙設計深度,須滿足附表3 ? ? 《客戶方對設計成果的深度要求》的要求。After structure design aimed to high transconductance, parameters of device structure are modified in detail. the simulation results of soi nmos with strained si channel show great enhancements in drain current, effective mobility ( 74 % ) and transconductance ( 50 % ) beyond conventional bulk si soi nmosfet. the strained - soi nmosfet fabrication process is proposed with lt - si ( low temperature - si ) technology for relaxed sige layer and simox technology for buried oxide
其次,根據器件參量對閾值電壓和輸出特性的影響,以提高器件的跨導和電流驅動能力為目的設計了strained - soimosfet器件結構,詳細分析柵極類型和柵氧化層厚度、應變硅層厚度、 ge組分、埋氧層深度和厚度以及摻雜濃度的取值,對器件進行優化設計。The fourth part inherits the advantages of the traditional performance evaluation system, it establishes pr system which contains three aspects : scope, deepness, potentiality. considering the balanced scorecard, this paper sets up non - financial measurement system including customer employee, organization inner - process, innovation, etc. the system that balances in financial and non - financial measurement perfectly adapts to modern company ' s development strategy focusing on customer satisfaction and market - oriented demand while breaking through the constraints of the traditional performance evaluation system, thus reflecting the effect of company strategy management entirely
第四部分對企業績效評價體系的重新構建進行了初步的探討,從評價的內容、指標權數的確定、指標體系的設置、評價體系的計分方法、評價得分的計算、評價結果的列示和評價得分的修正等幾個方面,詳細論述了本文所探討的以廣度維、深度維和遠度維為中心的三維立體模型。分享友人