混凝土圍堰 的英文怎麼說

中文拼音 [húnníngwéiyàn]
混凝土圍堰 英文
concrete coffer dam
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : 名詞(較低的擋水建築物) weir
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、設計以及施工方案及總進度等與面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. Characterisitics of plastic concrete for impervious core wall of tgp cofferdam

    三峽工程二期防滲墻塑性特性
  3. Blasting monitoring and safety control during the demolition blasting of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游防滲墻拆除爆破震動監測與安全控制
  4. Combining theory with practice, in this thesis, i analyses the content of the construction of steel round the barrage. such as, the structure of steel round the barrage, the arrangement of mooring, the calculation of mooring chain, the manufacture and assembling of steel round the barrage, the moving up connection and sinking of it, confining the bottom of underwater concrete

    本文結合實際工程,詳細分析了鋼的構造、錨錠系統的布設、錨纜的計算、鋼的製作及組拼、鋼的接高與下沉、水下封底等施工的重要內容;並對常用的鋼套箱施工技術進行了討論。
  5. Design and practice of blasting demolition of longitudinal rcc cofferdam at gaobazhou power station

    高壩洲電站碾壓縱向拆除爆破設計與實踐
  6. Secondly, based on the theoretical analysis of the chosen anti - slipping scheme, anti - slipping stress test, strength test of sealed - cover concrete, anti - floating test of cofferdam, stress test of supporting pile and stress test of stability are processed respectively, which proves that the new scheme presented in this paper is feasible

    然後對選定的抗滑方案進行理論分析,分別進行抗滑受力檢算、封底強度檢算、鋼抗浮檢算、支樁受力檢算和穩定受力檢算,從理論上驗證本方案的可行性。
  7. This paper analyzes and explores stress strain model and principle of the project of concrete diaphragm wall after concluding other engineers and project practices and describing the seepage and deformation character of the plastic concrete used in the cofferdam of the second stage of the three gorges project. we analyze and forecast the change trend by using mathematics statistics regression, then we get the best regression equation. finished it, we used this way to the cofferdam of the second stage of the three gorges project. it proves that the method which i have introduce in this article is effective for the stability of concrete diaphragm wall and it is also a valid for supervising cofferdam security after using it in many projects

    本文在總結前人和其他工程實踐的基礎上,結合三峽二期實例綜合分析塑性防滲墻的滲透和變形特性,對三峽二期砼防滲墻的應力應變模型、原理進行了分析、探討,在監測分析資料的基礎上進行數學統計回歸分析,並對變形進行預測,通過對砼防滲墻及體的應力應變監測數據進行數學統計回歸分析,得出了最佳回歸方程,並對三峽二期變形進行預測,達到了對安全性監測評價的最佳效果。
  8. Experimental research of blasting demolition of concrete cut - off wall in second - stage downstream cofferdam of three gorges project

    三峽二期下游防滲墻拆除爆破試驗研究
  9. This paper gives an account of the construction schemes of building artificial islands and sinking concrete cofferdams for shoal piers no. 53 and no. 59, and the construction schemes double - wall steel cofferdams for deep water piers no. 54 ~ 58 of hengyang xiangjiang river bridge on wuhan - guangzhou passenger dedicated railway

    摘要介紹武廣客運專線衡陽湘江特大橋53號、 59號淺灘墩採用的築島、下沉混凝土圍堰施工方案,以及54 ~ 58號深水水中墩採用的雙壁鋼結構施工方案。
  10. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期基礎處理與施工技術;大江截流上下游平拋墊底研究;二期防滲工程研究;大江截流計算機科學管理;大壩澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  11. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期基礎處理與施工技術;大江截流上下游平拋墊底研究;二期防滲工程研究;大江截流計算機科學管理;大壩澆築方案及主要施工機械選型;的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  12. The proportions and performances of plastic concrete of some cut - off walls at home and abroad, the proportion of self - congealing slurry used in the cut - off wall of third stage cofferdam of three gorges project, mechanics properties of expansive soil slurry and harden clay mortar, and proportions of hardened slurry are introduced

    列舉了國內外部分防滲墻工程塑性基本配合比及性能參數;國內自主研發的自灰漿墻體材料及應用於三峽工程三期防滲墻的配合比;固化灰粘漿、膨潤漿的物理力學性能及固化灰漿採用不同制攪方法時的配合比。
  13. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱的全結構模型,相對準確地模擬灌注封底后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  14. Application of combined cofferdam of static pressure grouting and reinforced concrete cage

    靜壓注漿與鋼筋護圈組合的應用
  15. Calculation of blast cut parameters for demolition of a concrete cofferdam and analysis on turnover movement of the cofferdam body

    混凝土圍堰拆除爆破切口參數計算與翻轉運動分析
  16. Its main span, which is 60m long, is made up of prestressed concrete continuous beam. the fourth pier, one of the main piers, adopts the compound foundation constituted with double - siding steel cofferdam and drilled shafts which stands on the deep - water and slopping river bed where geological condition is very complex, so the cofferdam has the trend of slippage

    渝懷鐵路第20標段阿蓬江大橋全長343 . 06m ,主跨為60m的預應力連續梁, 4 #墩是其一個主墩,基礎採用雙壁鋼與鉆孔樁相結合的復合基礎。
  17. The construction scheme is briefly introduced herein, and furthermore, the diversion structures, the composite scheme consisting of open caisson group adopted to treat the overburden of the foundation for the stage 2 longitudinal concrete cofferdam and the diversion method of bottom outlet combined with the dam gap used for the stage 2 diversion are described as well

    文中對該方案進行了簡要介紹,並介紹了有關導流建築物,以及二期縱向混凝土圍堰基覆蓋層採用了沉井群等綜合處理方案和二期導流採用的底孔加缺口聯合泄流方式。
  18. The statistical analysis shows that the temperature control measures have achieved expected result without any temperature - induced harmful cracks occurring in the longitudinal cofferdams

    對各項溫控措施成效的統計分析表明,景洪水電站溫控工作基本取得了預期成效,縱向碾壓至今未發現危害性的溫度裂縫。
  19. River closure of open channel and construction of rcc weir in three gorges project

    三峽工程明渠截流與碾壓混凝土圍堰施工實踐
  20. The three gorges dam will be the largest hydropower station and dam in the world, with a 1. 2 mile stretch of concrete and a 370 mile - long reservoir and 525 feet deep

    工程完成後,三峽將成為世界上最大的水力發電站,擁有1 . 2英里長的縱向、 370英里長、 525英尺深的水庫。
分享友人