混凝土基座 的英文怎麼說

中文拼音 [húnníngzuò]
混凝土基座 英文
concrete pedestal
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. The machine rests on a bed of concrete.

    機器安裝在混凝土基座上。
  2. Concrete emplacement has some shape transition.

    混凝土基座有一些形狀上的改變。
  3. The outer wall of the harbor would be stand on concrete stilts.

    港口的外落在直插海底的椿上。
  4. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮巖與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機與底板整體澆注、採用先進計算理論指導配筋。
  5. Before studying the concrete composite deck pavement, we introduce the basic theory of touching analysis, and come up with the realization of touching analysis in the fem analysis considering the touch of concrete bridge cover plates, asphaltum concrete overlay with bridge cover etc. connect with the experiment on the spot of bridge, the software ansys is used to solidity modeling and analyzing an assembly simply supported bridge before adding overlap, after adding overlap etc., and study the influence of adding overlap on the underside bridge structures

    在進行裝配式簡支板橋復合鋪裝結構的探討性研究前,先介紹了接觸分析本理論,並提出了考慮橋面板板間接觸、瀝青加鋪層與橋面接觸等接觸分析在有限元分析中的實現思路。結合一裝配式簡支板橋現場試驗數據,採用ansys對該橋在加鋪前後進行了實體建模與計算分析,討論了瀝青加鋪層對下部結構物的影響。
  6. Each automatic weather station comprises two masts of about 5m and 10m high respectively and concrete plinths for setting up the masts, equipments and ductwork, with an area of about 10m x 10m

    每個自動氣象站面積約十米乘十米,設有兩支分別約五米高和十米高的桅桿和混凝土基座以裝設桅桿、設備和纜槽。
  7. All of the researches are carried out on the background of a spatial continuous beam - arch composite bridges, and the relative loading experimental results are compared with the calculated values. it indicates that the theory of elastically supported continuous beam method load lateral distribution is a kind of simple convenience and safe practical engineering calculation method. 2 ) the suspender force and correlated modality is analyzed with the use of general calculation program ansys. during testing suspender force, the influence of the rigidity of suspender must be considered

    在此礎上,以一實際的預應力連續梁拱組合體系橋梁為工程背景,採用一般的試驗研究方法對該橋進行了荷載試驗研究,並將有關的荷載試驗結果與理論計算值作了比較,結果表明:所提出的彈性支承連續梁法計算值,與空間有限元分析理論值及荷載試驗測試值本吻合。
  8. The outer wall of the harbor would be stand on concrete stilts

    港口的外?落在直插海底的椿上。
  9. The height of the base shall be sufficient so that the centerline of the suction elbow lines up with the centerline of the suction piping and shall include an allowance for grouting between the concrete base and the pump mounting pedestal in accordance with the pump manufacturer ' s recommendations

    根據泵製造商的建議,泵應該有足夠的高度,使得吸入彎頭的中心線能夠與吸入管道中心線連接起來,混凝土基座與泵安裝之間有足夠的空間用於灌漿。
  10. The shantou bay suspension bridge is the first mordern suspension bridge in china its substructures are mainly towers and anchorages this paper presents some of the key techniques of the substructures construction , including the cable anchorage system setup , the hydrated heat control in the anchorage , construction of the foundation and bearing plate of the tower in the ocean , the control of tower construction , etc

    汕頭海灣大橋是我國第一現代懸索橋下部結構主要包括索塔和錨碇本文介紹了該橋下部結構施工的一些關鍵技術環節,包括主纜錨碇錨固系統的安裝,大體積的溫控防裂,主塔礎和承臺的海上施工,塔柱滑模施工控制等
  11. For example, frp reinforced concrete is used to support or surround magnetic resonance imaging ( mri ) medical equipment, and frp is also used for the constructions of some seawalls, industrial roof decks, base pads for electrical and reactor equipment, anchor in rock and ground engineering and concrete floor slabs in aggressive chemical environments in order to promote the wide usage of frp and frp reinforced concrete structures, financed cooperatively by nationa l natural science foundation ( item : the research on mechanical performance of frp reinforced concrete beam reinforced ; number : 59978046 ) and henan illustrious youth science foundation, connected with the analysis methods of modern steel reinforced concrete structure, the thesis further studies the flexural performance of frp reinforced concrete beam through the systematic study on experimental data got from this kind of beams, systematically establishes the theoretical calculating system of the flexural performance of frp reinforced concrete beam in cooperation with the up - to - date analytical methods for reinforced concrete, which suits the properties of frp

    例如,纖維增強塑料筋應用於支撐和圍繞磁共振成像醫療設備的中及海堤、工業頂棚、電設備、反應設備的、巖工程中的錨桿、侵蝕性環境的結構等海洋工程、橋梁工程、路面工程、巖工程、醫療及化工工程的建設。為了推動纖維增強塑料筋及其結構在工程中的廣泛應用,本文在國家自然科學金(項目名稱:纖維增強塑料筋梁力學性能的研究;編號: 59978046 )和河南省傑出青年金的資助下,通過對纖維增強塑料筋梁正截面受彎性能試驗數據的系統分析,結合現代鋼筋結構學的分析方法,對纖維增強塑料筋梁正截面受彎性能進行了深入的研究,較系統的建立了適合於纖維增強塑料筋特點的纖維增強塑料筋梁正截面受彎性能的理論計算體系。
  12. In light of the simulative research results, three methods are applied to analyze some controversial problems in this kind of structural system ( such as the concrete pouring sequence of continuous ends, the applying sequence of pretensioned force, the removal of the temporary supports, the concrete pouring style of continuous ends, the optimization of constructional reinforcement and prestressed reinforcement ). some important conclusions are drawn : the concrete pouring sequence of continuous ends should be in accordance with the principle of " interval end " ; the removal of temporary supports is also on this principle ( opposite to traditional opinions ). at the same time, other problems such as the shrinkage and creep effects of concrete, the c racking and failure pattern, the optimization of reinforced bars and prestressed bars are also analyzed in detail

    在此礎上,對于目前先簡支后連續結構體系中存在的一些有爭議的問題(如后連續端部澆築和后連續預應力張拉的順序、體系轉換中的臨時支拆除順序、后連續端部澆築方式、后連續端部的預應力筋及普通鋼筋的優化等) ,我們分別運用三種方法進行了細致的模擬分析、研究,並得出了一些具有重要工程意義的結論:后連續端部的澆築順序和后連續預應力張拉的「隔跨」原則,臨時支拆除的「隔跨」原則(此前人們一直認為「對稱澆注和對稱張拉」是最為合理的施工工序) ,的收縮、徐變對先簡支后連續結構體系的影響一般較小等。
  13. On the base of site monitoring on several multi - arch highway tunnels, this paper introduces some site monitoring methods about the force of reinforcing steel bar, the exterior and interior strain of concrete and the displacement of the wall, which aim at the monitoring of middle wall of multi - arch highway tunnel

    在多連拱隧道現場監測工作的礎上,文章主要介紹了主筋軸力量測、表面應變量測、內部應變量測,以及位移量測等針對連拱隧道中隔墻的現場監測方法,並結合中隔墻主筋軸力量剛,給出現場監測及分析實例。
  14. Concrete cradle bedding

  15. The machine rests on a bed of concrete

    機器安裝在混凝土基座
  16. Large diameter prestressed concrete tubular pile is one of the new type of pile foundation structure developed in the period of sixth five - years plan, the category and specifications of this kind of concrete tubular pile improved continually from the only one al type to a, b, c three category including seven types with the development of harbor industry, and applied in more than forty large scale harbor and bridge projects. the advantages of this product such as better structure performance, lower investment and higher construction speed were fully embodied in such projects

    大直徑預應力管樁是我國從「六五」期間開始的新的樁結構形式,隨著港口事業的發展,大直徑預應力管樁的品種與規格不斷得到拓展,從原來的單一的a1型樁發展到a 、 b 、 c三類7種規格的系列產品,在全國四十多大型碼頭和橋梁工程中得到應用,充分體現了大管樁這一產品結構性能好,投資省,速度快的優勢。
  17. The support pedestal shall be designed for anchor bolting to a concrete foundation and shall be of adequate strength and mass to support the combined weight of the pump / motor assembly and all forces imposed by the pump unit during operation

    支撐應該採用錨固螺栓固定在混凝土基座上,應該具有適當強度和質量,能夠支撐泵/電機總裝的總重量,以及泵設備在運行過程中所產生的所有壓力。
  18. Built in world war two as an anti - aircraft base to repel german bombers, the derelict platform was taken over 40 years ago by retired army major paddy roy bates who went to live there with his family

    不過這個「海國」是戰爭時代建早的堡壘,落於北海中的兩根塔柱之上。 「海國」的前身是一個建於二戰時期抵禦德國轟炸的防空地。
  19. The contractor shall provide a concrete pump - mounting base for each pump as shown in the plans

    根據說明書的要求,承包商應該負責為每臺泵配置一個泵安裝
  20. In this thesis, on the basis of the existing successful designs. taking the railway concrete - filled steel tubular x - arch bridge, the first of its kind. in the jiuqu river in the artery running from beijing to shanghai, as an example, the author made a summary of main parameters necessary to design of these bridges, made a comparison between existing calculation three models and performed the internal force calculation, carried out the stability analysis of the bridge under and after construction, discussed the effects of the numbers and positions of the lateral braces on the stability, and also, in the last part, gave out part dynamic analysis result

    本文以我國第一鐵路鋼管拱橋? ?京滬線九曲河提籃拱橋為背景,在搜集已有的拱橋的設計資料的礎之上,對鋼管拱橋的主要設計參數進行了歸納和總結;對九曲河鐵路提籃拱橋的簡化計算模型進行了比較並用簡化模型進行了內力分析;對拱橋在施工期間的穩定性和成橋后的穩定性作了計算,討論了橫撐的位置和數目對拱橋的穩定性的影響;對拱橋的自振特性作了分析。
分享友人