混凝土工事 的英文怎麼說

中文拼音 [húnnínggōngshì]
混凝土工事 英文
concrete wall
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名1 (事情) matter; affair thing; business 2 (事故) trouble; accident 3 (職業;工作) job; wor...
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Because groundwork adopting ferroconcrete structure is chosen in advance, drive error of theodolite working on it is very little and can be ignored

    由於地基是先選好的,多採取鋼筋結構,經緯儀藉助于地基環固定在地面上,作時帶動誤差非常小,可忽略不計。
  2. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司的業務范圍除水電程總承包外,還將業務擴展到各類程、市政程、海程的設計、施、機械設備和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,形成了年完成石方開挖15000萬立方米、澆注1500萬立方米、發電機組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施能力。
  3. This paper presents the experimental results of typical elements of field works such as reinforced concrete beams, fiber glass reinforced plastic honeycomb sandwich plates, flexible covers ; examines the interrelationship of the loads and deformation under the condition of large deformation ; obtains the laws governing the interaction of the medium and the structure ; solves the design and calculation problems related to shallow buried structures in soil

    本文在對大量試驗資料進行整理和作了大量分析計算的基礎上,選取了野戰中有代表性的構件即鋼筋梁,玻璃鋼蜂窩夾層梁式板和帆布被復作為研究對象進行試驗研究。深刻地考察了大變形條件下荷載和變形之間的內在關系,進而掌握了介質與結構相互作用的規律,較好地解決了中淺埋結構的設計計算問題。
  4. It is high performance concrete of low water - binder ratio. with its own gravity and without any vibration, it can fill up the space automatically. with high adding quantity of fly ash and slag, high quality water reducing agent and other compound admixture is the most important technology of this kind of high performance concrete. scc focus on high workability at the same time on high strength and high durability through choosing the composite of aggregate, additives, content of cementions material, admixture reasonably and the optimum design of mix proportion

    本文研究了採用吉林省本地原材料和常規生產藝配製c40自密實的製作技術,採用水膠比、粉煤灰摻量、砂率、膠材料總量四個因素進行配合比的正交設計,試驗分析了自密實拌合物的作性以及硬化后的力學性能、耐久性和生產與施注意項,並對其經濟性做出了客觀評價,本次試驗為吉林地區自密實的推廣應用提供了數據基礎。
  5. It is respectively : production, facility for transporting operates personnel : jockey of lathe work, milling, grinding work, boring labour, solderer, modular machine tool, machining center jockey, casting matchs benchwork, besmear to install ship - fitter of ship - fitter of equipment of benchwork of labour, tool, boiler, electric machinery, discretion to control ship - fitter of appearance of ship - fitter of appearance of instrument of electric equipment ship - fitter, electron, electrical engineering instrument, machine ; irrigation works of aricultural herd fishing produces personnel : inspector of quarantine of the member that animal epidemic disease prevents and cure, animal, firedamp produces work ; personnel of line of business of commerce, service : the member that assistant, bagman, publication is issued, chinese traditional medicine purchase and sale, clerk of the member that the division of division of appraisal appraisal division, chinese style noodle, chinese style noodle, western - style cook division, western - style noodle division, division that move wine, nutrition distributes food, dining - room, antechamber clerk, client clerk, health care ; handle affairs personnel and concerned personnel : secretary, public relations member, the member that terminal of communication of computer operator, cartographer, operator, user is maintained

    分別是:生產、運輸設備操作人員:車、銑、磨、鏜、焊、組合機床操作、加中心操作、鑄配鉗、塗裝具鉗、鍋爐設備裝配、電機裝配、高低壓電器裝配、電子儀器儀表裝配、電儀器儀表裝配、機修鉗、汽車修理、摩托車維修、精密儀器儀表修理、鍋爐設備安裝、變電設備安裝、維修電、計算機維修、手、精細木、音響調音員、貴金屬首飾手製作石方機械操作、砌築、鋼筋、架子、防水、裝飾裝修、電氣設備安裝、管、汽車駕駛員、起重裝卸機械操作、化學檢驗、食品檢驗、紡織纖維檢驗、貴金屬首飾鉆石檢驗員、防腐蝕;農林牧漁水利生產人員:動物疫病防治員、動物檢疫檢驗員、沼氣生產;商業、服務業人員:營業員、推銷員、出版物發行員、中藥購銷員、鑒定估價師、中式面點師、中式面點師、西式烹調師、西式面點師、調酒師、營養配菜員、餐廳服務員、前廳服務員、客戶服務員、保健按摩師、職業指導員、物業指導員、物業治理員、鍋爐操作、美容師、美發師、攝影師、眼鏡驗光員、眼鏡定配、家用電子產品維修、家用電器產品維修、照相器材維修、鐘表維修、辦公設備維修、保育員、家政服務員、養老護理員;辦人員和有關人員:秘書、公關員、計算機操作員、制圖員、話務員、用戶通信終端維修員。
  6. Abstract : the paper describes in detail the construction technology ofelastic monolithic track bed at extra - long qinling tunnel, i. e., selection of material, quality control, preparation and casting of track bed concrete, as well as some points for attention during construction

    文摘:較為詳細地介紹了秦嶺特長隧道彈性整體道床施技術,包括彈性整體道床用料的選擇,施機具的選型,施藝及質量控制,道床製備、灌築,以及施注意項等。
  7. Finally, systemic technology of design and construction of sfrc in tunnel engineering, by the example of gao niangou tunnel, which located at xi " an - an kang railway, and where sfrc was used as permanent lining, was discussed

    最後通過西康線高碥溝隧道採用鋼纖維作為隧道永久襯砌的成功例,系統介紹了在隧道程中,噴射鋼纖維的設計和施技術。
  8. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋程、模板程、程、預應力程、移存梁程、孔道壓漿程、梁體封端程、橋面防水層和保護層程等施環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化配合比,灌注從兩端至中間、先底板、后腹板、再頂板的施順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施質量的施技術;採用重物移運器有效移梁的施方法;壓漿、封端、橋面防水層和保護層施的一些規定和注意項等都是對箱梁製造行之有效的施技術和施方法,並可為以後類似施作借鑒。
  9. In the special fields role, quality control, accessories and equipment for machines or beyond that with measuring system, measuring table systems, linear testing technology as well as with concrete pipe technology, interface and / or with table systems and machinery software is hecht electronic aktiengesellschaft well - known

    Hecht electronic aktiengesellschaft是一家現代化的、可靠的產品供應商,這家供應商從管生產藝,測量裝置,測量臺系統,作臺組系統,位置、方位、項目、姿勢、地位、職位、立場、位、陣地、位、位置度,定位,質量,質量控制,管、筒,滾輪、線圈,切削點、切割點,機器配件和裝備,長度測量技術,機器軟體的製造、銷售。
  10. And we recommend several methods about constructing and the attention of the gt anti - crack material in construction

    同時,介紹了程中裂縫控制的施技術方法及gt新型抗裂的施注意項。
  11. Finally, the case analysis is taken to show and consider the strict request of the harbor construction durability, and to annotate the announcements for the actual application of the concrete in a harbor

    最後以案例分析說明考量港灣程結構物耐久性之嚴格要求,以詮釋港灣實務應用注意項。
  12. In the mean time, i discusses the technology of drill - grouting pile foundation, especially in the technology of drilling works, steel works and concrete works, etc. at last, i put forward the methods in dealing with the common accidents

    同時,本文詳細探討了巖溶地區鉆孔灌注樁施技術,特別是對其成孔藝、鋼筋程、程等進行了重點分析,並提出了針對其常見質量故的處理方法。
  13. Some recycled products are primarily developed for use in public works e. g. asphalt rubber produced from waste tyres for construction of road surface, fill materials containing crushed glass or recycled aggregates for use in drainage layer, road base or non - structural concrete blocks

    實上,某些再造產品主要為公共程開發,例如由廢輪胎製成的瀝青橡膠可用來鋪設路面;含碎玻璃或再造碎石的填料可用來建造疏水層和路基或製造非結構磚塊。
  14. Just in case they do not, the bank will be 70 metres ( 230 feet ) underground, inside concrete walls more than a metre thick and behind a strong security door and a perimeter fence

    即使不行,種子儲藏庫也是在70米( 230英尺)的地下,在超過1米厚的混凝土工事裏面,受到堅固安全的門和周圍的保護。
  15. Based on the author ' s own experience and practice in construction of asphalt concrete pavement for ex - press highways in recent years, selection of rolling machinery, determination of compaction technology, and precautions to take during the construction of highway pavement are expounded in the paper

    摘要結合作者近年來高速公路瀝青路面的施實踐,對碾壓設備的選擇、碾壓藝的確定及施應注意的項做一介紹。
  16. Large diameter prestressed concrete tubular pile is one of the new type of pile foundation structure developed in the period of sixth five - years plan, the category and specifications of this kind of concrete tubular pile improved continually from the only one al type to a, b, c three category including seven types with the development of harbor industry, and applied in more than forty large scale harbor and bridge projects. the advantages of this product such as better structure performance, lower investment and higher construction speed were fully embodied in such projects

    大直徑預應力管樁是我國從「六五」期間開始的新的樁基結構形式,隨著港口業的發展,大直徑預應力管樁的品種與規格不斷得到拓展,從原來的單一的a1型樁發展到a 、 b 、 c三類7種規格的系列產品,在全國四十多座大型碼頭和橋梁程中得到應用,充分體現了大管樁這一產品結構性能好,投資省,速度快的優勢。
  17. With the development of material science and transportation, thin - wall box girder ( including steel girder and prestressed concrete girder ) is used wildly in modern engineering of bridge, but shear - lag problem is arising accordingly, the result it takes can not be ignored, especially broad and low box girder

    隨著材料科學和交通業的發展,薄壁箱形梁(包括鋼箱梁、預應力箱梁)在現代橋梁程中得到了廣泛地運用,但隨之而來是剪力滯后問題相當突出,特別是寬扁箱梁剪力滯效應不容忽視。
  18. A huge actual constructions and tests has proved that the bonding power of the bonding surface is often too small to satisfy the actual stress, and that in the construction of the new to old concrete, the construction process is blind because there are no unified standards of the construction technology, which leads to the quality of the construction is inferior. and in the design process, the designers who can ’ t identify the strength of the bonding surface can not make an accurate, economic and proper design, which will lead to waste or engineering accident

    大量的實際程和試驗證明,結合面的粘結力通常比較小,往往難以滿足實際結構受力的需要,而且在新舊粘結的施過程中,施藝沒有統一的標準,造成施過程的盲目性,最終導致程質量的低劣;在設計過程中設計人員不能判斷出粘結面的強度,這就使設計人員不能準確、經濟合理的做出設計,造成浪費或埋下故的隱患。
  19. If you test or specify material properties of hot mix asphalt, this manual will help you learn the causes of moisture damage and stripping, test methods to evaluate moisture damage potential, treatments to prevent moisture damage, and best practices to minimize moisture damage in hma pavements

    如果你從熱拌瀝青材料性能的檢測作,這本手冊將幫助你了解水損害和脫模的原因,對潛在水損害的進行評估的測試方法,預防水損害的處理方法,以及將熱拌瀝青路面水損害程度降到最低的最實用方法。
  20. For years, he is successively engaged in the theory of elastoplasticity and experimental research of reinforced concrete structure, building aseismic accrediting and strengthening, structural design and project management

    他多年來先後從鋼筋結構彈塑性理論與試驗研究、建築物抗震鑒定與加固、結構設計與程管理等作。
分享友人