混凝土煙囪 的英文怎麼說
中文拼音 [húnníngtǔyāncōng]
混凝土煙囪
英文
concrete stack- 混 : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
- 凝 : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
- 煙 : Ⅰ名詞1 (物質燃燒時產生的氣體) smoke 2 (像煙的東西) mist; vapour 3 (煙草) tobacco 4 (紙煙、...
- 囪 : Ⅰ名詞(煙囪; 爐灶出煙的通道) chimney; funnel; stovepipeⅡ構詞成分。
- 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
- 煙囪 : chimney; funnel; tun; stovepipe; tewel; smoke stack [funnel]
-
Formwork construction of 100 m high concrete chimney shaft
百米混凝土煙囪內井架翻模施工Construction of turnover formwork in reinforcement chimney hydraulic lifting frame
鋼筋混凝土煙囪液壓提升架翻模施工Hoop - stove chimney in the bao - steel incorporated company steel pipe factory regarded as the specifiable object the paper makes systemic studies including investigation and inspection of the reinforced concrete chimney and reliable assess method. some studies performed and results achieved mainly include : synthetical investigation method of the reinforced concrete chimney usage condition is put forward and real usage condition of the hoop - stove chimney in the bao - steel incorporated company steel pipe factory is handled by means of entirely investigation and inspection ; the mostly reason for impairment and defect of chimney locating in steel pipe factory hoop stove is revealed through result analysis of investigation and inspection ; to meet practical requirements that corporations manage industrial building all alone the paper presents condition appraisal method on reliability of the reinforced concrete chimney and assesses the reliability of hoop - stove chimney in the bao - steel incorporated company steel pipe factory
論文以寶山鋼鐵股份有限公司鋼管廠環形爐煙囪為具體對象,對鋼筋混凝土煙囪的調查檢測和可靠性評定方法進行了系統研究,主要研究內容和成果包括:提出鋼筋混凝土煙囪使用狀況的綜合調查方法,並對鋼管廠環形爐煙囪進行了全面調查和檢測,掌握了煙囪實際的使用狀況;通過對調查檢測結果的分析,揭示了鋼管廠環形爐煙囪損傷和缺陷的主要原因;針對我國企業內部對工業建築管理的實際需要,提出鋼筋混凝土煙囪結構可靠性的狀態評估方法,並鋼管廠環形爐煙囪的可靠性進行了評定。Demolition of an inclined water tower by blasting
利用煙道口爆破拆除鋼筋混凝土煙囪Demolition of 60 m - high brick chimney by directional blasting
百米以上鋼筋混凝土煙囪定向爆破拆除技術Chimneys - components - concrete flue liners
煙囪.組件.混凝土煙道襯塊Formwork turnover construction of supper high concrete chimney
超高混凝土煙囪門式鷹架翻模施工Free - standing industrial chimneys - concrete chimneys
獨立式工業用煙囪.混凝土煙囪Free - standing chimneys - part 2 : concrete chimneys ; german version en 13084 - 2 : 2001
獨立式工業煙囪.第2部分:混凝土煙囪Chimneys - components - concrete flue liners ; german version en 1857 : 2003
煙囪.元部件.混凝土煙道內襯Construction technology of hydraulic lifting and turning over formwork for concrete chimney 240 m high
高鋼筋混凝土煙囪液壓提升翻模施工技術The synthetical assess method rendered in the paper is systemic, complete and feasible for engineering application ; not only can the conditions assess method on reliability of reinforced concrete chimney rendered adopts to the requirement of corporation inner management but also the assess result of hoop - stove chimney reliability is compatible with the counterpart obtained in the light of standard appraisal method and the practical bases is provided to spread and apply further the method
論文提出的鋼筋混凝土煙囪的綜合調查方法系統全面,工程應用中具有可行性;提出的鋼筋混凝土煙囪可靠性的狀態評估方法不僅適合企業內部管理的需要,並且在環形爐煙囪可靠性的評定中取得了與規范鑒定方法一致的結論,為該法進一步的推廣應用提供了實踐基礎。Analysis on temperature stress of reinforced concrete chimney
鋼筋混凝土煙囪溫度應力淺析On - site treatment of some defective piles for 120 meter - high reinforced concrete stack
高鋼筋混凝土煙囪部分樁身失效后的現場處理Construction technique of interior masonry and exterior sliding scaffolding without frame of a 120m reinforcement concrete chimney
鋼筋混凝土煙囪無井架內砌外滑施工技術In this paper, a practical example on demolition of a reinforced concrete chimney with height of one hundred meters by directional blasting was introduced, the design of blasting scheme, the determination of blasting parameters, shape and size of blasting cut, the openning of directional window, priming circuit, safety precautions, lining treatment and others were discussed, the details of construction technology were especially described
介紹了百米鋼筋混凝土煙囪定向爆破拆除工程的實例,論述了爆破方案設計、爆破參數確定、爆破切口的形式和尺寸、定向窗的開設、起爆網路、防護措施以及內襯處理等,尤其對施工工藝進行了較為詳細的敘述。Two - track slippage construction technology adopted in 180 meters high reinforcement concrete chimney
鋼筋混凝土煙囪無井架雙滑施工技術Dismantlement blasting in sections for reinforced concrete chimney
鋼筋混凝土煙囪的分段爆破拆除Constructive technology of 240m - high double - tube reinforced concrete chimney
雙筒鋼筋混凝土煙囪施工技術Noheadframe reversal mould construction of reinforced concrete chimney
鋼筋混凝土煙囪無井架倒模施工工藝分享友人