混合型電站 的英文怎麼說
中文拼音 [húngěxíngdiànzhàn]
混合型電站
英文
hybrid plant- 混 : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
- 合 : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
- 電 : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
- 站 : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
- 混合型 : mixed type混合型卷煙 blend type cigarette; 混合型制劑 slurriable combination
- 混合 : (攙雜在一起) mix; blend; mingle; admix; mixture; mix up; interfusion; commixture; blending; cre...
- 電站 : power station電站船 generating ship
-
On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction
本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。Aiming at such problems in combustion system of homemade middle and miniature boiler, as a complex system with the character of dead zone, time variation, serious non - linearity, large time delay, coupling and a lot of disturbance, this paper presents a new set of optimal control resources. by using well - matched control method on system, stable automatic running is realized. having the serious divulgence coals difference a lot from each other in character, instability of chemistry, value of lowest emission of heat, home - made boiler controller is not at all ideal. instead of traditional model that controls the ratio based on proportional control or with the correct signal of the amount of oxygen, this paper, combined with intellect control theory - - fuzzy control and self - optimizing concept, propounded a kind of fuzzy self - optimizing controller to be used in air supplying system of the boiler, and expatiates on the idea of dividing the control process into two parts, dynamic and static to realize, thus meets the demand of homemade boiler economic running
本設計針對國產中、小型電站鍋爐燃燒系統參數時變、嚴重非線性、干擾因素復雜、耦合嚴重、模型不易確定的特點,提出多變量協調控制方案,解決了系統可控性差,難以實現穩定自動運行的問題;在此基礎上,改變以往以煙氣含氧量控制送風的傳統模式,針對國產電站鍋爐設備主體及一、二次送風迴路泄露嚴重,煤種混雜、成分不穩定、燃燒發熱值低、燃燒效率不高等問題,應用智能控制理論中的模糊控制技術,結合自尋最優控制的思想,設計了一種模糊自尋優控制器,應用在電站鍋爐送風控制系統上,並闡述了動靜態兩種實現途徑,通過在線優化風煤配比,實現最佳經濟燃燒,切實保障了鍋爐的經濟運行。Based on the vibration test in yantan hydropower house, in this paper the author adopt les method which belong to three dimensions unsteady turbulent flow numerical analysis to simulate vibration resource characteristics of hydrogenerator set, a harmonic vibration model of powerhouse substructure is put forward to carry out firstly a precise modal analysis and dynamic response analysis for generator floor. the numerical calculation results agree well with the surveyed data in situ
本文結合巖灘水電站廠房振動的試驗研究,採用非定常湍流數值分析的大渦模擬方法進行混流機組水力振動振源模擬;提出一種水電站廠房下部結構簡諧振動模型,首次進行了發電機層樓板結構的精確模態分析和水力激振荷載下的動力響應分析,各項計算結果與實測數據吻合良好。As we all know that damage constitutional law of concrete is fit for solving mass little cracks situation, that fracture mechanics model is fit for solving only a few cracks situation, that separate crack model is only fit for dealing with those cracks whose locations is known firstly. but these situations do n ' t reflect the crack characteristic of the steel liner - reinforced concrete penstocks of the three gorges. so, this paper adopts the smear crack model to simulate crack
基於損傷力學模型更適合解決成群微裂縫問題,斷裂力學模型更適合解決少數裂縫情形,離散裂縫模式只能解決裂縫位置預先知曉的情形,這些都不符合三峽水電站鋼襯鋼筋混凝土引水壓力管道的裂縫特點,為此本文採用彌漫裂縫模式來進行裂縫的數值模擬,該裂縫模式能解決裂縫位置預先不知曉的情形,且能連續分析而無須重新劃分網格。The mathematical model of phase - compounding excitation system, thyristor excitation system and brushless excitation system are given separately. the design of h controller for synchronous generator voltage regulation system is transformed into a mixed sensitivity problem. the uncertainty of synchronous generator model is analyzed in the light of this control object
分別給出了船舶電站相復勵勵磁系統、可控硅勵磁系統、無刷勵磁系統的數學模型,把同步發電機調壓系統h _控制器的設計歸結為混合靈敏度問題,針對同步發電機這一控制對象,分析了其模型的不確定性,建立了同步發電機廣義對象的數學模型。High - capacity hybrid power filter for harmonic suppression and reactive power compensation in the power substation
變電站諧波抑制與無功補償的大功率混合型電力濾波器3. parameters of rheology model have been obtained by careful experimental study of the chief materials of the faced rockfill dam in gongboxia water power station
( 3 )結合在建的公伯峽水電站混凝土面板堆石壩工程進行堆石料流變模型試驗研究,得到流變模型參數。The thesis also introduces the author ' s research work including implementation of a single - chip system based synchronous - meter successfully utilized in marine engine room simulator dms - 2000 which belongs to one key " 211 project " of dlmu : " engine room simulator adopted virtual reality " ; the realization of software interface on " autochief - 4 ship main engine remote control system " ; and the designing and realization of the hardware and software of autopilot for " ship hybrid intelligent control system "
論文介紹了作者結合參加我校「 211工程」重點項目「應用虛擬現實技術的輪機模擬器」的工作,研製完成了「船舶電站並車同步表」並在dms - 2000新型船舶輪機模擬器中獲得成功應用。作者還討論了結合參加導師的科研項目所完成的「 aotochief - 4船舶柴油主機遙控系統」的模擬軟體界面和「船舶混合智能控制系統」課題中的硬軟體設計工作。For example, even if the settlement of the electric car battery miniaturization of safety and practicality issues, the major areas also need to have enough common battery charging station, it can only be used in small - scale, not a large - scale promotion ; hybrid although more real, but the cost is high to high prices, if without certain subsidies and tax concessions, the driving force consumers to buy less natural
比如電動車即使解決了電池小型化、安全性和實用性等問題,也需要全國主要地區有足夠的公用充電站,否則只能在小范圍內使用,無法大規模推廣;混合動力車雖然更為現實,但成本高企使價格居高不下,如果沒有一定的補貼以及稅費優惠,消費者購買的動力自然不大。After the investigation and study of this extruded concrete curb solution overseas, shaanxi provincial bureau of water & electric engineering ( group ) co., ltd. ( spb ) devoted to the research of this new construction method, invented bjy - 40 extrusion curb placing machine, made comprehensive experiments on heihe dam site, and got valuable results, adopted this method in gongboxia hpp main dam construction
在對國外邊墻施工法進行細致調研后,從2001年開始,陜工局率先對這一技術進行研究,研製了bjy - 40型邊墻擠壓機,在黑河工地進行了現場擠壓混凝土邊墻和墊層料鋪填碾壓的綜合試驗,取得了具有參考價值的第一手資料,並在公伯峽水電站面板壩工程中創新採用了這一技術。分享友人