渠南 的英文怎麼說

中文拼音 [nán]
渠南 英文
cu nam
  • : Ⅰ名詞1 (人工開鑿的水道) canal; ditch; channel 2 [書面語] (車輪外圈)outer wheel3 [書面語](盾...
  1. The second part visits the red flag canal and a collective farm in henan, as well as the old city of suzhou

    第二部分參觀了紅旗,還有河的集體農莊,以及古城蘇州。
  2. On the political participation channels of modern gentry

    近代湖紳士的政治參與
  3. Construction of sewers and the north - east river wall and site formation work at tai o, the road improvement works for cheung chau old town, and the reclamation, road and drainage works at yung shue wan, lamma island are in progress

    大澳污水與東北河堤建造工程及地盤平整工程、長洲舊墟道路改善工程,以及丫島榕樹灣的填海、道路及務工程,均在進行中。
  4. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省水北調濟平乾工程襯砌試驗段施工情況,著重從地基處理、墊層料鋪設、混凝土原材料質量、混凝土澆築、成型混凝土割縫及養護幾個方面分析了機械化襯砌混凝土板裂縫產生的主要原因,並針對性地提出了預防及控制措施。
  5. Various sewerage works were outlined in the east kowloon and north south kowloon sewerage master plans drawn up for the area, and these began to be carried out in the 1990s. they included construction of a number of dry weather flow interceptors along the nullah to intercept polluted storm flow, along with the replacement of worn - out and often overloaded sewerage facilities

    東九和九北部及部污水收集整體計劃為該區規劃了多項污水工程,這些工程在九十年代陸續動工,當中包括沿啟德明建造旱季截流設備以截止污染雨水,以及更換負荷過重又殘舊的污水設施。
  6. Standard guide for collection of water temperature, dissolved - oxygen concentrations, specific electrical conductance, and ph data from open channels

    從明中採集水溫溶解氧濃度具體電導性和ph值的標準指
  7. Xin mm institute members embraced marxism through various channels, after which they started publications, set up progressive group, established cultural bookstores, established new style schools, and debated with various trends of thoughts opposing marxism, with mersures marxism was spread broadly in hunan, and bloomed, born fruits on the hot piece of soil of hunan, and hunan became the one most effectly propagating marxism with richest youthful spirit that time

    新民學會的會員們通過各種道接受馬克思主義后,通過創辦刊物、成立進步團體、開辦文化書社、創辦新式學堂,以及與各種反馬克思主義思潮論戰等形式,將馬克思主義在湖傳播開去,使馬克思主義在湖這片熱土上紮下根,開花結果,使湖成為當時宣傳馬克思主義最有成效、也最富有朝氣的省分。
  8. Land resumption for drainage improvement works on lamma island

    丫島收地進行排水改善工程
  9. Measurement of liquid flow in open channels - stream flow measurement - guide for the establishment and operation of a gauging station

    流量測量.第3部分:河川流量測量.第b節:水文測量站建立和工作指
  10. Advertising pokerserving for cigarette wine, food, communication, bank, insurance, agriculture, factory, appliance, estate and government, serving pokerserving yidong, liantong, tsingdao beer, haier, hisesen, koja, wanlida vcd, meidi, xinfei, lifan, dayang, qingqi, qianjing motor, hongxibao cegaret, baxi, hongqiqu, baixiang, shuanhui, kongfu jia, nanjie village, shaoang wine, jinliufu, xiyangpai, luxi poly fertilizer, pesticide, oil, minerals, traffic etc.

    如:移動聯通青島啤酒百事可樂海爾海信康佳萬利達美的新飛,波導聯想力帆大陽輕騎,錢江紅錫包八喜紅旗,白象雙匯孔府家,街村仰韶酒金六福魯西復合肥農藥石油礦產道路交通安全法等禮品廣告促銷宣傳撲克
  11. Addressing the students " complaints, mr pan guoqu, at a simple freshmen orientation ceremony held in the canteen, went to great lengths to explain nantah ' s unfavourable position. he also encouraged the students to accept the adverse conditions, and to endure temporarily the fact that the facilities were inadequate

    在面對同學不斷申訴之下,潘國先生在餐廳里舉行的一個簡單迎新會中,除了苦口婆心解釋大不利的處境之外,也鼓勵同學們逆來順受,暫時忍受設備欠妥的事實。
  12. At about 2 pm this afternoon, police officers from the regional crime unit, kowloon west intercepted seven men at the junction of sai yeung choi street south and nullah road when they were about to board a private car

    下午約二時正,警方西九龍總區重案組探員在西洋菜街與水道交界,截查正要登上一輛私家車的七名男子。
  13. There is another cluster of goldfish shops locates at the section of tung choi street between mong kok road and nullah road and the section of nullah road between sai yeung choi south street and tung choi street

    旺角道與水道的一段通菜街及西洋菜街與通菜街的一段水道也有不少金魚店,也有不少金魚店,出售的金魚同樣美麗奪目。
  14. There is another cluster of goldfish shops locates at the section of tung choi street between mong kok road and nullah road and the section of nullah road between sai yeung choi south street and tung choi street. the fish available are equally attractive

    旺角道與水道的一段通菜街及西洋菜街與通菜街的一段水道也有不少金魚店,也有不少金魚店,出售的金魚同樣美麗奪目
  15. Along the portion of tung choi street between mong kok road and nullah road, as well as the portion of nullah road between sai yeung choi street south and tung choi street, there are more than 60 fish shops selling all kinds of colourful fish and aquarium products, the area is therefore nicknamed as " goldfish market "

    介乎旺角道與水道之間的一段通菜街以及介乎西洋菜街與通菜街之間的一段水道聚集了六十多間商店,專門售賣觀賞魚及水族用品,故有金魚街之稱。
  16. Which is situated in the western of he nan and is drought year in year out and it is a multiple - purpose water supply development with agricultural irrigation, municipal water supply and rural water of men and domestic animals. the irrigation district was designed by he nan water survey designing institute in 1967, and began to be built in 1970. the aggregate main canal and the east - two main canal were built up and began to irrigate partially in 1974. up of the dong song part of the main canal had been built in 1980, and the first periodical project was completed in 1991. one part of the west main canal was built afterward

    省陸渾灌區是河省百萬畝以上大型灌區之一,地處十年九旱的河省西部,是一集農業灌溉,城市供水,農村人蓄吃水為一體的多目標供水工程,灌區於1967年由河省水利勘測設計院開始勘測規劃設計, 1970年開工建設, 1974年建成總乾、東二乾,並通水局部施灌, 1980年完成東一乾東宋以上段, 1991年第一期工程竣工驗收,以後又修建了西乾部分工程。
  17. Ling canal, built some 2, 000 years ago, it links up two major river systems : the yangzi and the pearl, making it a transportation hub between the central plains and south china

    建於2 , 000多年前,它溝通了長江珠江兩大水系,成為了中原與嶺的交通樞紐。
  18. The facilities to be handed over to government or utility companies after completion of the construction works include the reprovisioning works for the tsim sha tsui fire station complex, the police post and the electricity substation, as stated in section 8. 4. 2 of the ifp, and the reprovisioning or modification works for some existing facilities within the development area, like the kowloon south no. 2 salt water pumping station and twin cell box culvert

    須在建築工程完成後移交政府或公用事業機構的設施,包括尖沙咀消防局綜合大樓的重置設施、警崗和電力支站(見發展建議邀請書第8 . 4 . 2節) ,以及發展區內一些現有設施的重置或改建工程,例如九龍二號海水抽水站和雙管箱形暗
  19. The kai tak nullah is also a storm channel situated upstream of the old kai tak airport in south - east kowloon. its catchment includes some densely populated areas such as san po kong, diamond hill, tsz wan shan, wong tai sin and kowloon city

    啟德明正是一條位於九東部舊啟德機場上游的雨水,它的集水區涵蓋多個人口稠密地區,包括新蒲崗鉆石山慈雲山黃大仙和九城。
  20. The light well point drainage method in combination with other measures was successfully used in the treatment of the deformable earth body on the southern side of the outlet channel of the right - bank diversion tunnel at the goupitan hydropower station to make the earth body stable, ensuring the smooth construction of the right guide wall and the foundation pit of the outlet channel

    在構皮灘水電站右岸導流隧洞出口明渠南側土質變形體抗滑治理中採用輕型井點降水法並輔以其配套措施取得成功,使其處于穩定狀態,確保了該出口明右導墻與明基坑的順利施工。
分享友人