測井實驗室 的英文怎麼說

中文拼音 [jǐngshíyànshì]
測井實驗室 英文
well logging laboratory
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : Ⅰ形容詞1 (內部完全填滿 沒有空隙) solid 2 (真實; 實在) true; real; honest Ⅱ名詞1 (實際; 事實...
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平面問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(巖基)承載力的動法進行了研究,為各類地基(包括巖基) ,匯總了動力分析和檢川的參數:針對日前巖土工程界應用樁基設計規范中的難點? ?樁端巖基承載力的確定問題,從巖石內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試四方面進行了深入討論;本文作者根據多年現場載荷試的工程踐,對深荷試裝置的核心部分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有用、簡便、穩定及安個等優點。
  2. 176 drillholes, 9 coreholes, 178 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works along tuen mun road

    176個鉆孔, 9個土芯鉆孔, 178個探,重整48個豎管壓計及一系列的土壤和巖石樣本的
  3. 224 drillholes, 250 trial pits, refurbishment of 48 existing standpipes piezometers, laboratory testing of soil and rock samples obtained from the investigation works and the structural condition survey on existing highway structures along tuen mun road

    224個鉆孔, 250個探,重整48個豎管壓計,將所取得的土壤和巖石樣本進行,以及對屯門公路上現有的公路建築物進行結構狀況勘
  4. In order to meet the requirements of nda measurement, the laboratory of technical research for nuclear safeguards of china institute of atomic energy ( ciae ), is being in charge of developing four sets of nda standards : one set of segmented gamma - ray scanner ( sgs ) uranium standard, one set of sgs plutonhim standard, one set of plutonium isotopic standard, and one set of active well coincidence counter ( awcc ) standard. in this dissertation some pivotal techniques on quality control in developing of nda nuclear standards above were emphatically studied

    中國原子能科學研究院核保障技術重點研製分段y掃描裝置( sgs : segmentedgamma - rayscanner )鈾工作標準樣品、 sgs鈈工作標準樣品、鈈同位素標準樣品和有源中子型符合計數裝置( awcc : activewellcoincidencecounter )鈾工作標準樣品來滿足核材料nda量的要求。本論文重點對上述nda核標準樣品研製過程中質量控制的一些關鍵技術進行了研究。
  5. Abstract : according to sidewall unstable problem during dr illing, the study on sidewall stability is developed. the paper analyses sidewall stress state and sidewall unstable type, and combines with log data and indoor e xperimental result of core. through analysis and calculation, the method of calcul ating slough formation pressure is proposed. by application of the method in 3 wells in yancheng area, result shows that slough pressure section fits in with field practical condition. it supplies some basis for design of drilling fluid d ensity

    文摘:針對鉆壁失穩問題開展壁穩定性研究,文中就壁應力狀態和失穩類型進行分析計算,並結合資料和巖心的結果進行分析,建立了一套計算地層坍塌壓力的方法,結合鹽城地區3口應用對比,坍塌壓力剖面基本吻合現場際,為鉆液密度設計提供了一定的依據。
  6. The drill and petroleum extraction tools test - well is built in room, that not only can ensure that test environment meeting the test request but also is very convenience for equipment maintenance

    整個鉆采工具試建在專用內,既可保證試環境符合試要求,又可極大的方便設備維護。
  7. Rock drillability test is the foundation of prediction rock drillability from well logging data

    內巖石微可鉆性試是巖石可鉆性的基礎。
分享友人