測站布置 的英文怎麼說
中文拼音 [cèzhànbùzhì]
測站布置
英文
layout of station-
Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems
接著系統的論述了高空散裝法和分單元安裝法兩種樹狀結構吊裝方案,樹狀結構吊裝機械及平面布置,樹狀結構胎架及節點的搭設,以及樹狀結構樹干、樹枝和節點的吊裝工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。Abstract : a research on theory and practice is conducted on the acoustic methods of discharge measurement in low head hydropower plant. taken hydraulic efficiency experiment in certain hydropower plant as examples, the general methods about how to locate the discharge measurement plane, install transducers and choose the integration methods are put forward. an improvement method is proposed finally
文摘:從理論上和實踐上,對低水頭電站超聲波測流進行了較為詳細的研究,並以某水電站為例,對測流斷面定位、聲路布置和面積積分給出了一般方法This paper draws lessons from the design experiences of domestic large scale power station which uses gis technology and combines with the 330kv gis design of the gong bo xia and li jia xia power station that are designed the northwest investigation design and research institute. this paper not only advances some common questions about gis such as selecting model and demonstrating, compiling technology standardization of the device, layout and design, test, enviromental protection and maintenance, etc, but also supplies effective solution commonly used in engineering
本論文借鑒國內採用gis技術的大型電站的設計經驗,結合國家電力公司西北勘測設計研究院承擔的公伯峽、李家峽電站330kvgis設計,提出gis在選型論證、設備技術規范書編寫、布置設計、試驗、環保維護等方面的常見問題,並提供在工程應用中較常用的有效的解決措施。The web page displays the locations of occurrence of heavy rain with amounts greater than 50 mm in 24 hours on a map together with the observation data
網站每日四次發布全球各地二十四小時雨量大於50毫米的數據及觀測地點,並以地圖方式顯示觀測位置,方便瀏覽。( 3 ) the optimized strategy analysis on retrieval of gps water vapor the optimized strategy analysis on retrieval of gps water vapor has been carried out under different data processing schemes by using gps observation. the parameters selection problem has been resolved in gps water vapor retrieval process such as the optimum number of adopted igs stations, the relation between single station processing and united station processing, network layout, cut - off angle, zenith delay parameter, period, knot position and so on
( 3 ) gps水汽反演優化策略分析利用gps觀測數據,使用多種數據處理方案,進行gps水汽反演優化策略分析,初步解決了進行gps水汽反演中引入igs站的最佳個數、單站解算和聯合解算的關系、網路布局、截止高度角、天頂延遲參數、時段長度、節點位置等選擇問題。In this paper, there are presented that a single stationary station single target passive bearings - only tracking and data association algorithm and a simplified single stationary station multiple target passive bearing - only tracking and data association algorithm, then a single stationary station multiple target tracking problem can be regarded as a single stationary station single target tracking problem. 3. based on least square method, this paper presents the line - of - sight location method of multiple stationary station single target
針對實際無源探測網路中存在同一探測區域內只布置了一個無源聲音探測傳感器站的情況,給出了一種單靜止站單目標無源純方位定位與跟蹤的演算法,提出了一種簡單的單靜止站多目標無源純方位定位與跟蹤的演算法,從而將單靜止站多目標問題轉化為單靜止站單目標問題。There are five survey stations in the south and north main trench of xiaoxiang reservoir. the system watches real time the change of water level and the quantity of flow in the five survey stations. so the water resource can be managed systematically and scientifically, some unrational and unscientific management for human subjectivity as before will be avoided
瀟湘水庫的南乾渠上布置了瀟湘水庫站點、層板廠站點、南乾渠管理所站點、湯家山村站點和大觀音山村站點五個測點,系統實時監測這五個測點的水位和流量的變化,使灌區對水資源的管理達到系統化、科學化的高度水平,避免灌區的人為主觀管理的不合理性和不科學性。分享友人