游水的距離 的英文怎麼說

中文拼音 [yóushuǐde]
游水的距離 英文
swim
  • : Ⅰ動詞1 (人或動物在水裡行動) swim 2 (各處從容地行走; 閑逛) rove around; wander; travel; tour 3...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ名詞1 (距離) distance 2 (雄雞、雉等的腿的後面突出像腳趾的部分) spur (of a cock etc )Ⅱ動詞...
  • : Ⅰ動詞1 (離開) leave; part from; be away from; separate 2 (背離) go against 3 (缺少) dispens...
  • 游水 : 1. (在水裡游) swim 2. (姓氏) a surname
  • 距離 : 1 (相隔的長度) distance; range; gap; space; spacing; separation 2 (相距) be apart from; be aw...
  1. Install 5 pipe diameters minimum downstream from pump discharge or elbows to avoid flow turbulence. flow straighteners may be required in extreme cases

    安裝在泵排泄口或彎管下至少5倍管道直徑地方,以避免產生流擾動。在極端情況下,可能需要流向矯直裝置。
  2. According to the result of physical modeling, the regression equation about the decrement of tidal bore height, the percentage of water - resisting area and the distance away from the upstream bridge site is constructed in this paper, the regression equation can be applied in the impact which bridge has on the tidal bore height in qiangtang esturary

    根據模型試驗結果,建立了涌潮高度減小值與中潮位橋墩阻面積百分比和上橋址多元回歸方程,可供錢塘江河口建橋對涌潮高度影響計算參考使用。
  3. The analyzed results are as follows : the late 1960 ' s cutoff of riverbends increased both the runoff amount and the sediment transport amount of the lower reach of jingjiang river, while the sediment deposition decreased in the lkngting lake area ; after the mid 1980 ' s, both the middle reach of yangtze river main stem and the dongting lake occurred a trend of decreasing annual sediment transport as a result of decreasing sediment releasing from the upper reach of yangtze river ; and in the recent 3 years ( 2003 - 2006 ), the three gorges reservoir first impoundment additionally reduced the sediment concentration in the middle reach of yangtze river flow with a long time, so a distance would be quite long for suspended sediment recovery, but the distance for bed - material load of suspended sediment recovery would be quite short

    分析結果表明: 20世紀60年代下荊江裁彎后,三口(松滋口、太平口、藕池口)分流分沙減少,下荊江徑流量和輸沙量相應增加,洞庭湖泥沙淤積減少; 80年代中期以後,長江中幹流及洞庭湖出口年輸沙量呈減少趨勢,城陵磯至武漢河段河床由淤積轉為趨向沖淤平衡;三峽工程初期蓄運用后,長江中含沙量沿程恢復較長,但床沙質部分恢復相對較短。
  4. He could do it in an hour, and how many times had he, for pure pastime, continued in the water for more than twice as long ! at once dant

    三里路他在一小時內就可以到,從前,純碎是為了消遣,他曾多次在過兩倍于那麼長
  5. Giuseppe mangano, who can see the strait from his house in messina, sicily, completed the 3, 700 metre yards crossing despite poor weather conditions, high waves and being stung by two jellyfish

    盡管橫渡海峽當日天氣惡劣, giuseppe在途中還遭遇了巨大海浪以及被兩只母纏繞境況,但他還是完了全程3700米
分享友人