游蕩河段 的英文怎麼說

中文拼音 [yóudàngduàn]
游蕩河段 英文
wandering reach
  • : Ⅰ動詞1 (人或動物在水裡行動) swim 2 (各處從容地行走; 閑逛) rove around; wander; travel; tour 3...
  • : Ⅰ動詞1 (搖動; 擺動) swing; sway; wave 2 (無事走來走去; 閑逛) loaf; wander; roam; loiter; go a...
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ量詞(部分) section; segment; part; paragraph; passage Ⅱ名詞(姓氏) a surname
  • 游蕩 : loaf about; loiter; wander
  • 河段 : [水文] channel segment; stream segment; reach
  1. The evaluation results of dike breach risk show the following distributing regularities of the hang river dike breach risk in the lower yellow river : ( 1 ) the dike breach risk increase with the increasing of flood. ( 2 ) dike breach risk decreases with the river types change along channel. ( 3 ) the reaches of greater dike breach risk mainly distribute in wandering reaches

    評價結果表明黃決溢風險具有以下分佈規律: ( 1 )決溢風險隨著洪水量的增大而增高; ( 2 )決溢風險隨型的沿程變化而降低; ( 3 )決溢風險較大的集中在; ( 4 )南岸的決溢風險相對較高; ( 5 )彎曲型北岸決溢風險高於南岸。
  2. The river section from tieshu, mengjin, henan province to gaocun, shandong provice, is a wandering section, with the length of 299 km. the section are wide and shallow, the flow state of the section is turbulent with a swing mainflow

    下遊南孟津鐵謝至山東高村299公里道寬淺,勢散亂,主流搖擺不定,是黃下遊道整治的重點和難點。
  3. In order to control the flood and to mitigate wangering of the section, since the beginning of building water control works on the yellow river, some 3700 dams, battlements and revetments have beed set up. these works have played an impotant role in flood control

    人民治黃以來,為了有效地控制洪水,減少主流范圍,在該已修建了3700多道由壩、垛、護岸組成的道整治工程,對保障防洪安全起到了重要作用。
  4. Because the yili river belongs to plain broad and shallow moving river, the main channel changes greatly and swings to a large range, which leads to river crooked branching river type and s curved, many fork rivers, the river continent and the river beach in river center, alluvial shoal and beach. the width in some section of the river is up to about 3800m. in flood season it causes serious harm to farmland, factories, residents along two sides

    由於伊犁屬于平原性寬淺流,主槽變化不定,擺動幅度極大,道多呈彎曲分叉型和s型彎道、多叉心洲,心灘和沖擊淺灘及邊灘,部分床寬度達3800m ,洪水季節對道兩岸的田地,工廠,居民等造成極大的危害,素有「三十年東,三十年西」之稱。
  5. Based on the analysis of satellite images of various periods, landform data and river channel transverse section evolution in the lower yellow river, the characteristics of the river channel boundary condition changes at different location are clarified as middle flood channel flood transport width and area are evidently decreased especially for the main channel with comparison to 1950s, beach area that is unimpeded before become blocked because of road, irrigation channel constructed on it, and consequently intensify high edge of beach and lowering dyke and river

    在現場查勘的基礎上,通過對丹江口水庫和小浪底水庫攔沙初期下遊道演變、排洪能力變化特點的對比,分析了黃防洪面臨的新形勢:小浪底水庫攔沙初期,下遊道發生沖刷,但艾山以下窄沖淤變化不大,近年來形成的淤積萎縮的狀況難以很快改觀,調整劇烈,工程出險機遇增大,道水位流量關系中水流量以下部分同流量水位明顯降低,中水流量以上部分水位降低幅度可能會明顯偏小,防洪形勢仍不容樂觀。
  6. Thus, it is neccessary to analyze and predict the change of this wandering river section, so that to adopt the suitable counter - measures in advance

    如何分析和預測小浪底水庫運用后勢變化,及早預籌對策,就顯得十分緊迫和必要。
  7. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用后水沙變化這一主要矛盾,通過分析研究以往典型時期的水沙特點和道演變特點,收集分析床邊界條件變化資料,小浪底水庫運用后水沙資料變化,結合現有道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊勢變化的規律和特點,探索小浪底水庫運用後下遊勢變化情況,分析預測道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個在2010年, 2010年至2020年期間的勢變化趨勢,為分析的防洪形勢,指導道整治工程建設的規劃和工程安排提供決策參考和依據。
  8. When xiaolangdi project completed and put into orperation, the inflow of water and sediment condition will be changed because of the regulation of the reservoir. especially the initial 14 years, the reservoir will hold up sediment and release clear water, which may affect the river sections in henan province, especially the wandering sections. it will result in changes of flow state and endangering the water works, because the longitudinal addend by scouring and lateral slope failure

    小浪底水庫建成運用后,通過水庫的調水調沙,改變了黃的來水來沙條件,尤其是運用的前14年處于攔沙期,下泄清水,對道的影響最為劇烈,對勢變化將產生很大影響,道縱向沖刷下切,橫向灘岸坍塌,工程出險將大量增加。
  9. Impact of flood events from different source areas on channel transects adjustment at the wandering - braided reach of the lower yellow river

    不同來源區洪水對黃游蕩河段床橫斷面形態調整過程的影響
分享友人