溢水試驗 的英文怎麼說
中文拼音 [yìshuǐshìyàn]
溢水試驗
英文
flooding test-
In accordance with some wolfram - tin effuse come from cleaner in aconcentrating mill, this study adopt vibrate dslimes shaking table combining with centrifugal separator to put up a roughers. tousegravity - flotation and magnetic con - centration as combined proces s of technology, succeed in solving a problem of multipurpose returning in wolfram - tinslimes
針對某選廠廢棄的鎢錫精選溢流進行了選礦試驗研究,採用振動礦泥搖床與離心機組合粗選,運用重選浮選磁選(水冶)聯合工藝流程,有效地解決了鎢錫細泥綜合回收問題。Hydraulic model test of spillway in baiyinhua reservoir
白音花水庫溢洪道水工模型試驗研究Taking bench shooting of the shuibuya yihongbao project as example, it makes use of the digital television system of drilling overall - hole wall to actually measure, the testing result of lateral fractural range is 4 - 5m, and that of bottom fractural range is about 3m
本文試驗工作是以水布埡溢洪道工程梯段爆破為實例,採用鉆孔全孔壁數字電視系統對混裝乳化炸藥爆破破裂范圍進行了實際測試,測試結果為:側向破裂范圍為4 5m ,底部破裂范圍值為3m 。Research on the jet bucket shape of spillway of lan du water project
蘭督水利樞紐溢洪道挑流鼻坎體型試驗研究Each tenant shall fully and effectually indemnify atl against all claims and demands made against atl by any person in respect of any loss, damage or injury caused by or through or in any way owning to the overflow of liquids, or the escape of fumes, smoke, fire or any other substance or thing from the demised premises or to the neglect or default of such tenant ' s servants, agents or to the defective or damaged condition of the interior of the demised premises or any fixtures or fittings for the repair of which such tenant is responsible hereunder or against all costs and all expenses incurred by atl in respect of any such claims or demand
對于由於已轉讓房地產的溢水、溢出的煙、吸煙或火及其它任何物質,或由於這樣的承租人的僱工、代理人的疏忽或未履行的責任,或由於已轉讓房地產或者任何裝置的內部的缺陷以及損壞以任何方式造成的任何損失與傷害,每名租戶應完全並且有效地使高級技術試驗所不受任何人的任何索賠與要求的損害,承租人應在下面對此負責維修或承擔全部由高級技術試驗所所遭受的任何有關這種索賠與要求的全部費用The test on the hydraulic model of the spillway of shangjiao reservoir in lingchuan county
陵川上郊水庫溢共道水工模型的試驗To improve the flow pattern and discharge capacity of the spillway of bashan hydropower station, the left guide wall ' s form of the spillway ' s entrance channel is optimized by series of model tests
摘要為改善巴山水電站溢洪道進水渠流態、提高泄流能力,通過一系列試驗優化了溢洪道引水渠左導墻頭部曲線型式。分享友人