溢流流量計 的英文怎麼說

中文拼音 [liúliúliáng]
溢流流量計 英文
weir gauge
  • : Ⅰ動詞(充滿而流出來) overflow; spill Ⅱ形容詞(過分) excessive
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 溢流 : effluent flow
  • 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
  1. On the basis of actural engineering projects, discussion is presented of some problems in the design of storm sewer system, such as the decision of design parameters for rainfall reappearing periods and closure multiples, the determination of water - collecting positions, the connecting methods of intercepting storm - sewage system with intercepting main pipes and he calculation of flow capacity of overflow traps

    摘要結合工程實際對雨水管渠設中的設重現期、截倍數等設參數的選擇、雨水集水點位置的確定、截式合制管渠與截干管的連接方法以及算等問題進行了探討。
  2. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山水庫岸邊洪道為例,算了洪道上所受的水荷載及其分佈,為土石壩坡和護面的穩定分析提供了依據。通過算證實了既使在較大的單寬下,緩坡上的階梯仍有較高的消能率。
  3. In order to calculate quantitatively the process of rainfall - runoff, the css model of zhang cha catchment is developed based on epa ’ s swmm ( storm water management model ) in this paper. and then calculate cso spill water quality 、 spill volume and spill time at different intercepting ratio using the developed swmm, and analyze the effect on them by intercepting ratio

    為了實現上述降雨?徑過程的定算,本文引入美國環保局的城市暴雨水管理模型( swmm )建立了佛山市張槎排水區的合制排水系統模型,使用該模型算了不同截倍數時污水的水質、水以及時間,並分析了截倍數對它們的影響。
  4. Thus it is very difficult to calculate the spill volume and water quality because they involve many processes such as rainfall, yield runoff of rainfall 、 flow concentration of surface runoff, ground pollutant build up 、 washout, the flow concentration of combined drainage system and cso

    其中,合制排水系統的、水質的確定涉及到降雨,地面產、匯,地表污染物的累積、沖刷,污水在管渠中的匯以及等多種因素,採用一般方法很難定算。
  5. Secondly, the main stuctures of the software and hardware parts of the control system are introduced. principles and realization of the main functional blocks of these two parts are illuminated. on the hardware of the system, parts of control circuit and the design and debugging of peripheral circuits are discussed thoroughly. based on the hardware circuit, the software is programmed with assembly language. dual close loop vector control weth feedback of speed and current are realized. the flow charts of main programme and pwm interrupt service routines are given. the important control strategies of vector control pmsm such as current sensint and scaling, speed sensing and scaling, bector co - ordinate transformation, generation of sine and cosine, pi regulators, svpwm vector modulation and so on are all accomplished in the pwm interrupt sevice routines. in order to unite all the variables in the programme, scaling is used

    硬體方面主要論述了控制電路各部分及外圍輔助電路的設和調試。在硬體的基礎上,軟體採用匯編語言編程,實現了轉速和電雙閉環矢控制。給出了系統主程序和pwm下中斷處理程序程圖, pmsm矢控制的主要控制策略如電采樣與定標、速度采樣與定標、矢坐標變換、 sin和cos值生成、 pi調節、 svpwm波形生成等都是在pwm下中斷服務子程序中完成的。
  6. Focused on assessment & compensation for oil pollution damage from ships in dalian bay, the dissertation first makes a deep analysis of the inflection factors to oil pollution damage and then evaluates respective mathematical model, such as measurement of oil property, general models for diffuse and volatilization of such substances according to the numerical simulation of the tidal dynamics in the water of dalian bay. based on the corresponding oil pollution regulations, the scope and judgment criteria of oil pollution compensation are laid out. respective compensation measurement methods are developed after those of more mature international practice

    文中剖析油事故可能造成損害程度大小的影響因素,包括建立石油化學數據庫並將油品特性進行化及通過對大連灣潮和潮位的算,建立油擴散、揮發模型等;依據現行油污賠償法規,確定油污損害應予賠償的范圍和判定標準;吸收和借鑒國際上相對成熟的評估技術,建立各項損害的賠償算方法;運用visualbasic6 . 0對損害評估部分進行了算機編程實現。
  7. ( 6 ) 3d integer model of spillway and frusta of brake are established and numerical computation of 3d viscous flow over spillway is completed. the influence of frusta of brake for design parameters such as shape of free surface, pressure on dam, flux coefficient is computed aim at type of frusta of brake and disposal on dam and compute result of different type of frusta and disposal model is compared

    6 )通過建立壩和閘墩的三維整體模型,完成了對三維過壩水場的數值算,針對閘墩的型式及在壩面的布置算了閘墩對水面線形狀、壩面壓力、系數等設參數的影響,並將不同墩型與布置形式的算結果進行比較。
  8. The flow field and pressure drops in the hydrocyclone were calculated numerically based on the k - e model modified for anisotropy and simple algorithm. the effects of operating parameters such as split ratio and feed flowrate on pressure drop were analyzed. the calculate results was compared with those obtained in experiment

    因此,本文採用各向異性-模型及simple ( semi - implicitmethodforpressure - linkedequations )演算法對水力旋器內場及壓力降進行了數值模擬,分別考察了比、進料管幾何尺寸等對壓力降的影響,並把得到的數值算結果與實驗值比較,證明本文的算結果是可以接受的。
  9. In order to study the characteristics of the stepped spillway overflow comprehensively and seek for the measure to increase the energy dissipation of the stepped spillway at large unit discharge, the method of turbulence numerical simulation and model test are used to study the stepped spillway overflow. in view of the curved free water surface, complicated boundary condition and turbulence flow, it very difficult to simulate the stepped spillway overflow

    為了對階梯壩面場特性進行全面的研究,同時探求在大單寬下提高階梯壩消能率的措施,本文採用紊數值模擬與實驗相結合,數值算為主、實驗為輔的研究方法對階梯壩面場進行了較系統深入的研究。
  10. At the same time, study on the relation between them needs calculating quantitatively combined sewer system overflow ( cso ) spill volume 、 time and water quality and study the self - purification of contamination in receiving water

    研究截倍數與水體環境質之間的關系,則需要定算合制排水系統的、水質以及時間,並在此基礎上研究污水在水體中的凈化過程。
分享友人