滑模施工 的英文怎麼說
中文拼音 [gǔmóshīgōng]
滑模施工
英文
slip-form construction- 滑 : Ⅰ形容詞1 (光滑; 滑溜) slippery; smooth 2 (油滑; 狡詐) cunning; crafty; slippery Ⅱ動詞(貼著物...
- 模 : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
- 施 : Ⅰ動詞1 (實行; 施展) execute; carry out 2 (給予) exert; impose 3 (施捨) give; hand out; best...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 施工 : be in the process of construction; be under construction; build; construction
-
Abstract : duri ng concrete deep well constructi on , because of thediffi culti es i n engi neeri ng geographi cal conditi ons , the ordi nary bilateral hydrauli c sli di ng formwork technology can not be adopted. therefore , an unilateral sli di ng formwork technology lifted by chai n block method can beappli ed to advantage and better solved the proble m
文摘:在混凝土深井施工中,由於受地理環境的限制,不能內外安裝模板時,難以應用一般的液壓滑模施工技術,而採用單面模板、鏈條葫蘆提升滑模工藝,可較好地解決這一問題。The cement - concrete road paver and it ' s craft work of the construction
滑模式水泥混凝土攤鋪機及其施工工藝In this study, sts - - the steel construction design module of pkpm, a software program of china " s institute of the construction science - - is employed to create the construction model in order to study the construction of the supporting seat. a mechanical analysis of the variant arched girders was implemented, with the result that consturction documents meeting mechanical requirements were designed for the hinge support, the roller support and the steel girders
本文採用中國建築科學研究院pkpm軟體的鋼結構設計模塊sts ,從結構建模入手,根據規范要求研究了支座的構造形式,通過對變異拱梁的力學分析,設計出符合力學模型的鉸支座、滑移支座和變異拱處鋼梁的施工圖。Especially, some new advanced techniques such as integral casting concrete, integral sliding formwork are firstly applied in this project in china. a new style bridge girder erection machine which can lift a piece of box girder weighting 300 tons once was designed and manufactured successfully
特別是本工程首次採用的一次性整體澆灌混凝土工藝、整體滑動模板設計、以及300噸拆裝式架設機的研製成功,為今後同類產品的施工提供了一些新思路和寶貴的實踐經驗。Slipform construction of songshan spillway weir gate pier on songjianghe river
松江河松山溢洪道工程堰首閘墩滑模施工Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders
其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。Based on above mentioned reasons and in order to get good use of the limited construction space, movable framework construction method is used
鑒于以上原因,採取了「見縫插針,滑動模架」法施工方案。Edge collapse, honeycomb and surface voids in the slipform paving cement concrete and shrinkage of hardening concrete used in highways are studied in this paper, which is a part of western traffic project, frost resistance of cement concrete, supported by traffic ministry of china
本文針對交通部西部交通項目水泥混凝土抗凍融耐久性能研究中高速路面混凝土滑模施工過程中的塌邊和麻面以及硬化混凝土收縮等現象展開研究。The shantou bay suspension bridge is the first mordern suspension bridge in china its substructures are mainly towers and anchorages this paper presents some of the key techniques of the substructures construction , including the cable anchorage system setup , the hydrated heat control in the anchorage , construction of the foundation and bearing plate of the tower in the ocean , the control of tower construction , etc
汕頭海灣大橋是我國第一座現代懸索橋下部結構主要包括索塔和錨碇本文介紹了該橋下部結構施工的一些關鍵技術環節,包括主纜錨碇錨固系統的安裝,大體積混凝土的溫控防裂,主塔基礎和承臺的海上施工,塔柱滑模施工控制等Hydraulic slip - form method applied to the complicated cross - sections in the construction of long - diametered loading houses
大直徑復雜截面裝車倉液壓滑模施工技術Concrete quality control of slip - form construction in winter
冬期滑模施工混凝土質量控制Application of sliding form construction technique in hongye - 2 hydroelectric power station surge shaft concrete placement
紅葉二級水電站調壓井豎井滑模施工技術Slip - form construction of sludge digestion tank of one sewage treatment plant
某污水處理廠消化池簡體滑模施工Uprightness transporting ways in slipform construction of top chimney
高聳煙塔滑模施工的垂直運輸方法A model of multi - object and multi - attribute fuzzy evaluation on civil engineering construction
水泥筒倉滑模施工混凝土質量控制Technical specifications of slipform construction on cement concrete pavement for highway
公路水泥混凝土路面滑模施工技術規程Analysis on the application of the cold rolled die in slip - form construction of ten thousand ton silo
冷軋板模具在萬噸筒倉滑模施工中的應用Application of the operation platform system of the big - diameter thin - wall barrel - storage slip form construction
大直徑薄壁筒倉滑模施工操作平臺系統應用技術Hopewell centre was his other pride, because of its unique architectural and engineering design ( the " slipform " method which enabled him to erect one high - rise floor every three days ) and the access it provides for commuters from queen s road east to kennedy road
合和中心是他另一項引以為傲的成就。合和中心設計特別,他用了獨特的滑模施工技術,創造了三天建一層樓的紀錄。4 when keeping the cement quantity and water ratio changeless, it will increase the slump constant for at least 10cm to mix into fnj l, and the concrete strength after hardening is equal to the reference concrete
2用於夏秋季節施工和大面積滑模施工。調節摻量,可有效地控制砼的凝結時間,摻量可調范圍大,塌落度損失小。分享友人