滲漏管 的英文怎麼說

中文拼音 [shènlóuguǎn]
滲漏管 英文
leaky pipe
  • : 動詞(液體慢慢地透過或漏出) ooze; seep
  • : Ⅰ動詞1 (從孔或縫中滴下、透出或掉出) leak; drip 2 (泄漏) divulge; disclose; leak 3 (遺漏) le...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 滲漏 : percolation; seepage; leakage
  1. The unique feature of a wet amd is that it consists of some ingrowing abnormal vessels from the choroids called choroidal neovascularization. cnv are abnormal vessels that leak and bleed easily

    濕性老年黃斑退化的特徵是脈絡膜出現不正常的新生血稱為脈絡膜血增生,這些新增的脈絡膜血很易和出血。
  2. The unique feature of a wet amd is that it consists of some ingrowing abnormal vessels from the choroids called choroidal neovascularization ( cnv ). cnv are abnormal vessels that leak and bleed easily

    濕性老年黃斑退化的特徵是脈絡膜出現不正常的新生血(稱為脈絡膜血增生) ,這些新增的脈絡膜血很易和出血。
  3. The continuing leakage is the result of the long crack in the pipe.

    這根子上的那一條裂縫致使不斷。
  4. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣線、給排水道、設備安裝為2年; 5 、裝修工程為2年。
  5. Make sure drains and pipes do not leak or arent blocked. do not alter them without prior authorization. repair immediately if there is a defect in the trap or smell of foul air is coming from drain outlets

    確保排水口及喉沒有或阻塞未經批準,切勿擅自將渠改道如隔氣彎有損毀,或排水口發出臭味,應立即維修。
  6. Non - destructive testing of steel tubes - part 2 : automatic eddy current testing of seamless and welded except submerged arc - welded austenitic and austenitic - ferritic steel tubes for verification of hydraulic leak - tightness

    的無損檢驗.第2部分:檢驗液壓密封性用無縫和焊接奧氏體和奧氏體鐵素體鋼
  7. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  8. Fundus examination revealed multiple microaneurysm, hard exudate, and macular edema in the left eye ; an abnormal vascular segment across the macular region was found in the right eye

    雙眼螢光眼底攝影發現左眼有明顯的柯氏癥毛細血擴張與染料,右眼無染料現象。
  9. Test methods for leakage detection in pipeline and tank

    道儲罐檢測方法
  10. In the simulation of close water test, varied profiles of velocity of flow are obtained at different leakage location along the detected pipe, the variety values of the water level in the check well are acquired with time, consequently the location of the leakage can be judged

    在閉水試驗時,通過模擬沿道長度方向上不同水點的流速的變化,以及得出窨井出口處的水位隨時間的變化值,來判斷段中最有可能出現點的位置。
  11. Specification for non - percolating layflat delivery hoses and hose assemblies for fire fighting purposes

    滅火用無排水扁形軟與軟組件規范
  12. Make sure drains and pipes do not leak or aren t blocked

    保持渠暢通及沒有,切勿擅自將渠改道。
  13. Make sure drains and pipes are free from blockage and leakage. do not alter them without prior authorization

    保持渠暢通及沒有,切勿擅自將渠改道。
  14. Make sure drains and pipes do not leak or aren t blocked. do not alter them without prior authorization. repair immediately if there is a defect in the trap or smell of foul air is coming from drain outlets

    確保排水口及喉沒有或阻塞未經批準,切勿擅自將渠改道如隔氣彎有損毀,或排水口發出臭味,應立即維修。
  15. As the underground drainage facilities are ageing gradually, whether the government has plans to replace or renovate the drains to prevent accidents caused by pipe leakage or burst, which endanger the safety of the public ; and

    鑒于本港地下排水道設施日漸老化,政府有沒有計劃更換或翻新該等道,以預防因或爆裂而造成意外,危害市民安全及
  16. To avoid the pollution of groundwater resource and adjacent environment caused by drainage pipe leakage, current criterion in our country stipulates that there must be a pressurization test before drainage pipes are used

    為防止污水而導致污水外污染地下水資源和周邊的環境,我國現行的規范規定,無壓道在竣工交付使用之前必須進行道的嚴密性試驗。
  17. Heater adopts high quality stainless steel, alloy heating wire, electrical melting mgo powder etc. to make the heating elements after passing advanced technology such as coiling wire, shrinking tube, removing humidity and sealing etc. the connection between flange and heating tube adopts hydrogen arc welding and vacuum lead welding to guarantee the heater without leakage under high voltage

    加熱器採用優質不銹鋼合金加熱絲電熔氧化鎂粉等材料,經繞絲縮排潮封口等先進的生產工藝製造而成的發熱元件法蘭與電熱的聯接採用氬弧焊及真空釬焊,保證了加熱器在高壓下的不
  18. The system differentiates between background losses at joints and fittings and larger scale bursts, and enables operators to quickly localize leaks, deploy maintenance teams, track maintenance status, and access essential zone criteria and data by remote

    該系統可以區分在道連接處的和更大規模的爆裂之間的損失,使得操作員迅速定位地點,組成維修隊,跟蹤維修情況,以及遠程訪問基本的地域標準和數據。
  19. The solution is based on abb ' s award - winning system 800xa automation platform and includes the wlms and power generation information management ( pgim ) software, the expansion of an existing abb scada system with 800xa and ac800m controllers, magmaster electromagnetic flow meters, and ctu800 - cpe remote terminal units

    該系統可以區分在道連接處的和更大規模的爆裂之間的損失,使得操作員迅速定位地點,組成維修隊,跟蹤維修情況,以及遠程訪問基本的地域標準和數據。
  20. Characteristic great intensity and cluctibility, strong corrosion resistence, nondeformation, leacking proof, ageing resistence use : clothing of cables, water pipe ect. technology norms shape and coustructre : screwed beutable insulated tube

    特點用途:該產品高強度高韌性耐腐蝕不變形防抗老化,廣泛用於光電纜的外套保護城市建設自來水等。
分享友人