滿負載 的英文怎麼說

中文拼音 [mǎnzǎi]
滿負載 英文
[電工] full load
  • 滿 : Ⅰ形容詞1 (全部充實; 達到容量的極點) full; filled; packed 2 (滿足) satisfied; contented; conte...
  • : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 負載 : [電學] load
  1. It looks upon water resistant as load, simulate every instance of locomotive running and check its every parameter automatically, then collect and dispose these data of parameters, calculate the power of simulating running of locomotive, which is based on the current, and voltage of host dynamotor. afterward, it can be judged from the working state of locomotive. through experiment and adjust each parameter, it can provide important warrant to the components of locomotive whether they can work normally and credibly

    即以水阻作為,模擬機車運行,對機車的主發電動機的電流、電壓和柴油機的轉速等參數進行檢測,並對檢測結果進行處理,計算出模擬機車運行時的功率,並以此為依據,對機車的工作狀念進行判斷,通過水阻試驗,調整有關參數,使機車運行時能發揮所要求的功率和滿足規定的工作特性。
  2. Use life : over 20000 times in full load

    使用壽命:滿負載時大於2萬次。
  3. In the positioning servo - system, which generally is configured by the d. c. pulse width modulator ( pwm ) velocity governing system and position servo - loop, the parameter perturbance of pwm velocity loop really exist by reason of such as the load behavior ; power voltage supply ; operating setting value, etc. 1, 2 , and it cannot be ignored. by using the identification technique to form the mathematical model of the system, authors have confirmed the facts. therefore, to design the discrete sliding mode controller ( dsmc ) of the positioning servo - system, the perturbed parameters value bounds of the pwm velocity loop, which is as the controlled plant of position servo - loop, should be accounted. consequently, the design principle of dsmc for accounting system with parameter perturbance is proposed by the authors. the proposed method can ensure the stability of system with parameter perturbance and the behavior of non - overshoot, fast precise positioning. in order to reveal the effects of the design method, the comparative research work is done by the authors. also, it has been tested in an industrial experiment, the results proved it is satisfactory

    由直流脈寬調速系統( pwm )和位置環構成的定位系統中,速度環的參數隨特性;電網電壓;給定工況而攝動是不容忽視的.作者通過系統辨識建模也證實了這一事實1 , 2 .因此在設計位置環的離散滑模控制時,必須針對速度環(即位置環的控制對象)的參數攝動范圍採用「對象參數攝動離散滑模控制器的設計方法」 ,以確保系統在參數攝動時的穩定性和快速、無超調、準確定位的優良動態品質.為剖析該設計方法的控制效果,本文作了對比性研究,並將該設計方法用於工業試驗中,取得了滿意的結果
  4. Based on the study of transferring characteristics of the lcc - type resonant voltage, the parameter combinations, which make widths and magnitudes of voltage pulses of resonant network adjustable, arededucedo when the following requirements are met : fn > 3, k > 3 or cp / cs > 8, the above circuit is of natural voltage - stabilized characteristics, thus open - loop control method for bucking voltage is presented and the experimental results verify that the method is feasible.,

    實測整機在額定時效率達到88以上。在研究lcc諧振網路電壓傳輸特性的基礎上,推導出滿足可變寬度和幅度的諧振網路輸出電壓脈沖列的參數組合。設計f n 3 、 k 3或c _ p / c _ s 8時,諧振網路具有自然穩壓特性,因此本文提出並實驗驗證了一種整機為降電壓時的開環控制策略。
  5. The synthetic circuit is also simulated about normal working, green mode working and so on ; the results of simulation meet the function requirement

    在整體電路模擬中對正常工作、輕綠色模式過程等進行了驗證與分析,模擬結果表明該集成電路滿足設計要求。
  6. The typical ground current ( quiescent current ) is 1ma at full load, 60 a with no load and, and less than 1 a in shutdown mode

    滿負載條件下,靜態電流為1ma ;在空情況下,靜態電流為60 a ;在關斷情況下,靜態電流小於1 a 。
  7. ( 4 ) the experiment of asymmetrical half bridge converter design and the result of it base of the above analysis, the dc / dc converter is designed, it is proved that asymmetrical half bridge can realize zero voltage switching when it satisfies the condition of load current and deadtime by the experiment

    ( 4 )不對稱半橋的實驗電路設計及實驗結果基於前面的分析,設計了一個不對稱半橋dc dc變換器的實驗電路,進行了實驗研究,實驗結果證實了在滿足死區和電流兩個條件時,不對稱半橋可以實現零電壓開關。
  8. A crowded car with a load near a preset value will bypass hall calls in order to maintain maximum operation efficiency

    如轎內擠滿乘客,或接近預定值,為保持最大運行效率,該轎將自動越過召喚層站。
  9. Simulated results showed that the proposed algorithm is available to construct effectively and quickly, the multicast tree satisfying delay constraint and lowest link cost, with network load balance taken into account to pick out the cheaper idle route

    模擬結果表明,該演算法在考慮網路的均衡情況下,選擇鏈路代價較低的空閑路徑,快速、有效地構建滿足時延要求,鏈路代價最小的組播樹。
  10. The exportation resistance of a device work device with what link after loading the resistance s the certain connections for should satisfying, in order to prevent mount to load the appearance produce the obvious influence. with each other connect to say to electronics equipments, for example after signal connect the enlarger, ex - class to connect class, only behind first - degree importation resistance before larger than first - degree exportation resistance 5 - 10 times are above, can think the resistance to match good ; connect the box come saying, electronics tube the machine should choose to use with for the enlarger its output to carry the mark to call the resistance the box for, but transistor enlarger then have noing this restrict, can take officing why resistance of equal or approximate box

    一件器材的輸出阻抗和所連接的阻抗之間所應滿足的某種關系,以免接上后對器材本身的工作狀態產生明顯的影響。對電子設備互連來說,例如信號源連放大器,前級連后級,只要后一級的輸入阻抗大於前一級的輸出阻抗5 - 10倍以上,就可認為阻抗匹配良好對于放大器連接音箱來說,電子管機應選用與其輸出端標稱阻抗相等或接近的音箱,而晶體管放大器則無此限制,可以接任何阻抗的音箱。
  11. In this situation, redirecting the request to a grid provider that is already working at full capacity is not going to work

    在這種情況下,將請求重定向到已經處于滿負載狀態的網格提供者是不行的。
  12. In the reform of the power grid of north mining bureau, the active power line conditioner was used for meeting with the requirement of power supply quality and the requirements of voltage changing and sensitive load in power transmission

    摘要為滿足礦務局供電電能質量的要求和電能傳輸中的電壓變化和敏感的需求,在礦務局北網電網改造中採用了有源電力調節器。
  13. It has been estimated that if the bridge were packed with cars, it would still only be carrying a third of its total capacity.

    據估計,如果橋上擠滿汽車,也仍然只有它總能力的三分之一。
  14. The master is like a great ship for beings to cross the perilous ocean of existence, an unerring captain who guides them to the dry land of liberation, a rain that extinguishes the fire of the passions, a bright sun and moon that dispel the darkness of ignorance, a firm ground that can bear the weight of both good and bad, a wish - fulfilling tree that bestows temporal happiness and ultimate bliss, a treasury of vast and deep instructions, a wish - fulfilling jewel granting all the qualities of realization, a father and a mother giving their love equally to all sentient beings, a great river of compassion, a mountain rising above worldly concerns unshaken by the winds of emotions, and a great cloud filled with rain to soothe the torments of the passiongs

    上師就像一艘眾生橫渡生死苦海的大船;一個領導眾生到達解脫之地的偉大船長;一場澆息慾望之火的大雨;有如照徹黑暗無明的日月之光;如同承善惡力量的堅實大地;一棵含藏短暫快樂無無窮喜悅的如意樹;一座埋藏廣大精深教法的寶藏;一顆讓人覺悟的如意珠寶;一位平等付出愛給所有有情眾生的父母親;一條慈悲的大河;一座超越世俗,不被無明之風搖撼的高山;一片充滿雨水可以舒緩眾生痛苦的雲層。
  15. Heavy duty transit cases are equipped with increased wall thickness and extremely durable hardware to effectively meet the rigorous demands of modern transport

    的運輸箱配有增加的箱壁厚度以及極其耐用的硬體,以有效滿足現代運輸的嚴格要求。
  16. This article first analyzes a paradoxical phenomenon that is predominant in campus lan settings where there is a large amount of idle cpu cycles available while at the same time the computing needs from many researchers ca n ' t be met. it proposes an idea of setting up a campus computing grid with a detailed plan for its implementation, discusses the challenges of upscaling a campus computing grid into an internet computing grid and suggests possible solutions. gram ( grid resource allocation manager ) of globus toolkit 3. 2 and relative technology on it is studied, and the solutions to extend gram to support task rescheduling and the cooperation type task are proposed. the design and implement of the gram client based on web that is the kernel part of the task anagement module are discussed, and the design of resource discovery module and task transfer module are gived

    本文首先分析了校園網環境中存在大量計算資源閑置與科研人員科學計算需要得不到滿足之間的矛盾,給出了建立校園計算網格的構想及具體的設計方案,並提出了校園計算網格推廣到internet計算網格存在的問題及解決方案;研究了globustoolkit3 . 2中的資源分配管理器gram及其相關技術,並給出了擴展gram對任務再調度和協作型任務支持的解決方案;設計實現了校園計算網格中任務管理模塊的核心部分基於web的gram客戶端,並介紹了資源發現與任務遷移模塊的設計;然後在分析min - min調度演算法基礎上,借鑒qosguidedmin - min演算法的思想,並利用主機資源分類的思想,給出了在平衡和時間跨度都有較大改善的balance - qosguidedmin - min演算法模型的思想與實現;最後設計實現了調度演算法驗證模塊,並在此模塊上對比了改進的演算法balance - qosguidedmin - min與min - min演算法的調度性能。
  17. He was happy that the problems of imola and nurburgring had been identified and cured, but jacques villeneuve was stymied by the need to start from the back of the grid after his pre - race engine change, and a full fuel load scarcely helped him to take advantage of another fresh engine that had been installed ( without further penalty ) prior to the race

    伊莫拉和紐博格林的問題被確診和解決讓他十分高興,但是雅克維綸紐夫由於賽前更換了引擎要從發車區的最後一排出發,滿滿的油量根本就讓他發揮不出比賽開始前重新裝上另外一部新引擎(而沒有受到進一步處罰)的優勢。
  18. The inverted pwm changing electric current the technique is applied in the prototype model. the prototype model was tested and operated on spot, power factor could reach beyond 0. 95, the effect of following modulating voltage was better, the curve of factor of modulated voltage of exchanging systems changed following load rate was linear, the output of wave form was a flat and steady sinusoidal wave

    樣機採用了逆變式pwm變流技術,對其進行了現場測試與試運行,測試結果是電網側的功率因數可達0 . 95以上,跟蹤調壓效果良好,變流系統輸出調壓系數( k )隨率( p )的變化曲線基本滿足直線關系,輸出波形呈平滑穩定的正弦波。
  19. Allow enough excess wire inside the enclosure to make up connections to the appropriate line, load and control terminal block points

    在外殼內要保留足夠的電纜長度,使其能夠滿足連接到和控制接頭的所需適當長度的要求。
  20. The aimd has got a widely apply for its briefness and ease. at the other hand, it contain limited information because it has only two status : overload or under load. it cannot represent the true demand of the receiver and at the same time the policies of window adjust destroy the demand of smoothness of load, so it cannot afford the request of real - time streaming media

    Aimd從演算法的簡單性和實際網路容易實現的角度考慮,反饋給發送方的信息有限,只有過或欠兩種二進制狀態; aimd演算法根據瓶頸資源的擁塞狀態向所有用戶發送相同的反饋信號,並不能真實反映接收節點對發送方量的要求;同時, aimd的窗口調整策略破壞了平滑性的要求,不能滿足當前實時流媒體應用, aimd的這些不足,體現了一種性能和系統復雜度之間的折衷。
分享友人