漿倉 的英文怎麼說

中文拼音 [jiāngcāng]
漿倉 英文
pulbin
  • 漿 : 漿同「糨」
  • : 名詞1. (倉房; 倉庫) storehouse; warehouse 2. (姓氏) a surname
  1. Application of back grouting water sealing technology for wall of coal bunker

    壁注漿堵水技術應用
  2. On the base of the analysis on the advanced technology of hard ferrite in foreign country, the main procedures of preparing hard ferrite pre - sintering material are determined as follows : first, the ferrite oxides coming from the main cold rolling line and strontium carbonate are conveyed to storage tank by gas power and weighed automatically according to the demands of constituent composition. and then they are mixed and grinded by using method of wet treatment. finally the mixtures is transported to the devices of storage by transporting pump

    在分析國外先進的永磁鐵氧體生產工藝的基礎上,確定了生產高檔永磁鐵氧體預燒料的主要過程:首先,利用攀鋼冷軋鐵紅為主要原料,將氧化鐵紅及碳酸鍶採用氣力輸送至貯料料,經自動稱量裝置,按工藝配方稱量後分別由氧化鐵紅及碳酸鍶發送罐氣力輸送進入預混攪拌筒加水攪拌,然後再送入混磨機濕法混磨;最後,混合物經輸送泵輸送至料漿存儲裝置,經定量進料泵定量輸送至回轉窯進行濕法預燒,預燒料經緩冷至室溫后,再球磨。
  3. Water storage bottom grouting strengthening technique

    底板注漿加固技術
  4. Technology of grouting to block against water in coal storehouse of deep well

    深井煤漿堵水技術
  5. Integrated into a mechanism via network communication, the whole system combines with the periphery equipment to achieve the automatical control and management of the whole process including feeding, tranpotating and mixing from the outlet of silo to the outlet of mixer for the recipe need of dry mixed mortar ‘ s production

    整個系統以網路通訊方式聯系成一個有機整體,結合外圍的執行設備完成對從料出口開始到混合機出口的配料輸送混合的全過程的自動控制和管理,來滿足干混沙漿生產對配料要求。
  6. Liao, h. j. and hsieh, p. g. " tie - backed excavations in alluvial soils of taipei ", journal of geotechnical and geoenvironmental engineering, asce, vol. 128, no. 5, pp. 435 - 441 ( 2002 ) ( sci )

    亮三、廖洪鈞、和林英堂, ? ? [性灌漿材料和其灌漿砂土之動態行為,地工技術雜志,第93期,第5 - 12頁( 2002 ) 。
  7. Liao, h. j. and hsieh, p. g. “ tie - backed excavations in alluvial soils of taipei ”, journal of geotechnical and geoenvironmental engineering, asce, vol. 128, no. 5, pp. 435 ? 441 ( 2002 ) ( sci )

    亮三、廖洪鈞、和林英堂, ?久性灌漿材料和其灌漿砂土之動態行為,地工技術雜志,第93期,第5 ? 12頁( 2002 ) 。
  8. Two main fronts sliding down the mountain appeared to have slowed, but the resort ' s kiosks were still menaced by magma that has consumed a warehouse, car park and ski - lifts, cut a highway in two and showered ash on to catania ' s international airport

    不過觀光景點的亭閣仍未擺脫被巖漿吞噬的危險。巖漿已經吞沒了一個庫一個停車場和一些運送滑雪者上山的纜索吊椅,切斷了一條公路,卡塔尼亞國際機場內也彌漫著大量的火山灰。
分享友人