潮沙波 的英文怎麼說

中文拼音 [cháoshā]
潮沙波 英文
tidal sand wave
  • : Ⅰ名詞1 (潮汐; 潮水) tide 2 (比喻大規模的社會變動或運動發展的起伏形勢) (social) upsurge; cur...
  • : 沙動詞[方言] (搖動以清除雜物) shake
  • : Ⅰ名詞1 (波浪) wave 2 [物理學] (振動傳播的過程) wave 3 (意外變化) an unexpected turn of even...
  • 沙波 : bed ripples; sand wave; sand ridge
  1. Using the hulscher model of the formation of sand waves and sandbanks, under the ancient bathymetry, or under the modern bathymetry, the stokes number of the tidal flow and resistance parameter in the radial sandbanks satisfy the conditions for the formation of sandbanks. the research demonstrates that the dynamic flow conditions result in the development of tidal current sandbank. the radial sandbanks and it ' s asymmetrical distributions will still maintain in the future

    應用hulscher脊增長模式,通過對該海域斯托克斯數及底部阻力參數的計算首次發現,南黃海輻射脊群海域在概化古地形和現代輻射狀脊群水下地形情況下,其斯托克斯數及底部阻力參數均滿足形成脊的條件。
  2. Based on the study of sediment transport under the actions of tidal currents and wind waves, a mathematical model of suspended load and bed load for yangtze estuary is developed

    摘要通過對長江口徑流、流和浪共同作用下的泥運動規律的研究,開發並建立了長江口全(懸和底)數學模型。
  3. The seventh decade of this century went out in loud outrageous fashion as quiksilver let loose with echo beach prints which included polka dots, triangles and checkerboards

    隨著quiksilver發布echo灘圖案包括爾卡圓點三角形和西洋跳棋盤后引發的風靡一時的時尚流,本世紀七十年代宣告結束。
  4. In this paper, the numerical harbor should include following contents : 1. database of wave field, tidal current field, sediment field in researched area ; 2. database of ship styles. 3. numerical model used to analysis data. 4. plans of outer dike, utilities of sea line, and selections of waterway, which based on the above databases

    本文認為,對于港區而言,數值化的內容應包括以下幾個方面: ( l )所研究港區的浪場、流場及泥場等自然條件數據庫的建立; ( 2 )船型數據庫的建立; ( 3 )數值分析模式的建立; ( 4 )提出建立在自然條件基礎之上的外堤布置、碼頭岸線利用策略及航道的擬定方案(即優化模式的建立) ; ( 5 )按照經濟最優原理快速準確地提出碼頭裝卸的策略及當前方案。
  5. It has been proven that the differences of magnitude and distribution of tidal currents, wave energy rate, suspended sediment concentration and the stokes number result in a asymmetrical distribution of sandbanks between the north and south. the sandbank surface area and length in the north are lager than those in the south, but its cross section area is less than that in the north

    各種動力特徵平面分佈規律研究表明,輻射脊群南北脊不對稱分佈的格局是脊對流往復流性質的強弱分佈、能流率大小分佈、含量的平面分佈規律及斯托克斯數的大小分佈的動力響應。
  6. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流汐區域並非持續保持淤積狀態,在特定的來水來、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沉積分配的過程來看:三角洲與濱海區泥的沉積變化趨勢是基本一致的,各部位的泥沉積比例變化基本呈動狀態,且三角洲與濱海區泥的沉積比例與來量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沉淤的因素主要集中在汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沉積分配的回歸計算式,據此可以預估計算河口不同區域泥的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來量與造陸面積的相關關系,得出了當河口多年平均來量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  7. Regarding natural sand of the spot as model sand, using series model, and under the interaction of irregular wave and tidal current, a systematic test on scouring around pile of land - island approach bridge of jiangsu lng receiving station is carried out

    摘要以現場天然為試驗床質,利用系列模型,採用不規則流相結合的方式,對江蘇lng接卸站陸連島橋樁基周圍的沖刷情況,進行了系統試驗。
  8. While chopin was in austria, poland and russia faced off in the apparent beginnings of war

    蘭民族運動走向高,與俄的戰爭一觸即發的時候,肖邦身在奧地利。
  9. Further research suggests that waves stir sediments and tidal currents transport the sediments, and waves and tidal current are combined into the dominant dynamic mechanism of coastal erosion, of which tidal residual current takes and transports sediment outward, thus it causes sediment to wane in the coast

    進一步結合、流動力的對應分析認為,浪以掀為主,流以輸為主,浪和流的聯合作用是飛雁灘海岸侵蝕的主要動力機制,其中流主要通過餘流攜外輸,造成近岸泥虧損。
  10. According to dou guoren ' s similarity theory of total sediment transport modeling for estuarine and coastal regions, a generalized physical model of the north - trough of the yangtze river estuary deep channel is designed

    摘要根據竇國仁流共同作用下的全模型相似理論,設計了長江口深水航道北槽概化物理模型。
  11. In order to calculate depth - averaged two - dimensional ( 2 - d ) suspended sediment transport under waves and currents in the yangtze estuary, a numerical model system is developed. four models, a 2 - d compound fluid model including wind, waves, tides and river runoff, a swan wave model, a wave - current bottom boundary layer model and a 2 - d suspended sediment transport model are integrated

    本文建立了一個用於?流共同作用下長江口平面二維懸計算的數值模型系統,主要由四部分組成,即考慮風、浪、、徑流的二維復合流場模型、 swan海浪模型、?流相互作用的底邊界層模型以及二維懸輸運模型。
  12. Considering the effects of both tides and waves, a2 - d numerical model was used to simulate the sediment movement in lianyungang harbor, and a large scaled average sediment concentration field of hai - zhou bay was computed

    摘要以連雲港進港航道為例,應用浪、流共同作用下的二維泥數學模型,研究淤泥質海岸的泥運動及航道回淤問題。
  13. On the basis of sediment concentration field, the annual back silting intensity on the approach channel of 70000 dwt at lianyungang harbor was also simulated, and the calculated results was coincident with actual data

    鑒于進港航道回淤量是當地海域流、浪、泥長期共同作用的結果,建議採用年平均含量場進行回淤計算,並在此基礎上模擬了連雲港7萬噸級進港航道的年回淤強度,計算結果與實測資料吻合較好。
  14. According to the theories of the energy dissipation of wave - water and sediment movement and based on the bottom sediment load formula developed by dou guoren, a formula to calculate the transport of the bottom sediment, which includes the bed load and part of suspended load, under the joint action of waves, tidal currents and wind - currents is derived

    摘要根據動水流能量及泥運動原理,參考了竇國仁推導底量的方法,推導出浪、流和風吹流共同作用下的底量(包括推移質和部分懸移質輸)計算式。
  15. It has been proven that, from the propagation process of the tidal waves and wave energy rates, the whole radial sandbanks area is controlled by the progressive tidal wave in the south and the rotational standing tidal wave in the north. these two waves merge at qianggang and induce a large tidal range

    通過對面傳播過程及能流率研究表明,輻射脊群海域為南部太平洋前進和北部旋轉所控制,兩系統在?港外海輻聚輻散,形成大差區的特點。
  16. Abstract : it was introduced in the paper on the basis of the famous tide model of s21hd, the sediment calulation for the design proposal of the reservoir of dandong power plant had been given by the newly setup generalized model of overall sediment which relying upon the data of original observation, and the relative wave model test conclusions and the forecast results of sediment by the joint action of wave and current were quoted

    文摘:簡要介紹以著名的流模型s21hd為基礎,用新建的依賴于原觀資料的全沖淤概化模型,對丹東電廠蓄水庫設計方案進行的回淤計算;引述了相應的浪模型試驗結論和浪、流聯合作用淤積預報結果。
  17. River and ocean dynamics and sediment transport including mathematical model of wave and tide the problems of siltation in ports. waterways and intakes of electric plants and so on

    河流海洋動務環境及物質輸移規律,浪數值計算,港口航道及電廠水口工程泥問題,尤善於物模試驗。
  18. At present, many fields remain to further research, especially the profound combination of gis technique with ece ( estuarine and coastal engineering ), which should be developed for the purposes as follows : ( 1 ) to serve the huge comprehensive work in changeable natural conditions and difficult construction conditions which takes a long period and covers a large region, e. g. the regulation work of deepwater channel in the yre ( yangtze river estuary ) ( 2 ) to combine the gis with applied numerical model ( 3 ) to study the hydrodynamic processes and characteristics of waves, tidal currents and sediment transport, as well as the affection carried by the regulation work in an estuary ( 4 ) to monitor and to analyze ees ( evolution of erosion and sedimentation ) and the variation of riverbed ( 5 ) to play a role of dynamic supervising of a engineering project

    目前尚有許多有待進一步研究的領域,尤其是以服務于長江口深水航道治理這樣規模大、周期長、影響區域廣、自然條件復雜、施工情況多變的國家重點工程為目的,將gis與專業應用數學模型結合,對河口海岸浪、流、泥運動的動力機制,以及整治工程建築物對其影響的研究,對入海航道沖淤和河勢演變的監測分析,對施工進展和工程效果實現「動態」監控和管理,尚缺乏同gis技術的深入有效結合。
分享友人