澆池 的英文怎麼說

中文拼音 [jiāochí]
澆池 英文
pouring basin
  • : 澆名詞(姓氏) a surname
  • : 名詞1 (池塘) pool; pond 2 (旁邊高中間窪的地方) an enclosed space with raised sides 3 (舊指劇...
  1. On most automotive battery grids, cooling is required in the top gate area and in the center of the mold only.

    絕大部分汽車蓄電板柵尺需要在頂部口部分和模具的中心冷卻就可以。
  2. Technical specification for integral pouring concrete filter floor and adjustable nozzle of air - water washing filter

    氣水沖洗濾整體築濾板可調式濾頭技術規程
  3. Rcc casting & backfilling work for cw pump house is in progress. excavation forcw channel was stared on april 2

    循環水泵房正在壁混凝土和基礎回填,前于本月2日開挖,開挖工作正在進行
  4. I made reservoirs to water groves of flourishing trees

    6挖造水,用以灌嫩小的樹木。
  5. Tom has watered the vegetable garden, and so he has

    湯姆已經給菜園,他的確過水了。
  6. When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer

    用攀鋼煉鋼生產數據對模擬軟體系統進行的測試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物流的時間分佈規律基本吻合,達到了模擬軟體設計的預期目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的物料供應能力可能難以滿足全連鑄生產的要求;連鑄機的連計劃對轉爐爐次計劃的編制有很高的要求,合理安排來料、煉鋼與鑄三者間的物流平衡關系將是保證全連鑄作業的重要條件;當出現設備異常情況時,可以利用混鐵爐與lf爐站前等待作為物流緩沖,通過延長系統的平均物流時間來緩解因設備檢修和故障等擾動所造成的影響,確保生產的順利進行。
  7. Seed growth characteristics and process of maize with different genotypes at flowering stage under normal irrigation and drought stress condition were studied with pit growing experiment to modeling the hilly area of southwest china

    摘要採用栽模擬試驗,研究了西南山地不同基因型玉米品種在花期乾旱和正常水條件下的籽粒發育特性及過程。
  8. Cross - linked cast acrylic sheets for baths and shower trays for domestic purposes ; german version en 263 : 2002

    家用浴和淋浴缸用交聯鑄聚丙烯晴板材;德文版本
  9. Now the main method of preparing gplb is to fabricate a gpe film through solution casting first, and then assemble the battery

    而且目前gpe主要是通過溶液鑄的方法,首先制備成凝膠聚合物電解質膜,然後再組裝成電
分享友人