澆包襯 的英文怎麼說

中文拼音 [jiāobāochèn]
澆包襯 英文
ladle liner
  • : 澆名詞(姓氏) a surname
  • : Ⅰ動詞1 (在裏面托上一層) line; place sth underneath 2 (陪襯; 襯托) set off Ⅱ名詞(襯在裏面的附...
  1. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  2. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  3. Such measures as raising baking temperature of ladle, quickening thermal circulation of ladle, adding insulating lay in ladle lining, adding cover in molten steel surface, adding ladle cover in casting are introduced to reduce molten steel temperature drop in this paper

    闡明了通過提高鋼烘烤溫度、加快鋼熱周轉、加隔熱層、鋼水表面加覆蓋劑、注鋼加蓋等減少鋼水溫降的措施。
  4. The spraying mixes developed by our company for con - casting tudish working lining has good propertles of coating and long service life. it keeps working for one cast without eating away and leaking for average over 12 hours during the whole casting. when inversion casting the residual working lining can be easily disintegrated without sticking to the ladle and no powder coming from the disintegration, and also the working environment not polluted. meanwhile magnesia - calcium spraying mix has the functions of absorbing impurities in molten steel and pruifying molten steel

    我公司開發的連鑄中間工作內噴塗(塗抹)料施工時塗抹性好,使用壽命長,在整個連過程中能持續工作一個次而不蝕漏平均12小時以上,用后在翻時殘余工作能順利解體,不沾、解體產物不粉化,不污染工作環境,鎂鈣質噴塗料還具有吸附鋼水雜質,凈化鋼水的作用。
分享友人