澆築層高度 的英文怎麼說

中文拼音 [jiāocénggāo]
澆築層高度 英文
placement lift
  • : 澆名詞(姓氏) a surname
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 高度 : altitudeheightelevation
  1. Based on several actual cases, the temperature control measures for roller compacted concrete ( rcc ) gravity dam and arch dam such as structural jointing for construction ; lowering of concrete placing temperature ; water pipe cooling ; surface insulation ; inclined - layer placing etc., the measures to improve the material properties i. e. the application of micro - expanding concrete ; enhancement of material crack - resistance property and the requirement for the simulative analysis on both the temperature field and stress field as well as some problems concerned are summarized herein on the basis of the analysis on the material properties ; construction characteristics and the changing characteristics of the thermal stress of roller compacted concrete

    摘要從碾壓混凝土的材料特性、施工特點、溫場溫應力的變化特點入手,結合幾個工程總結了碾壓混凝土重力壩、拱壩的分縫方式,降低、水管冷卻、表面保溫、施斜碾壓等溫控措施,採用微膨脹混凝土、提材料抗裂性能等改善材料性能措施及碾壓混凝土溫場、應力場模擬分析的要求和應注意的問題。
  2. Concrete structure of prestressed composite slab surmounts shortcoming of the traditional slab, has the merits of cast - in - site structure and assemble structure, such as larger integer rigidity, preferable anti - seismic property, lower material consumption and cost, shorter construction period, and simple construction technology. the structure can be applied to high - rise and popularized in engineering construction

    混凝土疊合樓蓋結構克服了傳統樓蓋的不足,兼有現和裝配式結構之特點,具有整體剛大、抗震性能好、節省材料、降低造價、縮短工期、施工方便等優點,能在多、中使用,可在工程建設中廣泛投入應用。
  3. The next this text is based on the appearance theories, according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency, suppose the level shears are line with the displacement, adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model, from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint, and analysis the crack rule and the influence factor of mass concrete temperature contract, and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length, at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience, bringing five technique measures to prevent the temperature crack of mass concrete

    其次本文以唯象理論為基礎,根據超厚底板大體積混凝土承受的溫差主要是均勻溫差和均勻收縮的特點,闡述了大體積混凝土溫應力理論計算的簡化方法和最大整的計算方法,同時根據大體積混凝土溫收縮應力基本公式和大體積混凝土結構施工經驗,提出了防止大體積混凝土溫裂縫的五項技術措施。最後本文以廈門郵電大廈3 . 5m超厚底板施工為實例,從大體積混凝土溫應力計算、混凝土保溫材料厚計算、混凝土配合比的確定,鋼筋工程、模板工程、混凝土的泵送和以及大體積混凝土內部溫的監測和後期養護等方面進行了理論應用。
  4. Meanwhile, the key research topics are focused on how to reduce the differential settlement between the main tall building and the anex on soft ground, where to set the post - cast strip, and what cause the smart change of the internal force of plate under the core canister of tall building. an experiential equation for estimating the maximum moment of plate is advanced. a method for calculating the range and the thickness of the local enganced plate and another experiential equatio n for estimating the increment of maximum moment of the local plate are also suggested

    同時著重就軟弱地基中減小主裙房之間沉降差異的措施、施工后帶的設置位置,以及核心簡體下筏板內力變化劇烈等問題展開了分析,提出了筏板最大彎矩估算值的經驗公式,獲得了簡體下局部筏板加厚處加厚范圍及加厚厚的取值方法及加厚處最大彎距增幅估算值的經驗公式,為今後設計同一類型提供一些借鑒。
  5. 1 summarization at present, super - length tall buildings are ever - increasing by popular. expansion and contraction joint is not supposed to be located or at least frequently located in average buildings for the requirements of their functions. the longest space between two expansion and contraction joint, which is set in code for structural design is frequently exceeded in cast - in - place frame structure

    目前超長日見增多,由於功能以及使用上的需要,要求不設或少設伸縮縫,結構設計規范對現框架結構不設伸縮縫的最大間距的規定常常被突破,這就需要考慮溫對結構的影響。
分享友人