濱海沙洲 的英文怎麼說

中文拼音 [bīnhǎishāzhōu]
濱海沙洲 英文
beach barrier
  • : Ⅰ名詞(水邊; 近水處) bank [brink] of river; beach; shore:海濱seashore; 湖濱lakeshore; lakeside; ...
  • : 沙動詞[方言] (搖動以清除雜物) shake
  • : 名詞1. (大陸和附近島嶼的總稱) continent 2. (河流中由沙石、泥土淤積而成的陸地) islet in a river; sandbar
  • 濱海 : border on the sea; by the sea; coast濱海沉積 coast deposit; 濱海帶 [地] littoral zone; 濱海地 oce...
  • 沙洲 : [地質學] sandbank; herst; agger arenal; hurst; shoal; sandbar; kay; cay; key; char; diara
  1. This complex is located near the intersection of northeast-trending littoral marine bars and a southeast-trending delta system.

    該復合體位於北東走向的壩與南東走向的三角體系交匯處附近。
  2. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來、邊界條件和洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沉積分配的過程來看:三角區泥的沉積變化趨勢是基本一致的,各部位的泥沉積比例變化基本呈波動狀態,且三角區泥的沉積比例與來量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沉積分配的回歸計算式,據此可以預估計算河口不同區域泥的沉淤量; 、 5 )本項研究首次論證了河口三角岸線動態平衡的概念,並建立了黃河河口來量與造陸面積的相關關系,得出了當河口多年平均來量維持在3 . 45億t時其河口三角岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  3. Depending on prevailing conditions, these bars may move up the upper part of the shoreline and beach.

    由於基本條件的變化,這些可以向上移動到線或灘上部。
  4. The low and flat coastal plain, the vulnerable muddy coast and the radiate sand ridges without external sediment supply in jiangsu province are extraordinarily sensitive to coastal dynamical changes. faced with the possible sea - level rise in the future, inevitably, the region will be exposed to serious impacts comparatively

    江蘇中部低平的平原、脆弱的淤泥質岸和缺少外來泥供給的輻射岸動力變化異常敏感,面對未來可能的面上升,該區域必將受到較為嚴重的影響。
  5. A nativity scene made from sand in the northern italian seaside town of rimini for christmas is believed locally to be the biggest sand sculpture in europe

    這幕為聖誕節而創作的雕基督誕生場景位於義大利北部城市裡米尼,當地人堅信它是整個歐最大的砂雕作品。
  6. The promenade between the intercontinental hotel and the international mail centre will be closed to the public due to the dangers posed by construction work

    由於工程關系,介乎際酒店至國際郵遞中心的一段花園將會列為禁區,因此,尖咀東部不宜觀賞煙花。
  7. From the tai mei tuk peninsula, a 1. 25 - mile long dam was to be built across the strait, to connect it with the small island of pak sha tou. this would change the shoreline and create a man - made lake measuring 3. 5 miles long, 1 mile wide and 2, 950 acres in surface area. the seawater would be pumped out before it could be used to store fresh water

    25哩的水壩,橫越峽,連接大埔岸對開半島白,改變原來的岸線,使之成為一個長3哩半、闊1哩、面積達2 , 950英畝的之湖,再將湖內水抽乾,儲存淡水。
分享友人