瀝青面路 的英文怎麼說

中文拼音 [qīngmiàn]
瀝青面路 英文
asphalt pavement
  • : Ⅰ動 (液體滴落) drop; drip; trickle Ⅱ名詞(液體的點滴) drop; drip; trickle
  • : Ⅰ形容詞1 (藍色或綠色) blue or green 2 (黑色) black : 青布 black cloth; 青牛 black ox3 (年輕...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 1 (道路) road; way; path 2 (路程) journey; distance 3 (途徑; 門路) way; means 4 (條理) se...
  • 瀝青 : pitch; asphalt; bitumen; mineral resin; dacholeum; goudron; chian; pez; peucine; pitchblende
  1. Through the experimental research, we think : the technological capacity of fiberglass asphalt macadam if weaker than asphalt macadam, however, if use elasticized capacity to solve blending technological problem. adjust the breed of fiber silk, extend its diameter, its paving capacity is still worth exploring, asphalt - rubber macadam structure lager have good deformed - become capacity and crazed - resistance capacity, small gap rate. good water - resistance capacity, good hot - stability and simple construction technology. therefore. pitch rubber spall is a good cover material which is suitable for the second class or lower whose asphalt pavement has split open because of fatigue. and is the good structural measure of preventing half - rigidity grass - roots unit shrink - rift reflecting. pave a thin layer of pitch rubber spall between asphalt - type pavement layer and half - rigidity basic level, although the cost of building is higher than paving togongbu in the middle, the construction technology, crazing - resistance and water - resistance are better than togongbu, not only could reduce greatly the reflex of half - rigidity grass - roots unit material, long then the use lifespan of pavement, but also it is possible to reduce suitably the thickness of asphalt mixture layer, though the cast of building in the early days becomes more, in the long - term opinion, it have fully important technological and economical significance

    通過試驗研究認為:玻璃纖維碎石的技術性能不如碎石好,但用彈性性能較好,如能解決拌和工藝問題,調整纖維絲的品種,增大其直徑,其用性能仍值得探討,橡膠碎石結構層具有變形性能和抗裂性能良好,空隙率小,防水性能好,熱穩定性較好,施工工藝簡單的特點,因此,橡膠碎石是二級及二級以下公因疲勞而開裂的的良好罩材料,也是防止半剛性基層收縮裂縫反射的良好結構措施,在層和半剛性基層之間夾鋪橡膠碎石薄層,雖然造價比夾鋪土工布高,但其施工工藝,抗裂性能和防水性能均優于土工布,不僅可以大大減少半剛性基層材料的反射裂縫,延長使用壽命,而且可能適當減薄混合料層的厚度,雖然初期造價有所增加,從長遠來看,具有十分重要的技術和經濟意義。
  2. Asphalt block pavement

  3. By a great number of tests indoors, the theoretic analysis of microstructure and fracture mechanics, tests on the test - road, after the analysis of road - related performances of cement - bound crushed stones base and the study for improvement, the conclusion is put forward, that applying the cement fa - bound crushed stones base can obviously minish the maximal stress of asphalt pavement, lighten and stay cracks in the asphalt pavement effectively and economically so as to improve long - term performances of the structure of pavement

    通過大量室內試驗、微觀結構和斷裂力學理論分析,鋪築試驗段現場檢測,分析水泥穩定級配碎石基層的用結構性能,並研究其用性能的改善措施,得出水泥粉煤灰穩定級配碎石基層可明顯減小層的最大應力,經濟有效的減輕和延緩開裂,改善結構長期使用性能。
  4. Pavement cold - in place recycling is a new technique of form pavement structure, it include three steps : the fist step is the processing of old asphalt pavement material including asphalt pavement and parts of road base material, then add some new bone - material or thin material to these material according to the characteristic of cold recycling structure, at the same time add some water and in addition matter according the quantity of material, at last deal with these material in environment condition to form an new structure

    冷再生技術就是將舊材料(包括層和部分基層材料) ,經過杴刨加工進行重復利用,並根據再生后結構層的結構特徵,適當加入部分新骨料或細集料,按比例加入一定量的外加劑和適量的水,在自然環境下連續完成材料的一系列加工工藝,重新形成結構層的一種工藝方法。
  5. By structural analysis and calculation for original highway structure without permeable layer, the critical modulus of base have been obtained which makes asphalt pavement fill different allowable stress criterion. by structural analysis and calculation for different highway structure with permeable layer, critical modulus of permeable base course are obtained to make asphalt pavement fill different allowable stress criterion. the paper also presents the tendency of structure response of different highway structure with drainable layers mainly depends on the thickness of asphalt pavement, the thickness and the critical modulus of permeable base

    對于不設排水層的原結構,通過結構計算得出對應于不同的層容許應力值時所需的基層臨界模量值;對于加設排水層的結構,通過結構計算得出對應于不同的層容許應力值時所需的排水基層臨界模量值;加設排水層的結構的結構反應的變化趨勢主要取決于層厚度、排水基層厚度和排水基層臨界模量值。
  6. Third, mensurated the front axle ' s load - time history when truck was running on general tar - paved roads, mountainous roads and the proving ground enhancement roads, second sampled and pretreated to the load - time history with rpc software of mts corporation, acquired the relationship of the frequence of the mean and amplitude load, obtained the zero mean equivalent loads using goodman experiential fatigue equation, acquired the weibull distributing functions of equivalent loads of respective roads

    第三,測定了汽車前橋在一般、山區公和試驗場強化試驗的載荷時間歷程。對載荷時間歷程進行了二次采樣和數據預處理。採用雨流計數法得到了各的載荷均、幅值的頻次關系,並根據goodman經驗疲勞公式,得到了零均值的等效載荷及相應的頻次。
  7. Fourth, according to the weibull distributing functions of equivalent loads, calculated the max loads by expanded sample method, acquired eight routine loads spectrum of each roads taking advantages of the connover classification method, calculated the respective enhancement coefficient in principle of amended miner linear accumulated fatigue damage rule, by the comparative norm of general tar - paved road, educed the mathematical model of calculating enhancement coefficient of synthesized roads

    利用數理統計的方法得到了各的等效載荷的weibull分佈函數。第四,根據各的等效載荷的weibull分佈函數採用擴展樣本法求得了各的極值載荷,按照connover的分級法得到了各的八級程序載荷譜。以一般為比較基準,採用修正的miner線性累積損傷理論,根據前橋的s - n和p - s - n關系式得到了各的強化系數,建立了綜合的強化系數計算的數學模型。
  8. Fatigue cracking is a main form of structural damage of asphalt pavements ( chiefly including asphalt pavement with half rigid base course and ac overlay on portland cement concrete pavement )

    疲勞開裂是(主要為半剛性基層與水泥混凝土混凝土加鋪層結構)的主要破壞形式。
  9. Based on the studies, it is proved that lime fly - ash mixture is provided with more time to compact during construction compared with other base materials in forming even higher structure strength but not in reducing strength within 1 ~ 3 days period of time. meanwhile, structure strength of the mixture which has been destroyed by some reasons can be recovered in a great extent if original structure is regained. on the other hand, during the high temperature summer season or under other conditions promoting the mixture to form strength, continuous construction process between lime fly - ash base course and bituminous pavement can be carried out to complete the building process in short time

    確認二灰基層材料與其它類型的基層材料相比,在施工時具有較長的施工碾壓成型時間,在一定時間里延遲成型的二灰基層強度不僅不降低,反而還有一定程度的提高;與此同時早期受到破壞的二灰材料在恢復整體性的條件下,結構強度能夠在很大程度上得到再恢復;另一方,在夏季高溫季節以及在強化基層強度形成的前提下,二灰類基層和層可以採用連續施工的方式在較短的時間里完成鋪築工作。
  10. In this paper, the theory and method of fatigue damage mechanics are adopted to study the fatigue damage behavior of asphalt mixture and the fatigue failure of asphalt pavement and predict the fatigue life of ac overlay on existed pcc pavement

    本文應用疲勞損傷力學理論與方法對混合料的疲勞損傷特性、疲勞破壞以及舊水泥混凝土混凝土疲勞壽命預測進行了系統的研究。
  11. Applying the theory and method of fatigue damage mechanics to the research on the fatigue cracking of asphalt pavement is conducive to reveal the mechanisms of asphalt pavement fatigue cracking and measures anti - cracking ( such as reinforcing ) and then the design method of anti - cracking can be put forward

    應用疲勞損傷力學理論與方法研究疲勞破壞,有助於揭示疲勞破壞機制和各類抗裂措施(如加筋)的抗裂機理,在此基礎上提出相應的抗裂設計方法。
  12. Asphalt and concrete pavement evenness control of high grade highways

    高等級公平整度的控制
  13. Based on main factors influencing degree of level for bitumen road surface under construction, the paper puts forward measures to improve degree of level of bitumen road surface for urban road construction including how to practice seal construction, how to choose suitable machinery and technology and how to handle cross wide contact seam

    摘要根據影響層施工平整度的主要因素,從實行封閉式施工、選擇先進適用的攤鋪機械和攤鋪工藝以及橫向接縫的處理3個方,提出提高城市道層平整度的措施。
  14. Structure design of overlaying composite asphalt pavement on old cement concrete pavement of expressway

    高速公舊水泥混凝土加鋪層結構組合設計
  15. Study of bituminous overlay on old cement concrete pavement

    舊水泥混凝土加鋪層的研究
  16. Study on technology of laying asphalt surface course on cement concrete pavement

    水泥混凝土加鋪層技術研究
  17. In order to analyze the base stress of such a new type pavement whichasphalt surface goes upon lean concrete base, calculating the load stress without asphalt surface through fem firstly, and then analyzing the effecting of asphalt surface ' s thickness based upon elasticity theory, and finally the formula of calculating load stress of lean concrete base with asphalt surface worked out according to the previous data

    摘要為分析貧混凝土基層新型結構的基層應力情況,通過有限元分析方法計算貧混凝土基層的荷載應力,並利用彈性層狀體系理論分析層厚度對其影響,由此推導出基層荷載應力的計算公式。
  18. The causation of main defects is analyzed from the view of design and improvements are suggested from the structural design, such as the test and determination of basic data of pavement design, rational selection of raw materials, adopting appropriate aggregate sizes, improving blend design method, rational selecting the thickness of asphalt layer and reinforcing the binding between the asphalt pavement layer and the base layer to further improve the operational function of the asphalt pavement and reduce the occurrence of traffic accidents

    通過對高速公的主要病害成因從設計角度進行分析,提出應從完善設計基礎數據的測試與確定方法、合理選擇原材料、採用合適的礦料級配、完善配合比設計方法、合理選擇層厚度、加強層層間及與基層的粘結等途徑完善結構設計,以進一步提高的使用功能,減少道交通安全事故的發生。
  19. Reason analysis on water - destroy on asphalt pavement of expressway

    高速公層水破壞初探
  20. Specification - dense tar surfacing for roads and other paved areas

    及其他鋪砌區用稠焦油層規范
分享友人