灌漿層 的英文怎麼說

中文拼音 [guànjiāngcéng]
灌漿層 英文
grout blanket
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • 漿 : 漿同「糨」
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • 灌漿 : 1 (澆灌灰漿) [建築] grout; grout in; grouting; grouting up; [采礦工程] injection2 [植物學] (穀...
  1. The grout is installed after final adjustment and installation of the roadway wearing surface.

    漿是在最終調整和安裝橋面磨耗以後進行的。
  2. Application of sawdust - cement mortar to the grouting through solum

    木屑水泥漿在土漿中的應用
  3. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    材料特性與理論指導下的漿工藝的全面結合是化處理,特別是特殊條件下漿效果的必要保證, cw系改性環氧化漿材及技術對多種復雜工況工程處理對象成功處理,解決了三峽混凝土微細滲水裂縫防滲補強、三峽工程地質斷泥化夾加固以及江埡電站壩基溶蝕帶防滲等一系列工程技術難題,印證了該材料及技術的先進性。
  4. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及壩腳挖除沖積至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  5. In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks

    左岸拱肩槽邊坡在開挖施工至斷f5附近時,要使用混凝土栓塞、固結漿、錨索加固及排水等措施以防止巖體失穩。右岸拱肩槽邊坡開挖過程中要採取系統錨固及排水防滲等措施,以防止個別潛在不穩定的邊坡失穩。
  6. It is suggested that the pressure should be controlled in a certain limits to avoid unduly fracture to the soil

    為避免過分壓裂土,在壓漿過程中應控制漿壓力。
  7. Since its establishment, the team has accomplished about 500 projects of lithologic reconnaissance, for example the high building of the second station of hainan military command, and many complicated projects of dam grouting and leakproof in hainan province and other countries

    建隊以來,完成了海南軍區二所等18幢高建築等巖土工程勘察項目500餘宗,參加過省內、國外(我國援建工程)的水壩漿補漏的維護修復工程多宗。
  8. By drilling to weak position, the jet - grouting technique breaks through and mixes with soil and stone of dam foundation to form diaphragm - wall

    高壓噴射漿可由鉆機鉆孔至需處理的薄弱部位,通過高壓射流的沖擊攪拌,水泥漿在噴射范圍內與地土石顆粒摻混攪合后形成防滲墻。
  9. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥巖中鉆孔樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖孔注嵌巖樁在昔格達泥巖中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對嵌巖樁承載力的計算公式的基礎上,探討了在昔格達泥巖中的沖孔注嵌巖樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達巖中的應用效果,提出了相應的參數選取,從而為壓力漿技術的工程應用和進一步研究提供經驗,並為今後在該地中合理選用樁型以及指導施工提供了依據。
  10. Effect on carrying capacity of pre - stressed soil anchor about grouting technique

    漿工藝對土預應力錨桿承載力的影響
  11. Once the grouting technique being applied, diameter and length of pile can be decreased. pile ' s tip can be directly laid in gravel and construction work can be cut down, which means lower construction difficulties and less expenditure

    採用樁端壓力漿技術,可以減小樁徑、縮短樁長,將樁端位於卵石或減少卵石中工作量,從而降低施工難度,減少工程投入。
  12. On the basis of in - site test of piles in two great bridges in one expressway project, this paper investigates the application of this technique applying to cast - in - situ pile in gravel, studies the bearing properties of grouted piles, examines the practicality of high - strain test use in grouted piles and analyses the grouted piles with vesic theory

    根據現場樁基動、靜載試驗,對卵石中樁端壓力漿樁的承載特性進行了分析;探討了基樁高應變case法在漿樁中的適用性;並應用vesic球形空穴擴張理論對漿結果進行了分析。
  13. Applied to cast - in - situ pile, the technology of pressure grouting under pile ' s tip can increase pile ' s bearing capacity largely and the utilization ratio of material, and decrease its settlement. furthermore, this technique is better adaptable to various soil stratum and can make magnificent economic efficiency with simple facilities and construction method

    樁端壓力漿技術用於注樁,能大幅度提高承載力,減小沉降,提高材料的利用率,並且設備簡單,施工工藝不復雜,經濟效益顯著,對各種地有較好適應性。
  14. According to the geological conditions of baise project, erosive bands and joint fissures, f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation. 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions. by overloading the upstream water level and reducing rock strength parameter, the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined, and finally the safety factor is determined

    2 、根據百色的地形地質條件,充分模擬了蝕變帶、節理裂隙、 f6斷漿帷幕等,較為真實地建立了壩體與地基相互作用的整體三維數值模型;採用有限元法對壩體及壩基在不同工況下的應力應變狀態開展分析,評價各工況下壩基的運行狀態;而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過程,從而得到壩基在超載和強度下降過程中的破壞模式和破壞發展路徑,最終確定壩基超載安全系數和綜合安全系數。
  15. Application of dth drilling with simultaneous casing in high pressure spiral jet grouting technology in pebble formation

    潛孔錘跟管鉆進技術在卵石高壓旋噴漿工藝中的應用
  16. Multifunctional grouting and gel infusion system for preventing and extinguishing coal seam spontaneous combustion and its application

    自燃多功能漿注膠防滅火系統及其應用
  17. Monolithic cesiumic potassiumflameproof glass has the most striking feature of weather - resistance compared to traditional grouted or sandwich glass

    單片防火玻璃與傳統的漿或夾玻璃相比,最大的特點就是耐侯性。
  18. Preparation of grouting materials by mixing epoxy resin with other components

    復配型環氧樹脂地漿材料的研製
  19. Application of compound foundation of post - grouting piles in high - rise buildings

    漿樁復合地基在高建築中的應用
  20. In addition, based on the research of this technique in recent years, combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in gravel and the principle of choosing grouting parameters, which provides experiences for applying this technique and further studying

    同時,本文在吸取近年來對樁端壓力漿技術研究成果的基礎上,結合現場試驗研究結果,提出了適用於卵石中滲透型、壓密型樁端壓力漿樁單樁豎向極限承載力計算方法和卵石漿參數選取原則。
分享友人