焊接螺栓 的英文怎麼說

中文拼音 [hànjiēluóshuān]
焊接螺栓 英文
schweissschraube
  • : 動詞(用熔化的金屬修補金屬器物或使金屬工件連接起來) weld; solder
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : 1. [動物學] (軟體動物) spiral shell; snail; conch 2. (螺旋形的指紋) whorl (in fingerprint)
  • : 名詞1. (可開關的機件) bolt; plug 2. (塞子) stopper; cork
  • 焊接 : weld; welding; soldering; seal; sealing; sealing-in; shutting together
  • 螺栓 : bolt; screw bolt; threaded bolt
  1. The main frame is welded structural steel to which are bolted the channel iron lift support beams

    主要框架是結構鋼,其中以渠道鐵升降機來固定橫梁。
  2. Welding - studs and ceramic ferrules for arc stud welding

    .弧和陶瓷箍套
  3. With the application of concrete - filled steel tubular member to mega - frame structures, the connection forms of main beam - column can be classified as welded rigid connection, bolted gemel connection and semi - rigid connection

    摘要隨著鋼管混凝土組合截面日愈增多地應用於巨型框架中,主框架樑柱的連形式分為剛性連與半剛性連
  4. The steel construction is made up of roof beam, post, purlin, roofing and wall, adopt the automatic production line to weld and take shape in the factory, construction site spend high - strength bolted joint reduce weld work load, make progress and quality receive the complete assurance

    鋼結構由梁、柱、檁條、屋面和墻體組成,工廠內採用自動化生產線成形,施工現場用高強,減少了工作量,使進度和質量得到完全保證。
  5. In this thesis, four types of steel beam - rectangular cfst column connections, including normal welded flange plate ( wfp ) connection, bolted flange plate ( bfp ) connection, stiffened end plate ( sep ) connection and double split - tee plate ( dst ) connection, were designed based on the configuration of steel frame connection. total 8 models, 2 models of each kind of connections were tested under low - reversed cyclic loading at the end of cfst columns. the relationships between force and displacement at the end of columns, the relationships between the moment and rotation of the joints, degradations of strength and stiffness, ductility, failure mechanism and failure characteristics of these four connections under different axial - compression ratios were presented

    本文借鑒鋼框架節點構造,設計了四種類型矩形鋼管混凝土柱與鋼梁連節點,包括常規( wfp )節點、翼緣全( bfp )節點、雙t板連( dst )節點以及加勁端板連( sep )節點,進行了四類節點8個模型試件在柱端低周反復荷載作用下的抗震性能試驗研究,比較了不同軸壓比下節點的滯回性能、強度與剛度退化、延性、破壞機理與破壞特徵,主要結論有: 1 、節點的位移滯回曲線與轉角滯回曲線為塊型分佈,沒有或略有捏攏現象,耗能能力強; 2 、軸壓比對節點滯回曲線有顯著影響,全部節點都有顯著的剛度退化; 3 、位移與轉角骨架曲線在峰值荷載後有較長的水平或下降段,具有良好的延性性能; 4 、從整體抗震性能上看,翼緣全節點、雙t板連與加勁端板連節點都優于常規節點,可在實際工程中加以推廣。
  6. We are specialized in producing sets of large - hex high - strength bolts, sets of torshear type high - strength bolts, sets of dacrolon bolts and cheese head studs for arc stud welding

    我公司技術力量雄厚,生產設備精良,檢測設備完善,是生產鋼結構用高強度大六角副、扭剪型副、達克羅副和電弧用圓柱頭釘的專業公司。
  7. Results showed that the ductility of bolt spjice is much better than welds, weaker splice joints develop larger plastic deformation, slipping between faying surfaces, bearing of bolts to hole surfaces and buckling of splicing plates are all ideal energy dissipation mechanism

    試驗結果表明:節點的延性遠好於樑柱縫連;較弱的拼節點產生較大的塑性變形;觸面的滑移、與孔壁的擠壓和翼緣拼板的屈曲都具有良好的耗能能力。
  8. Then an thorough computer modeling using finite element program with material, geometry and state triple - nonlinear taken into account is carried out on a series of influencing factors, such as comparison with npn - beam splice connection, comparison of varies designed theories, and the varying of fraction coefficient, diameter, grade, pretension and arrangement of bolts, thickness of web and flanges of beam and column, splicing location, axial loading on column, etc. lots of useful conclusions are drawn form computer modelling. finally, design and construction suggestions are given out. this study fills the black in the field of steel beam - to - column connection with cantilever beam high - strength bolted - splicing at both home and abroad

    然後,本文在考慮材料、幾何和狀態三重非線性的基礎上,對該連形式進行了全面的計算機模擬,主要考慮了帶懸臂梁段全的樑柱連節點與無拼的樑柱連及翼緣對腹板拼的連節點的對比,各種設計方法之間的對比,以及翼緣拼和腹板拼間距、直徑和數量,拼點與梁端之間的距離,梁和柱的翼緣、腹板厚度,柱的軸力,觸面的摩擦系數,翼緣和腹板拼板的厚度等因素的影響。
  9. The commonly used methods of connections, especially the high - strength bolted connection and welding with bolting mixed connections are discussed in more detail. the analysis for the problems, such as partial penetrated butt weld and welding deformation is also discussed in the paper

    對工程中採用較多連如高強度-混合連等作了較深入分析;對工程中容易出現問題連如不透的對縫計算方法及可能出現的變形及處理等問題也作了較深入探討。
  10. Non - soldering and soldering compression fittings - stud ends for use with union nut ; design sheet

    非釬和釬壓合頭.與管母使用的雙頭端部
  11. This kind of connection has the combined advantage of shop welding and on - site high - strength bolting, which should have a better energy dissaption and plastic rotation capacity

    這種連具有工廠,工地高強的綜合優勢,具有較好的耗能能力、塑性轉動能力等優點。
  12. The paper expounds how to find out the potential safe problems and unobvious defects, such as beyond - limit deflection in fixed girders for gantry bucket wheel stacker / reclaimer, by means of completely checking fixed girders, movable beams, geometric shapes of stiff and flexible supporters, metal thickness and welding and how to solve the safe problems and remove the defects

    摘要通過對門式斗輪堆取料機固定梁、活動梁、剛性支腿、撓性支腿的幾何形狀、金屬厚度、縫狀況、聯狀況進行全面檢測,發現門式斗輪堆取料機固定梁存在下撓超標的安全隱患和其他非明顯缺陷,從而對堆取料機的安全狀況有了全面的掌握,並根據檢測結論對固定梁下撓缺陷及時進行校正消缺,避免發生設備垮塌事故,保證了堆取料機的安全穩定運行。
  13. This voltage transformer has three poles and the iron is made of sheet. the body is fixed on the box cover by clamping. there have the primary and secondary bushing also on the box cover

    本系列電壓互感器的鐵心由條形矽片疊成,為三柱芯式,器身用鐵夾件固定在箱蓋上,在箱蓋上裝有一次及二次套管等,油箱用鋼板成,油箱壁下部裝有及放油塞,箱底有四個安裝孔。
  14. The connection of steel structures is an important part for the steel structural member. the types of connections which are commonly used in practical engineering, such as welding, bolting, high - strength bolting and mixed connections are discussed in this paper

    鋼結構連是鋼結構構件的重要組成部分,本文結合工程實踐,著重對鋼結構中廣泛應用的連形式,如、普通、高強度和混合連等進行了敘述。
  15. En iso 14555 welding. arc stud welding of metallic materials

    .金屬材料雙端
  16. 962m respectively ). neighbouring segments are linked with bolts and welding. after the girders were segmented, guesseted plates were used with high - strength bolted oints to connect the web plates, and the higher and lower flange plates were butt - welded

    相鄰梁段之間的連形式為混合型連,採用節點板把腹板用高強後上、下翼緣板分別對
  17. Abstract : in this article, some high - rise steel structural lifting methods, including choice of lifting machines, lifting method, measurement and correction of columns and beams, installment of high - strengthen bolts, and welding of pegs of profiling steel boards, are introduced

    文摘:介紹高層鋼結構吊裝機械的選擇,樑柱的吊裝方法和測量校正,高強的安裝,壓型鋼板釘的
  18. The bracket and vertical column of cable tray will be installed by welding or expansion bolt of the basement. the welding place treatment will be done by painting

    橋架的立柱、托臂等支架可與基礎預埋件固定,也可採用膨脹固定,對于現場處一定要做好防腐處理,通常由用戶現場塗刷防腐漆。
  19. Non - soldering compression fittings with cutting ring - double ended stud ends with parallel threads and shaft for stud ends type a

    帶切割環的非釬壓合頭.柱端a型帶平行紋和
  20. Steel nuts and bolts for resistance projection welding - specification for welding of weld nuts and weld bolts

    電阻凸的鋼母和.母和規范
分享友人