煉鋼廠 的英文怎麼說

中文拼音 [liàngāngchǎng]
煉鋼廠 英文
steel mill
  • : 動1. (用加熱等辦法使物質純凈或堅韌) refine; smelt; work 2. (燒) temper with fire 3. (使詞句精美簡潔) polish
  • : 鋼名詞(鐵和碳的合金) steel
  • : 廠同「庵」 (多用於人名)
  • 煉鋼 : steelmaking; steelification煉鋼廠 steel plant; steel melting plant; steelworks; 煉鋼工人 steelwor...
  1. Those who have seen a steel mill will know something of variety processes, from the blast-furnace onwards !

    參觀過煉鋼廠的人都會對的各個不同步驟有所了解,這就是從高爐開始。
  2. Multi - laboratory center of pangang is worked for production of steel - making factory. many producing processes, such as desulfurize 、 extracting - vanadium 、 steel - marking 、 refine out ladle ( lf 、 rh ) 、 caster etc, need directing and controlling by sampling and analysis, in order to get chemical composition information of molten iron 、 semisteel 、 molten steel 、 vanadium slag and slag and develop producing

    綜合化驗中心是為煉鋼廠生產服務的,煉鋼廠各生產工序如脫硫、提釩、、爐外精( lf 、 rh ) 、連鑄等,都必須通過取樣、化驗分析來實時獲得鐵水、半水以及提釩釩渣、爐渣等化學成分來指導、優化生產。
  3. Since sixties, the specialized sub - company has completed ventilation, air conditioning and dust removal work for both industries and domestic purpose including pharmacy, smeltery, steel mill, motor manufacturer, construction material manufacturer, the cinema halls, seaman club, broadcast and tv centers to the luxurious hotels and skyscrapers

    本公司的專業安裝公司,自六十年代至今,先後完成了制藥、冶、發動機製造、建材等礦的通風、空調、除塵以及高級豪華影劇院、賓館大廈、彩電播送中心等民用製冷空調工程的安裝。
  4. I had saw one of the conventional steelworks : huge blast furnace, converter, steel ingot, mile of railway track

    我參觀過傳統的煉鋼廠:巨大的高爐、轉爐、錠,長達幾英里的鐵軌。
  5. I have seen one of the conventional steelworks : huge blast furnace, converter, steel ingot, miles of railway track

    我參觀過傳統的煉鋼廠:巨大的高爐、轉爐、錠,長達幾英里的鐵軌。
  6. The steel mill contracted for ten million tons of iron ore

    煉鋼廠立約訂購1000萬噸鐵礦。
  7. Design of device for maintaining cooling flue system of steelworks

    煉鋼廠汽化冷卻煙道維護設備的設計
  8. Refractory products. dimensions of ladle bricks for steelworks and foundries

    耐火製品.煉鋼廠和鑄造包襯磚的尺寸
  9. Steelworks, rolling mills and cranes ; interference fits using oil under pressure ; application, dimensions, design

    煉鋼廠機和起重機.用油壓的過盈配合.用途尺
  10. Equipment for steelworks and rolling mills ; shuttering steeves for anchor boxes according to din 24539 ; dimensions, designation

    煉鋼廠和軋機用設備.按din24539的錨盒的模板吊桿
  11. Analysis of cracks formed in the trunnion ring of converters in steel making plants and the reconstructive measures

    煉鋼廠轉爐托圈裂紋產生原因分析及改造措施
  12. Based on practical project of inspecting, appraising and reinforcing a main heavy factory building, especially its steel crane girder system, of the second steel mill belonging to taiyuan steel & iron corporation, whose technology renovation leads to increase tonnage of many heavy cranes and vertical load of frame - bent structure, first the structure and its members were investigated, inspected, calculated and analyzed, and their reliability was appraised respectively and the strengthening projects or the measures to remedy were given. then, in accordance with the requirement to strengthen the girders under non - stop production, the feasibility of strengthening the crane girders by adding steel diagonal braces underneath the existing girders has been studied by inspecting and evaluating the strengthening effect of the crane girders and comparing with other reinforcing scheme

    本文結合太(集團)有限公司第二煉鋼廠房由於生產工藝改造要求,加大多臺重型吊車噸位及bc跨( 1 ) ( 8 )軸線框排架各層豎向(設備)荷載后,對房結構,尤其吊車梁系統進行檢測鑒定與加固設計的實際工程,首先對房結構進行了現場調研、技術檢查、測試以及內力和承載能力的計算與分析(考慮抗震) ,並根據檢測、計算與分析結果,對房結構、構件的可靠性進行了評定,並綜合提出鑒定結論和加固處理建議。
  13. Entities directly under the enterprise include the no. 1 iron mill, the no. 2 iron mill, steel mill, steel rolling mill, h - beam mill, sintering plant, oxygen plant, electric power plant, real estate development company, environmental protection material company, guolong industry and trade company, and fujian xinghua trade company

    企業下設的直屬單位有一、二煉鋼廠、棒材、 h型、燒結、制氧、發電、房地產開發公司、達隆工貿公司、國隆工貿公司、福建興華貿易有限公司。
  14. Being resipansible for technology guality of this unit, i have arganized and completed or then 10 great consultative projects in meteluvgical industing including feasible research repart and preliminary design of dan yang ring - type sintering plant loaned from world bank. designed no. 6 semi - contiuars rolling mill line of shagang group ; nangang group steel making plant water treatinent system, feasible research report and preliminarg design of nangang group no. 3 continuous casting machiue and hebei wwan iron making co. 24m2 rinn - tgpe sintering plant, as chief - disigner, none argamizing working drawing disign far it

    作為本單位技術質量負責人,近年來組織了完成了10餘項較大規模的冶多工程咨詢任務,其中包括世行貸款的丹陽環燒工程可研和初步設計;擔負港沙集團六軋車間半連軋生產線設計;南集團煉鋼廠水處理系統完善;南集團煉鋼廠矩形櫃連鑄可研及初步設計;河北武安市鐵業公司24m ^ 2環燒工程擔任總設計師,完成了初步設計,正組織開展施工圖設計。
  15. Success in addition of no. 2 slab caster of the pangang iron and steel co. have brought large economic and social benefits ! the succeed example design of automation are provided for the decision and popularization and implementation of add for old equipment. this project was conjoin of design and program and debug. the control effect of no. 2 slab caster is satisfying, moreover, achieve high speed and whole automatic aim

    煉鋼廠新增2 #板坯連鑄機的成功,將具有很好的經濟和社會效益,尤其是該項目的自動化設計方案為自動化控制系統在企業舊設備改造及再增加新設備時的決策、推廣、實施提供了一套較為有效的、可供借鑒的方法和模式。
  16. But steel mills spewing particulates into the air and sucking electricity from china ' s coal - fired power plants account for a big chunk of the country ' s surging emissions of sulfur dioxide and carbon dioxide

    但是,煉鋼廠向空氣中排放的粉塵顆粒和中國火力發電站排放的廢氣中含有大量的二氧化硫和二氧化碳等廢棄物,這也是中國主要的空氣污染源。
  17. Running such a steel works, we have to take pollution into account

    創辦這樣一個煉鋼廠,我們不得不考慮到污染問題。
  18. The present research situation of molten steel temperature drop of ladle in steelmaking plants is described

    摘要介紹了煉鋼廠包內水溫降研究的現狀。
  19. After testing of six months, ccdwas has been confirmed to be qualified already at present

    該系統經三個月運行測試,功能正常,目前已被本煉鋼廠驗收合格。
  20. Pan gang refining vanadium and steel - making plant is the main productive plant of panzhihua steel group

    提釩煉鋼廠是攀(集團)公司的主體生產礦。
分享友人