熱采井 的英文怎麼說
中文拼音 [rècǎijǐng]
熱采井
英文
thermal production wells-
The drill and petroleum extraction tools test - well is made up of the multifunction test - machine system ( hydraulic system ), the calefaction system the circulation system, the testing system and the assistant system
鉆采工具試驗井共由多功能試驗機系統(液壓系統) 、加熱系統、循環系統、測試系統和輔助系統組成。In the course of drilling, mining and deposition of hear producing materials in the subsurface, the original natural geothermal field is disturbed.
在鉆井,采礦和發熱物質的地下深積的過程中,原始的天然地熱場受到了擾動。The heat contained in a natural steam field is exploited by drilling a suitable number of wells down to the reservoir.
天然蒸氣田所含有的熱能可以通過鉆井的方法,即打適當數量的井孔到達熱儲的方法進行開采。7mpa / km in the center of the zone ( 6 ) in the hot dry rock geothermal energy extraction system, after the system start to operate, the normal stress of crack show the pronounced influence depending on the temperature ' s change in a month, there are a marked drop in temperature nearby the injection well, forming a lower stress area, with the heat extraction, the temperature ' s change even gradually, but the temperature descend quickly nearby the production well, forming a new lower stress area
( 6 )高溫巖體地熱開發中,裂縫面法向應力受溫度變化的顯著影響,在系統開始運行的一個月內,注入井附近區域其溫度降低較快,形成低應力區;隨開采時間的延長,其溫度變化逐漸平緩,而生產井附近區域溫度降低加快,逐漸形成新的低應力區。Resistivity drop mechanism during heavy oil thermal recovery
稠油熱采井電阻率顯著降低的機理研究Along with construction of hydropower project, exploitation of ore, deposition of nuclear waste, development of terrestrial heat and so on, more and more geotechnical engineering is in the high hydraulic head, and deep embedded geohydrological condition, the hydraulic fracturing of rock mass is paid more and more attentions by engineering scholars
隨著水電工程建設、井工礦石開采、地下核廢料儲存、地熱開發等越來越多的巖土工程都處于高水頭、大埋深等惡劣水文地質條件下,巖體水力劈裂逐漸受到越來越多工程界學者的關注。Development of auto - adjusting sealing device of polished rod used on heavy oil thermal recovery wellhead
稠油熱采井口光桿自動調偏密封裝置According to the theory of developing viscous crude with screw pump and combined with the reservoir characteristic and oil property, fault block 70 is developed reasonably and effectively through a series of corollary technique including chemical pre - processing in the formation, viscosity decrease in the well bore, down - hole anchoring of screw pump, optimized design of screw pump, reasonable determination of the turning rate of screw pump, frequency alternating control, heat exchange and viscosity decrease in well head, monitoring of screw pump
依據螺桿泵開采重油的理論,結合澤70斷塊稠油油藏的特點和原油物性,通過實施地層化學預處理、井筒降粘、螺桿泵井下錨定、螺桿泵優化設計、螺桿泵合理轉速的確定、變頻控制、井口換熱降粘、螺桿泵監測等一系列螺桿泵配套工藝技術,使澤70斷塊得以合理有效的開發。Aiming at the coal under the building, rail and water, difficultly - mined coal and the side of strip mine, hardly mined, but it is utilization for the ucg study on field test of air coal gas, water coal gas, rich oxygen coal on the side of strip the side of strip mine mine of fu xin, using the ucg for the mineral well, getting the method for building stove of ucg, obtain different coal gas group and heat value for the different gasification craft high volatile, multiple thin coal seams on the side of strip mine are suitable to underground coal gasification to produce middle low heat value gas
摘要針對「三下」煤層,難採煤層,復雜煤層以及露天邊坡剩餘的煤炭資源,並工開采不經濟或難以開采,可利用煤炭地下氣化將這些殘余資源得以回收利用,試驗利用礦井式煤炭地下氣化方式,對阜新礦露天邊坡進行了空氣煤氣、水煤氣、富氧煤氣的工業性試驗研究,通過煤炭地下氣化工業性試驗,得出在露天邊坡礦井式氣化建爐方式,不同氣化工藝的煤氣組分,熱值。On the basis of the analysis of the topography, geomorphology, geological structure of geothermal area and surroundings in fuzhou city, and the survey of hydrogeological condition, and the distribution of geothermal drilling, and the geothermal water exploitation, and the groundwater regime, and the scale and distribution of land subsidence, the relationship between land subsidence and geothermal water regime was discussed. the result showed that land subsidence of geothermal area in fuzhou city was mainly induced by the excessive extraction of geothermal water in the thesis
在分析研究福州市溫泉區及周圍的地形地貌、地質構造、水文地質條件的基礎上,對地熱井分佈、流量、水位、地下熱水開採的歷史與現狀以及對地面沉降的表現、規模、分佈規律進行了深入的調查;分析了地下熱水歷年水位、水量動態變化特徵,並探討地下熱水與地面沉降的相關關系,結果表明過量開采地下熱水是導致福州市溫泉區地面沉降的主要原因。A quantitative evaluation for excess pore pressure and wellbore stress around a cased well under steam injection
熱采過程中地層超孔隙壓力與井眼應力的定量評價The results of reserch work show that the area of ca012, ca031, ca060 and the area near the shi - cun faultage are adventage exploratory targets. the succeed possibillity is bigger. but it has the high venture in all. it is suggested to frac - pack, to drill directional well to test oil in steam stimulation
研究結果表明:位於火山口附近的草12井區和草31井區、草60井區、石村斷層附近是比較有利的勘探目標,勘探成功的可能性較大,建議利用壓裂引效、鉆定向井的方法進行熱采試油,並開展全區測井約束地震反演,對油氣成藏進行更全面的評價。Six measures to be proposed to lower the crude oil cost with liaohe oilfield the six measures mainly focuses on the optimizing resource deploy, scientifically distribute the gas injection for thermal recovering heavy oil, refine the power management. optimizing fuel structure, optimizing downhole operation programes, optimizing the distribution of crude oil production scale and lower the crude oil cost
三是制定了遼河油田降低原油生產成本的6項控制措施。 6項控制措施的主要內容是優化資源配置、科學配置稠油熱采注汽量、精細用電管理、優化燃料結構、優化井下作業措施方案、優化產能建設方案,降低原油成本。分享友人