爆裂法 的英文怎麼說

中文拼音 [bàoliè]
爆裂法 英文
blasting and shooting
  • : 動詞1. (猛然破裂或迸出) explode; burst 2. (放在滾油里快炒) quick-fry
  • : 裂動詞[方言] (東西的兩部分向兩旁分開) open
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 爆裂 : burst; crack; erupt; pop open; rupture; blowout
  1. Standard test method for burst strength of surgical sealants

    外科封閉劑強度的標準試驗方
  2. The plane had a reputation as ` being a " flying bomb " which would burst into flame from even a single, small spark

    飛機有了「飛行炸彈」的說,突然出現的一個小火花造成火焰般
  3. Finally, some methods calculating cast blasting parameters and pre - splitting blast parameters and some advices of minish losing coal were brought forward

    最後給出了確定高臺階拋擲破參數和預破參數的方,並提出了減小煤損失的一些措施。
  4. During blasting test of rock split in advance using double factors test method, the work is reduced and predigested

    在預破試驗中,採用雙因素試驗方,減少了試驗的工作量。
  5. The application of evaluating grade in thoracolumbar burst fracture

    評分分級在胸腰椎骨折中的應用
  6. Full - flow lubricating oil filters for internal combustion engines - method of test for static burst pressure

    內燃機用全流式潤滑油過濾器.第6部分:靜態壓力的試驗方
  7. Methods of test for full - flow lubricating oil filters for internal combustion engines. part 6 : static burst pressure test

    內燃機用全流量潤滑油過濾器的試驗方.第6部分:靜態壓力試驗
  8. Methods of test for adhesives - physical tests on hot - melt adhesives - determination of low temperature flexibility or cold crack temperature

    粘合劑試驗方.第h2部分:熱熔粘合劑物理試驗.低溫撓性及冷溫度測定
  9. The research shows that : 1 ) the ductility of the hsc bending members constructed is much greater than 5 ; 2 ) increasing the vertical links and distribution steel can increase the deflection under ultimate moment ; 3 ) with appropriate compressive bars, vertical links and distribution steel the increase of moment after yield and the decrease of moment under ultimate moment can be ignored, so the ductility of the hsc bending member is much larger ; 3 ) the width / depth ratio of hsc bending member has no obvious effect on the ultimate compressive strain of concrete ; 4 ) the method used here to calculate the deflection is applicable ; 5 ) the location of crack coincides with the location of vertical links and distribution steel ; 6 ) the bending property of the hsc structure under the blast load can meet the demand of protective engineering

    研究表明:本文研究的梁、板構件的延性比遠大於5 ;增加箍筋(鉤筋、分佈筋)含量,可以提高壓區混凝土剝落時的撓度;在適當的受壓筋、箍筋(鉤筋、分佈筋)含量下,可以忽略壓區混凝土剝落瞬間的承載力下降,從而大大提高構件的延性;受彎構件的寬高比對壓區混凝土極限應變的影響不明顯;受彎構件的縫間距受箍筋(鉤筋、分佈筋)的布置影響;文中所用的承載力和變形計算方是可行的。化試驗表明,高強混凝土構件的動載抗彎性能能夠滿足防護結構的要求。
  10. In this paper, the state of the art of the engineering controlled explosion and the finite element method ( fem ) are reviewed. in order to analyze and simulate the demolishment of frame - structured buildings due to controlled blasting, the method of killing or activating elements, a high level technique in fem, and the special element - solid65 are introduced to the blasting field first in china by the author

    本文回顧和總結了工程式控制制破和有限單元的發展歷史及其研究現狀,在國內首次把單元生死這一有限元高級處理技術和ansys軟體中特有的solid65單元引入到破拆除工程領域,用其進行框架結構樓房破拆除的計算機模擬,探討了構件在完全破壞前的應力、應變、縫生成和塑性鉸形成位置。
  11. Unlike aircraft flights, measurement of meteorological parameters using radiosonde could reach an altitude of 30, 000 metres before the balloon burst

    探空氣球可升至30公里高才,相對于用飛機探測的方,無線電探空儀可探測更高層的大氣資料。
  12. How to ensure the project implement safely and effectively, esp in the complicated condition of geology, the terrain and its features, is the key to restrict the project finishing successfully ; in this paper, the theoretic analyse and pratical study based on the extension of 309 country road ( from wuan to shexian in hebei province ), adopt the method of theoretical analyse, caculater and experiment, improve the controlling blasting skill and construction crafr of roadbed stonework, control the blasting harm effectively, accomplish the construction quickly and safely in normal conditions. the paper puts forward to the relative parameter applying to roadbed extension in beforecrack blasting, and raises the combination of beforecrack demolition and buffer demolition, which is the main way to conctrol the side - slope stable and taking shape. putting to use the achievement produces great social benifet and economic benefitjt has widely practical future

    特別是在復雜的地質,地形及地物條件下,如何保證工程的安全快速有效實施成為制約工程順利完成的關鍵。本文的理論分析和實踐研究以國道309河北武安至涉縣段改建工程為依託,採用理論分析計算與現場試驗相結合的方,研究並優化了路基石方控制破技術與施工工藝,有效控制了破危害,實現了保證現有公路正常運營條件下的快速安全施工,本文提出了在預破中適合於路基擴塹工程的有關參數。同時提出了預破與緩沖破相結合是控制邊坡穩定和成形的主要途徑。
  13. Methods 50 cases of orbital fracture were collected from 3653 cases of forensic medical examination, and dividing into three groups : group : blowout orbital fracture without fracture of orbital margin, group : direct fracture with fracture of orbital margin ; group : complicated fracture with blowout fracture and direct fracture

    從3653例損傷程度的醫學鑒定中篩選出涉及眼眶骨折的案例,分成3組:組:性骨折,眼眶骨折而眶緣無骨折;組:直接骨折,合併眶緣骨折;組:復合骨折,上述兩種骨折兼而有之。
  14. Experimental investigation on splitting furnace slag by blasting

    高爐殘鐵破壞試驗研究
  15. Test method for explosion resistance of dense refractory castables

    緻密耐火澆注料抗性.試驗方
  16. Hydraulic fluid power. filter elements. methods for checking collapsing or bursting resistance

    液壓流體動力.過濾元件.抗破壞或抗強度檢驗方
  17. Anterior decompression and internal fixation for treating thoracolumbar spinal fracture

    麻醉下手牽引復位在胸腰椎骨折後路手術前的應用
  18. When tube wall strength can not bear inner steam pressure in the tube, blowout of low - temperature tube occurs

    當管壁強度無承受管內蒸汽壓力時,導致低溫過熱器管
  19. Through experimental detection methods of macro inspection, chemical composition analyzing, mechanic performance testing, micro metallography analyzing and x ray diffraction, the blowout reasons of low - temperature superheater tube were analyzed in the process of boiler operation

    摘要通過宏觀檢查,化學成分分析,機械性能測試,金相檢驗和x射線衍射等試驗檢測方,對鍋爐運行過程中低溫段過熱器管原因進行了分析。
  20. For reducing cost and accelerating construction speed sparingly, at present in irrigation works construct in producing testing progressively and antiabrasion layer that popularize excavating method competent to split law in advance, flexible cushion layer etc. accumulative charge to vertical hole has been tested in three gorege project only

    為了節省施工成本、加快施工進度,目前在水利工程施工生產中逐步試驗並推廣的保護層開挖方有水平預,柔性墊層等。對於垂直孔水平聚能藥包破用於生產試驗僅在三峽進行過。
分享友人