狀態內轉換 的英文怎麼說

中文拼音 [zhuàngtàinèizhuǎnhuàn]
狀態內轉換 英文
transistion within
  • : Ⅰ名詞1 (形狀) form; shape 2 (情況) state; condition; situation; circumstances 3 (陳述事件或...
  • : 名詞1. (形狀; 狀態) form; condition; appearance 2. [物理學] (物質結構的狀態或階段) state 3. [語言學] (一種語法范疇) voice
  • : 名詞1. (內部; 里頭; 里邊) inner; inside; within 2. (妻子或妻子的親屬) one's wife or her relatives 3. (姓氏) a surname
  • : 轉構詞成分。
  • : 動詞1. (給人東西同時從他那裡取得別的東西) exchange; barter; trade 2. (變換; 更換) change 3. (兌換) exchange; cash
  • 狀態 : status; state; condition; state of affairs: (病的)危險狀態 critical condition; 戰爭狀態 state o...
  • 轉換 : change; transform; convert; switch
  1. 3 pnueli a. a temporal logic of concurrent programs. theoretical computer science, 1981, 13 : 45 - 60. 4 mcmillan k l. symbolic model checking

    符號化的模型檢測技術利用二叉圖binary decision diagram表示關系,降低了系統模型所需的存空間。
  2. We do research on the transitions between states of network protocol, the protocol misusage detection model based on markov chain, the framework of the ids technology and protocol anormity after we discuss the current technology. the main research contents of this paper include : research on transitions between states of network protocol and session process, protocol misuage and the anomaly detection model based on markov chain, the research of intrusion detection framework, more accurately model based on the characteristic of the network traffic and so on

    在分析了現有入侵檢測系統的基礎上,本文圍繞典型網路協議、基於馬爾可夫鏈的檢測模型、入侵檢測技術框架、以及協議異常等幾個方面展開深入研究,主要工作容包括:典型網路協議的分析和會話過程的研究;基於馬爾可夫鏈的網路異常檢測模型;分散式的檢測架構;針對網路流量特徵而提出了精確的檢測模型等。
  3. Abstract : the system, in the span - by - span construction of brid ge, willexperience three kinds of shifts from the state of simple beam to the continuous state, from overhanging beam to the continuous beam and from few - spans continuous beam to required degree span by span. meanwhile, structural calculatin g graphics and the internal force are changing with the three shifts

    文摘:在橋梁工程逐孔施工過程中,體系將發生由簡支梁到連續梁,由懸臂梁到連續梁,由少跨連續梁逐孔延伸到所要求的體系三種,同時結構計算圖式和力也發生變化。
  4. Thioredoxins, an ubiquitous small proteins with a redox active disulfide bridge in its conserved motif - cp ( g ) pc -, are universally distributed in eucaryote and procaryote and have a molecular mass of approximately 12kda. by its disulfide / dithiol interchange reaction, this protein can transmit the regulatory signals to seleted targets ( enzymes, transcription factors etc ) and plays an important role in many plant physiological processes that includes photosynthesis, dna synthesis, transcription, protein disulfide reduction, protein repair, filamentous phage assembly, cell apoptosis and seeds germinating and so on

    該蛋白質中含有保守的- cp ( g ) pc -氨基酸活性基序,該基序中的兩個半胱氨酸殘基可通過巰基二硫鍵的實現其氧化還原的變化和電子氫的傳遞,對細胞中與氧化還原相關的多種生理過程的調節起重要作用。通過同許多酶類、蛋白類、細胞活性因子相藕連, trx能對光合作用、 dna復制、基因錄、細胞凋亡和生長、噬菌體組裝、蛋白質的還原和修復信號傳導等生理過程產生影響和調節。
  5. This thesis focuses on the ingress process module of ctu, which translates c - 5 dcp format to rainier 4gs3. the specification analysis, architecture and logic design, functional simulation testbench design, synthesis report and testing result are discussed in this thesis. the research work mainly includes : the specification analysis and design requirements of ctu logic ; the architecture and logical design of ingress process module, which includes receive control fsm, send control fsm and cell position adjustment logic ; the performance improvement of ingress process module to receive and transmit data cell at the full line speed

    本論文的主要研究工作包括:通信協議邏輯的功能分析和設計需求;通信協議邏輯上行方向的系統分析及體系結構設計,包括上行接收機、發送機、信元位元組位置調整機制等的設計;通信協議邏輯上行方向的線速設計,主要是上行接收的線速設計,要使用流水設計技術;提出了高速實現roundrobin調度策略的實現方法,並設計實現了桶式移位器和優先級編碼電路;應用bfm模擬模型設計了上行處理各模塊的模擬testbench ,完成了各級模塊的模塊模擬和系統集成模擬。
  6. The second chapter simply introduces the development of alternate asynchronous inverter technology and retrospects some types of energy - saving systems for hydraulic elevators. then the working principles of the project are discussed and analyzed at four different working status, i. e. light load upwards, heavy load upwards, light load downwards and heavy load downwards. and the chapter focus on the introduction of structure design of pump station, calculation and type selection of pump / motor reversible units, research on oil leakage principles of accumulator circuit, design of accumulator - pump / motor pressure - energy transformer and integrated valve blocks, etc. the last but not the least, the electrical wiring of vector inverter control cabin and design of computer control and data acquisition system are introduced

    論文第二章首先簡單介紹了交流異步電動機變頻調速技術的發展概況,在回顧電梯液壓控制系統節能技術的基礎上,介紹了本課題研製的「採用蓄能器的液壓電梯變頻節能控制系統研究」的基本原理,分析了動力系統在電梯轎廂輕載上下行、重載上下行等四種典型工況下的基本工作和工作方式;詳細地介紹了本課題節能系統液壓動力泵站的結構設計和參數設計,重點研究了液壓動力泵站的結構設計、液壓泵馬達可逆性問題及其選型設計計算、蓄能器迴路泄漏油損失機理的研究及其補償裝置的設計、蓄能器-泵馬達壓力能量裝置的設計、多功能集成控制閥組的設計等容;最後簡單介紹了本課題矢量控制變頻控制櫃的外部附件電氣接線、計算機控制及數據採集系統的硬體設計等容。
  7. 4 session id of the blocking latch owner could not be determined due to internal latch state transitions

    - 4 =由於部閂鎖而無法確定阻塞閂鎖所有者的會話id 。
  8. 4 session id of the blocking latch owner could not be determined at this time because of internal latch state transitions

    - 4 =由於部閂鎖,此時無法確定阻塞閂鎖所有者的會話id 。
  9. Efforts are concentrated on how to improve the performances of the synchronous and velocity sensor of high speed rotating mirror camera, creative ideas in this paper are displayed as follows. ( 1 ) high speed rotating mirror camera signal is processed by means of opto - electronic system. the advantages of the opto - electronic system, such as good emi resistance and fast processing ability, are employed to optimize the design

    本文的工作就是圍繞如何提高高速鏡相機同步與速傳感器的性能開展的,主要工作容和創新點如下: ( 1 )利用光電系統對高速鏡相機同步與速度傳感信號進行處理本文利用光電傳感系統的抗電磁干擾及可高速處理的特性,把高速旋下反射鏡的時間參量為光信號,再經過光探測器為電信號。
  10. But because of an indeterminate flexible structure with many degree of redundancy, its variant inner force under dead - loading, nonlinear behavior and the correlation between construction method and completed structure, especially incessant conversion of system in construction method, these must bring many complicated change to construction internal force and displacement. these main factors resulting in construction control analysis become more important in the design of cable - stayed bridge

    但由於它屬于高次超靜定的柔性結構,恆載具有多樣性、結構呈非線性、施工過程與成橋具有相關性,特別是在施工階段結構體系的不斷,必然給橋梁結構帶來較復雜的力和位移變化,這些特點使得斜拉橋的施工控制分析成為突出的研究課題。
  11. Raising quality of workers, technological advance and centralization of capital are positive factors to promote economic growth, owing to converting extensive development of capital addition and enlargement scale of labor force into intensive development

    經濟發展由資本和勞動力數量的增大等外延的發展形涵的發展,即勞動力素質的改善、技術的進步以及資本集約度的上升等作為積極因素促進經濟的增長。
  12. A parameter indicates whether to clear the internal state of the encoder after the conversion

    一個參數指示后是否清除編碼器的
  13. A parameter indicates whether to clear the internal state of the decoder after the conversion

    一個參數,指示后是否要清除解碼器的
  14. Rotating pipes system are often encountered in the rotary machinery of engineering applications. with the popularity of rotary machinery in industry, the characteristics of the fluid flow and heat transfer in the controlling pipe system, the transporting pipe system, and the cooling pipe system are the main factors to improve the efficiencies of the rotary machinery. meanwhile, when a man is in the aerocraft with a high rotating speed or in the rotating machine for training, the flow in the blood vessel of body will change evidently and so the study on the flow in the blood vessel also becomes the important research field in the aerial - physiology

    在旋下,這些曲線管路系統中的流動和熱特性將會發生什麼樣的變化,是對管路系統的性能以及旋裝置的運行安全至關重要的問題,也是管道流動中研究很少,又是迫切需要解決的課題;同時,這個課題還可以應用於生物流體力學:當人體處于作高速旋或曲線運動的飛行器或宇航飛行員訓練的旋裝置中,人體血管血液流動將會發生什麼樣的變化,是航天生理學研究的重要課題。
  15. Study on mechanism of turbulent flow and heat transfer in rotating passages

    下蛇形通道流動與熱的機理研究
  16. For ballasts with rest mode facility changeover from rest mode to normal mode shall occur automatically at greater than 0. 9 times the off cycle extended to 3 s and the ballast put into the rest mode after 2 s of the off periods in the 500 switching cycles

    帶有休止裝置的自容式應急燈具,從休止向正常應在不大於0 . 9倍額定電壓下自動運行3秒,在500次開關周期結束切斷電源的2秒時間應使自容式燈具進入休止
  17. The ratio of story shear rigidity as well as the equivalent lateral rigidity ratio of story above the transfer story to the story under the transfer story should be designed properly to avoid the transfer story becoming weak story, thus the shear walls and the columns in the large base will not yield before the elements above the transfer story ; ( 2 ) the translation - torsion coupled effects and the vibration in the plane should be considered in analysis of structure with large base and muti - towers

    層的設計除應控制層剪切剛度比外,還應控制層上部與下部結構的等效側向剛度比以避免薄弱層出現在框支層,保證地震作用下落地剪力墻和框支柱不先於層上部結構進入屈服;大底盤多塔樓結構的分析必須考慮平扭耦聯振動和樓板平面振動的影響。
  18. On the basis of deeply comprehending, the thesis considers the internal cause of cb financing is to decrease many types of financing costs in the status of asymmetric information. so, creatively and systematacially, we divide them into agency costs, under - pricing and financial distress costs and risk uncertainty costs. by using two models and existing evidences, the thesis then discusses the relative advantages and appropriate firm ' s characteristics of cb financing

    基於對可債券融資原因的深入理解,本文認為公司應用可債券融資的因在於減輕信息不對稱下的多種融資成本,創造性和系統性的將之分為代理成本、價值低估及財務危機成本和風險不確定性成本三大方面,應用兩個模型的論述,輔以已有的實證結果,詳細論述了可回購可債券融資的相對優勢和適用公司特徵。
  19. In chapter 2, some key concepts related with c / os - ii kernel is described in details, such as task states and state - transition, task management and scheduling, time management, inter - task communication and synchronization, interrupt and clock tick. the cons and pros of c / os - ii are also listed. and a new strategy is proposed to improve the task - scheduling

    第二章對c / os - ii核進行分析,詳細解釋任務、任務管理及調度、時間管理、任務間通信與同步以及中斷與時鐘節拍等原理,分析了c / os - ii實時核的優缺點,並提出了c / os - ii的任務調度策略的改進方法。
  20. Change over from normal to emergency mode shall occur at not less than 0. 6 times rated supply voltage, it shall not occur at greater than 0. 85 times rated supply voltage

    從正常到應急應發生在不少於06倍額定電壓、不能超過0 . 85倍的額定電壓范圍
分享友人