現場安裝時間 的英文怎麼說
中文拼音 [xiànchǎngānzhuāngshíjiān]
現場安裝時間
英文
field installation time- 現 : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
- 場 : 場Ⅰ名詞1 (平坦的空地 多用來翻曬糧食 碾軋穀物) a level open space; threshing ground 2 [方言] (...
- 裝 : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
- 時 : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
- 間 : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
- 現場 : 1. (出事地點) scene 2. (工作地點) site; spot; on-site; work field
- 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
-
Through experiments analysis, it is found that the integrated lts is the most versatile laser tracker available for dimensioning, tool building, alignment, and reverse engineering applications with the characteristic of high tracking precision and excellent dynamic capability. this paper also provided an effective new method and technique in the application of large workpieces and industry field measurement and orientation by using dual - frequency laser interferometer
實驗結果表西安理工大學碩士學位論文明這套跟蹤測量系統能夠適用於高精度、響應速度快和動態性能要求高的工業現場安裝與測量,具有廣泛的應用前景,同時也為雙頻激光干涉儀在大工件和現場測量、定位的應用提供了一種有效的方法與技術,並為三維空間的跟蹤測量方法的研究奠定基礎。Buyer shall be responsible for timely completion, in accordance with the installation timetable herein, of any necessary on - site preparations and modifications of buyer ' s facilities based on the specifications set forth in the site preparation guidelines previously provided to buyer
買方應根據本合同的安裝時間表,按照預先交給買方的場地準備指南所規定的規格,負責按時完成任何必要的現場準備及買方設施的修改。We will strictly follow out the tenet of 24 hours services, go beyond services and for life services. the supplier should be notified by the buyer at 7 days before the transformer is confirmed for acceptance and delivery and the installation ; the supplier should reply and arrive in site within 24 hours after receiving the notifications. the both parties will check the transformer according to the list of transformer assembly altogether and examine the main body and accessories and parts and transformer oil
3嚴格貫徹「 24小時服務,超前服務,終身服務」的宗旨,變壓器在確定點件驗收安裝時間后,需方提前7天通知供方供方在接到信息后24小時內給予回復,並在24小時內到達現場,依照產品拆卸一覽表雙方共同點檢產品,並對產品的主體零部組附件變壓器油等進行驗收。Various entertainment facilities, including golden jazz opera performance hall can accommodate 300 people at the same time appreciate the brilliant performances performances, decoration works karaoke bought 50 : valley playground as a major giant hotel facilities, an exciting equipped with various recreational facilities and outdoor swimming pool electric ; in crystalline lakes fishing and also enjoy the fun barbecue ; foot of the mountains, clear water lakes were among the 143 guests p plus customers ; hotel collection business, restaurants, entertainment and leisure for the integration and surrounded by mountains, and down the mountain with water lake, fresh air, environmental standards quiet, japan is a modern city, the rare and leisure resort, relax themselves, the training session, the ideal choice for business talks
各項娛樂設施全,其中金爵歌劇院表演大廳可容納300人同時欣賞精彩的節目表演,裝修精緻的卡拉ok包房50間:大型巨人谷游樂場作為酒店的配套設施,場內配有各類精彩刺激的電動游樂設施及室外游泳池在清澈的湖畔還可享受到垂釣及燒烤的樂趣高山腳下,清水湖畔共有客房143間迎接八方來客酒店集商務飲食娛樂休閑為一體,且三面環山,山下有清水湖,空氣清新,環境安逸寧靜,是現代都市喧囂中難得一見的休閑渡假放鬆自已,會議培訓,商務洽談的理想之選。Fieldbus builds up interconnections among field instruments and field control units by providing a wholly digital, bi - directional and multi - variant communication path, which has no i only greatly improved the reliability and ability of anti - disturbance, but also sharply reduces the costs of installation and routine maintenance. can ( controller area bus ) belongs to the asynchronous communication network
現場總線使得現場儀表之間、現場儀表與控制設備之間構成網路互連系統,實現全數字化、雙向、多變量的數字通訊,這大大地提高了系統的可靠性和抗干擾能力,同時節省了整個系統的投資、安裝及後期維護費用。For field replacement, specify valve type, size and date of installation
適用於現場更換,訂購時指明閥門類型,通徑和安裝時間。In large rotating machinery using filmatic bearing ( turbogenerator, air compressor, etc. ) there is a potential trouble from impefect installation or running conditions, a metals " contact between rotors and shells. the trouble is usully called rubbing. the advantage of ae technologe in the rubbing diagnosis and early detection is showed. instead of classical ae characteristic parameters ( counts, amplitude, energy, duration and the other ones ) a new feature extraction by frequency analysis of ae envelop signals is discussed. both research of ae process and field experements indicate that periodic components in the envelop spectrum related to rotational speed increase evidently at the beginning of rubbing production, hence are highly sensitive to the rubbing fault diagnosis. according to the new design an acoustic emission equipment for the rubbing diagnosis named buaa ae testing system is developed and described
汽輪發電機、空氣壓縮機等採用油膜支撐的大型轉動機械,由於安裝或運行中的原因,在轉子旋轉過程中,可能和器壁發生輕微的摩擦和碰擊,簡稱碰摩.聲發射技術在碰摩發生特別是故障早期診斷上有優越性.本系統的特點是沒有沿用傳統的計數、幅度、能量和持續時間等聲發射特性參數,而是在聲發射包絡信號的頻率分析中進行特徵提取.聲發射發生的過程分析和現場試驗都表明這種方法對碰摩檢測很敏感,在碰摩發生的起始階段,包絡譜中與轉速同步的周期性分量顯著增加.根據這種新的設計思想自行研製了buaa碰摩聲發射檢測儀並對此作了介紹分享友人