現有水 的英文怎麼說

中文拼音 [xiànyǒushuǐ]
現有水 英文
property management - utility repairman
  • : Ⅰ名詞1 (現在; 此刻) present; now; current; existing 2 (現款) cash; ready money Ⅱ副詞(臨時; ...
  • : 有副詞[書面語] (表示整數之外再加零數): 30 有 5 thirty-five; 10 有 5年 fifteen years
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 現有 : now available; existing
  1. From russia " judicial reform, the author turn over to think. - judicial reform should be designed and pushed on the base of actual level of country ' s economic and social condition ; judicial reform is bound by a common cause with politics ; reform should not be designed to be a type of misconstructions and instant collapse, concrete reform must be harmonized with the whole judicial reform

    俄羅斯司法改革取得了一定的成效,但與《構想》的預期效果相比仍很大反差,由此對俄羅斯司法改革進行了反思:司法改革應當在國家的經濟和社會生活的現有水平的基礎上設計和推進;司法改革與本國的政治休戚相關;改革不應被設計成破壞性、瞬間崩塌型的;具體改革措施須與司法改革的全局協調一致。
  2. The paper is based on innumerable practical heavy - load road data, deliberate heavy - load standard in detail through theoretical arithmetic, and bring heavy - load standard about cement concrete pavement and asphalt concrete pavement separately ; in the meantime, through a large quantity of cement concrete pavement stress calculation, the paper puts forward relation expression between load on concrete board and stress level under board ; meanwhile, the paper puts forward traffic classification about cement concrete pavement and asphalt concrete pavement ; through bearing board testing on each structure sheaf the paper finds the material modulus gets modified ; through comparing position equivalent rebound modulus to theoretical equivalent rebound modulus, the paper points out limitation of nomograph in course of cement concrete pavement design, whereby, puts forward modifier formulas about theoretical equivalent modulus

    本文以大量的重載道路資料為主,從實際出發,結合理論計算,對重載標準進行了詳細的討論,分別給出了泥混凝土路面與瀝青混凝土路面的重載標準了;同時,通過大量的泥混凝土板底應力計算,推導出了混凝土面板荷載與板底應力平的關系式;給出了泥混凝土路面與瀝青混凝土路面的交通分級;通過對試驗路各結構層進行承載板測試,發材料模量較以前了明顯的提高;對比場實測的當量回彈模量與理論當量回彈模量,指出現有水泥路面設計中的諾謨圖不能完全符合道路材料,從而提出了對理論模量的修正公式。
  3. Existing pumping equipment would require upgrading to cater for the net positive suction head requirements to draw seawater from the lagoons reservoirs

    -現有水泵的功能需要提升,以配合泵正吸壓的要求,從瀉湖蓄庫抽取海
  4. This paper is combined with the project of research of underwater acoustic network technology. first, we study and research existing uan and its protocols at home and abroad

    首先學習、研究了國內外關通信網路及其協議,並對國外現有水聲通信網路進行了較深入的研究和分析。
  5. The old age allowance ( oaa ) rates under the ssa scheme should remain frozen at the current levels until inflation in subsequent years catches up ; and

    繼續凍結高齡津貼在現有水平,直至日後通脹抵銷所上調過高的累積幅度。
  6. Since late february, mercury has been detected twice at cardozo senior high school in the district of columbia, forcing the closing of the building for decontamination

    從今年2月起,美國華盛頓哥倫比亞區的卡多佐高中已經兩次發現有水銀外溢,使該校被迫關閉,以排除污染。
  7. Reviewing the research situation of reservoir - induced earthquake and introducing its characters and cause - condition. 2

    綜合評述了現有水庫誘發地震的研究狀、庫誘發地震的特點、條件和影響因素。
  8. By study on rice direct planting machines existed, the baby rice seedling direct planting machine reformed from rice transplanting machine has a long term potential. it has unique and reasonable design both in eight separable boxes filled baby rice seedling and the sowing needles fixed on sowing wheel. but it still existed some problems of designs and manufactures, for example the machine could not going ahead because of the mud assembled on the boat board, the interference between the sowing needle and the check curtain etc. all this aff

    現有水稻直播種植機械的研究發稻直播種植機械在原稻插秧機的基礎上改造具較大的發展前景,採用的份隔式乳芽箱和撥苗輪的撥針的設計較為獨特,也較為合理,但還存在某些設計和製造問題,如船板的淤泥象,撥針和秧簾的干涉象較為嚴重等,這些都嚴重影響了直播機的工作性能。
  9. Abstract : in this paper, the use and test status quo of internal and external large - sized coordinate measuring system is analyzed briefly and the composition, measuring method and error source are described. according to the internal use status quo and present level, the performance parameter, test method and material reference of the theodolite system suitable for indoor test and site test are proposed. the technical approaches for developments of the indoor large - sized standard and site material reference are given

    文摘:簡要分析了國內外大尺寸坐標測量系統使用和檢測研究狀,敘述了經緯儀測量系統的組成、測量方法和誤差來源,根據我國使用狀和現有水平,提出了經緯儀測量系統性能參數、檢測方法和標準實物,適用於室內檢測和場檢測,給出了室內大尺寸標準研製和場標準實物研製的技術途徑。
  10. Erdos basin is one of the large - scale inland basins shorting water resource in china, hydrological and hydrochemistry data have been accumulated by means of plenty of geologic and hydrological works from 1950s in this region. however, there is a question how to manage and make full use of hydrochemistry data in being and research law of cretaceous hydrochemistry distributing on the base of former introducing advanced technology means, so it is so very important and pressing to master filling, entering and vent rule and entirely bring into play energy of groundwater and make use of groundwater resource that it can promote economic development and environment protection

    鄂爾多斯盆地是我國資源十分短缺的大型內陸盆地之一,自五十年代以來,已開展了大量地質與文地質工作,積累了豐富的文地質資料和化學資料,如何效地管理和充分利用現有水化學資料,運用先進的技術手段,在前人資料的基礎上進行白堊系地下化學分佈規律研究,以利進一步掌握盆地地下補、徑、排規律,充分發揮地下資源的潛力,合理開發利用資源,促進該區社會經濟發展和生態環境保護、治理,是一項非常緊迫且意義重大的工作。
  11. The results of the 2 - year field experiments of reducing chemical n fertilizer application in rice growth and the 1 - year demonstration and extension on a rather of large - area showed that appropriately selecting various ways of reducing chemical n fertilizer application according to different contents of alkali - hydrolysable n in soil could decrease the application amount by 15 % ~ 20 % and maintain the current rice yield per unit area

    摘要通過2年稻化學氮肥減量施用田間試驗及1年較大面積的推廣示範研究,結果表明:崇明常年高氮平下的稻栽培區,降低氮肥用量可以通過土壤高、中、低堿解n含量平,以維持現有水稻單產為原則,針對性地選取減氮途徑進行減量, 2年結果可比習慣施肥減氮15 % ~ 20 % 。
  12. And a systematic analysis is also made on the features of funding for waterway construction and maintenance as well as investment scale and capital structure on waterway transport, port infrastructure and superstructure, and other related areas " construction in pass 10 years. the existing problems and courses within ways of raising funds at present for waterway construction and maintenance has also been pointed out in this paper

    論文首先對我國運建設養護資金的來源進行了研究,系統分析了近10年來我國運建設養護資金來源的特點,以及在航道、港口、上運輸部門、運其它建設方面的投資規模與結構,指出了我國現有水運建設養護資金籌措方面存在的問題和原因。
  13. Phenomena, such as flow field confusion and slagging etc. have occurred in the practical process of cyclone burner for coal - water slurry ( cws ) firing, on this basis a study on aerodynamic field of cws cyclone burners had been carried out through cold state experiments in the laboratory, then the influence of burner ' s structure properties upon the said flow field had been carried out, and expected to find more reasonable structure of the burner was found. in my study the focus is on the affection of cone and cyclone intensity in the condition of infinite and finite fields

    本文著重研究現有水煤漿旋流燃燒器的旋流葉片角度,一次風擴口的長度以及角度對旋流燃燒器出口流場的影響,通過流場的比較,以期得到性能較好的旋流燃燒器。考慮到煤漿燃燒器中心的煤漿射流對于其空氣動力場的影響,本文在實驗室冷態實驗研究的基礎上,模擬煤漿射流,研究其對燃燒器空氣動力場的影響。
  14. The supply of oil can be shut off unexpectedly at any time, and in any case, the oil wells will all run dry in thirty years or so at the present rate of use

    原油的供應隨時會被意處切斷,不管怎樣,以現有水平開采,油井在未來的三十年左右都會枯竭。
  15. Based on analysis of communication modes of automatic hydrological detection and reporting systems at present, the data - collecting software product, in which gsm communication network, the second generation of mobile communication technology, is applied as the communication medium of the hydrological detection and reporting system, is firstly actualized interiorly. its communication mode is gsm short message received or sent

    本文在分析現有水情自動測報系統的通信方式的基礎上,在國內首先開發了利用第二代移動通信技術? ? gsm通信網路作為情自動測報系統的通信媒介,以收發gsm簡訊息的通信方式進行情自動測報的數據採集軟體產品。
  16. Cost comparisons for desalted water are often made to existing water supplies which did not include a full, fair cost - benefit analysis when the were developed

    去鹽的價格比較在於現有水的供給狀況,此種供給並不一定是全部、公平的價格利益分析,當它們還在發展中。
  17. According to the technological process and the using equipment, the project is planned to take advantage of present water, electric, steam and site to establish a producing workshop

    根據工藝流程,結合合作要求,本項目計劃利用現有水電汽,在廠區內建一座生產車間。
  18. The existing analysis method of the exploitation potentiality of water resources has ome serious shortcomings, so it cannot act as the foundation for the exploitation and utilization planning of water resources

    摘要現有水資源開采潛力分析方法存在嚴重缺陷,不能作為資源開發利用規劃的依據。
  19. The goal of policies set out during the period from current water resources management system to water right system is to form the water right system and market without possible breaking of exitsting interests status

    現有水資源管理體系向權體系過渡期間的政策目標是,在盡量不打破利益格局的前提下,形成權制度和權市場。
  20. Yet the real challenge is to focus attention on action - oriented activities and policies that ensure the long - term protection of available water quantity and quality and sustainability of water resources utilization, including sanitation

    不過,真正的挑戰是集中注意麵向行動的活動和政策,以確保長期保護現有水資源的質量和數量,以及包括衛生在內的資源的可持續使用。
分享友人