環境影響報告 的英文怎麼說

中文拼音 [huánjìngyǐngxiǎngbàogào]
環境影響報告 英文
eia
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • : 名詞1 (疆界; 邊界) border; boundary 2 (地方; 區域) place; area; territory 3 (境況; 境地) co...
  • : Ⅰ名詞1 (物體擋住光線后映出的形象) shadow 2 (鏡中、水面等反映出來的物體形象) reflection; image...
  • : Ⅰ動詞1 (告知; 報告) report; declare; announce 2 (回答) reply; respond; reciprocate 3 (答謝)...
  • : 告動詞(由上至下告知) officially announce
  • 環境 : environment; surroundings; circumstances; ambient; closeness; ambience; ambiance; atmosphere
  • 報告 : 1. (告訴) report; make known; inform 2. (講演; 書面申請或總結) report; speech; talk; lecture; advisory
  1. Impacts on the locally rare lesser club - footed bat and short - nosed fruit bat have not been fully addressed either. wbased on the above, we find the subject eia report failing to meet the requirements of the eiao tm and respectfully request the director of environmental protection to consider disapproving the captioned eia report

    基於以上各點,世界自然基金會認為上水至落馬洲支線隧道高架橋方案評估未能符合評估程序的技術備忘錄的要求,故懇請保護署署長否決該申請。
  2. Environmental impact reports are required under many circumstances by federal and state law

    根椐聯邦和州的法律規定,在許多情況下都要求提供環境影響報告書。
  3. The department of planning shall not ratify the design plan descriptions of the construction project until after the environmental impact statement on the construction project is approved

    環境影響報告書經批準后,計劃部門方可批準建設項目設計任務書。
  4. The competent authorities for the examination and approval of construction projects may ratify the feasibility study report or the design plan descriptions of the construction project only after the statement of environmental effect has been approved

    環境影響報告書經批準后,審批建設項目的主管部門方可批準該建設項目的可行性研究或者設計任務書。
  5. Radiation environmental protection reguation guidelines for standard content and format of environmental impact reporta tables for nuclear technology appoication facilities

    輻射保護管理導則.核技術應用項目.環境影響報告書表的內容和格式
  6. Environmental impact statment

    環境影響報告
  7. The plan is awaiting final approval after an environmental impact report

    這個計畫在等待環境影響報告后,做最後的批準。
  8. Specification for formulating enviromental impact statementof thermal power plant construction project

    火電廠建設項目環境影響報告書編制規范
  9. Environmental impact reports are required under many circumtances by federal and state law

    根據聯邦和州的法律規定,在許多情況下都要求提供環境影響報告
  10. Environmental protection regulation guidelines for nuclear facilities. standard format and contat of environmental impact reports for research reactors

    核設施保護管理導則.研究堆環境影響報告書的格式與內容
  11. An environmental impact statement shall contain comments and suggestions of the units and residents in the place where the construction project is located

    環境影響報告書中,應當有該建設項目所在地單位和居民的意見。
  12. The environmental impact statement shall include the comments and suggestions of the units and residents in the place where the construction project is located

    環境影響報告書中,應當有該建設項目所在地單位和居民的意見。
  13. Edited and accomplished the environmental assessment report on wuxi zhongya chemical co. ltd in may 1997. it demonstrated the feasibility of the project and gave a pollution treatment proposal. it passed the examination given by the provincial experts and approval of the provincial environmental protecton bureau. it was the basis of project consturction and produced good consulting effects

    2 、 1997年5月,編審並參加完成無錫中亞化學公司「羅氏中亞(無錫)檸檬酸有限公司檸檬酸和檸檬酸鹽工程環境影響報告書/ ,全面闡述論證了該項目的保可行性,並提出項目污染治理建議方案,通過省級專家評審和省保局批復,已作為該項目建設依據並付諸實施,收到了良好的技術咨詢效果。
  14. The government has organized experts to work out the report on the impact of the three gorges project on the ecology and environment, and countermeasures, and has approved the environmental impact statement of the three gorges project

    中國政府組織有關專家完成了《長江三峽工程生態與及對策的論證》 ,批準了《三峽工程環境影響報告書》 。
  15. Article 19 when the construction of a railway, highway or a water project is carried out, a mining or electrical power enterprise or any other large or medium - sized industria1 ; enterprise is established in a mountainous, hilly or sandstorm area, the environmental impact statement for the project must include a water and soil conservation programme approved by the department of water administration

    第十九條在山區、丘陵區、風沙區修建鐵路、公路、水工程,開辦礦山企業、電力企業和其他大中型工業企業,在建設項目環境影響報告書中,必須有水行政主管部門同意的水土保持方案。
  16. Article 61 if a construction project is put into production or operation while its supporting installations required for the prevention and control of environmental pollution by solid waste have not been completed or have not passed examination, the competent administrative department of environmental protection that examined and approved the statement of the effect on the environment to be occasioned by the the construction project shall order suspension of production or operation and may also impose a penalty of not more than 100, 000 yuan

    第六十一條建設項目中需要配套建設的固體廢物污染防治設施未建成或者未經驗收合格即投入生產或者使用的,由審批該建設項目的環境影響報告書的保護行政主管部門責令停止生產或者使用,可以並處十萬元以下的罰款。
  17. Environmental protection regulation guidelines for nuclear facilities. standard format and content of environmental impact reports for shallow ground disposal of solid radioactive waste

    核設施保護管理導則.放射性固體廢物淺地層處置環境影響報告書的格式與內容
  18. In the event of construction projects being commissioned or put to use with their anti - air pollution installations not having met state requirements over environmental protection management, such construction projects shall be ordered to cause from production or usage by the environmental protection authorities that undertook to examine and approve their environmental impact reports, and may also be subjected to a penalty of between two thousand yuan and twenty thousand yuan

    二)建設項目的大氣污染防治設施沒有達到國家有關建設項目保護管理規定的要求,投入生產或者使用的,由審批該建設項目環境影響報告書的保護部門責令停止生產或者使用,可以並處二千元以上二萬元以下罰款。
  19. Before a construction project is put into production or use, its facilities for prevention and control of environmental noise pollution must be inspected by the competent administrative department for environmental protection that originally approved the environmental impact statement ; if such facilities fail to meet the requirements of the state, the construction project may not be put into production or use

    建設項目在投入生產或者使用之前,其噪聲污染防治設施必須經原審批環境影響報告書的保護行政主管部門驗收;達不到國家規定要求的,該建設項目不得投入生產或者使用。
  20. Article 13 the necessary supporting installations for the prevention and control of environmental pollution by solid waste specified in the statement of the effect of the construction project must be designed, built and put into operation simultaneously with the main part of the project

    第十三條建設項目的環境影響報告書確定需要配套建設的固體廢物污染防治設施,必須與主體工程同時設計、同時施工、同時投產使用。
分享友人