環形壩 的英文怎麼說

中文拼音 [huánxíng]
環形壩 英文
ring dam
  • : Ⅰ名詞1 (環子) ring; hoop 2 (環節) link 3 (姓氏) a surname Ⅱ動詞(圍繞) surround; encircle;...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 環形 : annular; ringlike; ring form; bight; annularity環形癌 annular carcinoma; 環形電路 [訊] loop circu...
  1. Past investigation found the rock in the right dam foundation composing of granite ( _ 4 ~ 3 _ 5 ~ 1 ) in dyas - trias, which has a very complicated mechanical environment. the complicated phenomenon is as follows : tectonism, alteration, rock mass demobilize, rock mass stress release and other factors. because of this several weakness rock zones and a loosen rock mass zone are develop in the right dam foundation

    前期的調查表明其右岸巖體力學境復雜,表現為:構成右岸基(肩)巖體主體的二迭三迭紀花崗巖( _ 4 ~ 3 _ 5 ~ 1 )受構造變動、蝕變、風化卸荷等因素的影響成了基軟弱巖帶和肩上部卸荷鬆弛巖體。
  2. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑坡、泥石流引起的堆積物和冰川作用成的冰磧物堵塞河道,再加上構造運動造成地殼的不均勻抬升,九寨溝的這種獨特的地質境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終成灰華堤,使湖泊的成成為可能。
  3. In the program, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress are considered. and such temperature control measurement as water pipe cooling, heat preservation of the dam surface, the pouring temperature control, the overflow across the dam top during flood season can also be simulated by numerical method

    該程序在編制過程中考慮了混凝土分層澆築、施工間歇、彈模變化、絕熱溫升過程、境溫度的變化、混凝土徐變、自生體積變等因素對體溫度場及溫度應力場的影響,同時也考慮了水管冷卻、體表面保溫、控制澆築溫度、施工汛期頂面過水等各種溫控措施的數值模擬。
  4. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對拱施工期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為系統的研究了混凝土拱施工期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土拱施工過程,考慮了混凝土分層澆築、施工間隙時間、彈模變化、絕熱溫升過程、境溫度的變化、混凝土徐變、自生體積變等因素對體溫度應力的影響。
  5. This article described the deformation features of taojiaba landslide and analyzed the inner factors, geologic setting, topography, morphology, stratum, lithology and texture, and the external influence factors, precipitation, flood, human activity, neotectonic activity and earthquake, and the transform features of landslide in the near future, and evaluate stability of landslide through the section coefficient method calculation on basis for landslide mechanism analysis and control work

    摘要陶家滑坡基本特徵顯示,滑坡變的主要影響因素有:地質境因素(地地貌、地層巖性、物質結構) 、外界影響因素(降水因素、洪水因素、人為因素、新構造及地震) ,以及滑坡近期變特徵,通過剖面遞推系數法計算,對滑坡的穩定性進行了評價,為滑坡機制分析和優化整治措施提供依據。
  6. In order to ascertain stress behavior of steel lined reinforced concrete pipe accurately, according to the fundamental principle of non - linear computation of reinforced concrete elements, the steel lined reinforced concrete penstock on downstream dam surface in a hydropower station is calculated and analyzed, and the distribution of circumferential stress of the steel lined reinforced concrete pipe is obtained, it proves that it is safe and reasonable to use structures of steel lined reinforced concrete penstock in hydroelectric station construction, and can satisfy the requirement of project

    摘要為了能夠準確地把握鋼襯鋼筋混凝土管的受力性能,根據鋼筋混凝土單元非線性計算的基本原理,對某水電站鋼襯鋼筋混凝土後背管進行了計算分析,得出了鋼襯鋼筋混凝土管向應力的分佈情況,分佈情況說明了此水電站採用鋼襯鋼筋混凝土後背管的結構式是安全合理的,可以滿足工程要求。
  7. The research of system makes the observational information of tongbo dam realize standardization manage, tidy up and analyze the information quickly and exact, give the environmental physics number and diagnostic numer of displacement, stress and seepage, build the mathematical model of each observational information, evaluate the working modality of the dam, thereby ensure safe working of the dam

    系統的研製使桐柏抽水蓄能電站的觀測資料實現規范化管理,快速、準確地整理、分析觀測數據,給出境物理量及位移、應力和滲流等觀測效應量的特徵值,建立各觀測效應量的數學模型,分析評估大的工作態,從而保證大的安全運行。
  8. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建工程荷載條件下河谷巖體力學境分析及右岸古滑坡體的穩定問題分析得出:建后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大建成后逐漸蓄水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及體總體上仍處于穩定狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,體將在滑坡體下滑推力的作用下產生破壞;建后水平推力對右岸古滑坡體穩定性的影響分析可以看出,在最危險的工況條件下,體及滑坡體也將處于臨界狀態;在長期滲透變的作用下,由於滑帶的物理力學參數的降低而有可能導致體失穩破壞。
  9. The aim of this dissertation is to shed some light on these subjects. first, systematic experimental study and theoretical analysis have been performed to study the damage of concrete due to loading history. in addition, an artificial neural network approach is developed to study the constitutive relations of materials, and some constitutive models of concrete under various loading history have been established

    本文針對目前大設計和研究中混凝土材料損傷及本構特性這個薄弱節,在深入分析國內外有關成果的基礎上,從理論和試驗兩個方面對混凝土材料經歷過荷載歷史后的損傷特性進行了深入的研究;同時,將人工神經網路技術應用到混凝土本構領域,建立了一系列在各種加載式下的混凝土材料模型。
  10. Industrial ethernet network of the computer monitoring and control system for ship lift of gaobazhou water control project is made up of a and b double redundancy ring optical fiber networks with better reliability and flexibility

    摘要高洲升船機計算機監控系統工業以太網由a 、 b雙冗餘光纖網路組成,具有較高的通信可靠性和靈活性。
  11. The new city of zigui county, which lies near three gorges dam in mountainous terrain, is one of the important urban areas in three gorges reservoir region and was granted with the demonstration award of china human settlement at march 1, 2003

    秭歸新城是三峽庫區重要的移民城市之一,位於三峽庫區庫首,地復雜,與三峽大遙遙相對, 2003年3月1日獲國家建設部授予的中國人居境範例獎,是三峽庫區具有代表性的典型山地城市之一。
  12. Not only can the experimental project im prove the local environment and take the important action for developing the economy of bashang, but also it root out the increasingly worsening sand blow, protect the safe cities, enrich and purify the resource of water and take the important meaning for improving the quality of air in the beijing

    為此,國家退耕還林試點工程連續兩年安排在河北省上六縣。示範工程不但對于改善當地境、振興上經濟起著舉足輕重的作用,而且對根除北京日益嚴重的沙塵天氣、保護城市安全、維護首都象、豐富和凈化水源、提高北京空氣質量也具有極其重要的戰略意義。
  13. The formation of the scoured pits is related with such factors as the unstable flow velocity and the unstable flow state caused by the circumfluence in the cross direction, the upstream circumfluence and the circle flow around the embankment

    沖刷坑的成與橫向流、上游迴流和繞流丁造成流速及流態不均勻等因素有關;根石走失與根石在水中的穩定性和河床性質及腳附近沖坑有關。
分享友人