疏水口 的英文怎麼說

中文拼音 [shūshuǐkǒu]
疏水口 英文
drain port
  • : Ⅰ動詞1 (疏通) dredge (a river etc )2 (疏忽) neglect 3 (分散; 使從密變稀) disperse; scatte...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  1. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小浚挖槽的回淤量,必須依靠控制上游來沙量、調整入門位置、加設防淤堤及提高庫位等手段,而不能通過調整挖泥槽寬度、位置及數量等措施來達到目的。
  2. Correspondingly, its theory is up to developed to a higher level. in this thesis, taking the risk management activities of the two parties of insurance as the perceptive and the process of engineering insurance as the clue, the establishment of risk management system is analyzed during the process of risk identification and evaluation, insurance contract arrangement, disaster prevention and loss reduction, and the compensation management. furthermore

    本文在查閱大量文獻的基礎上,對浚泥泵及排泥管道的動態特性現象進行了分析,並應用面向對象的c + +語言開發了比較通用的計算機程序,對緊急關閥、下挖掘機具(如絞刀、斗輪等)吸泥堵塞以及事故拋泵等典型的動態工況特性進行了計算和分析。
  3. This paper summarize the estuary sediment management methods also, analyze and the following aspects and give evaluations : estuary dredging and lead the flow, lead water to scour the river channel, build the xihekou reservoir, estuary gate deposition management, dike reinforced etc

    本文還對河泥沙的處理途徑和措施進行了概括總結,對河浚與導流、引海沖刷河道、建設西河利樞紐、攔門沙治理、人工有計劃改道和出漢、加高堤防和加固防護工程和挖河固堤工程等進行了分析評價。
  4. The final conclusion includes that, 1. the common characteristics of the developments of inner waterway container transportation in many renowned international container ports is that starting with inner waterway construction projects and opening inner waterway containers ? commuting passage at the meantime, those ports have undertaken the same guideline of emphasizing on road, railway and waterway transportation equally. especially for river port or delta ports, the inner waterway container transportation is critical for the development of key container center

    本論文得出的研究結論有: 1 、世界上著名的國際集裝箱大港的內河集裝箱集運系統的發展特點是:以內河航道整治為領先、同步建設與開通內河集裝箱集運通道,實行公、鐵、(內河)集運並重的建設方針,特別對內河港和河港來說,內河集裝箱運輸是集裝箱大港發展的至關重要的集運方式。
  5. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖區的洪組成、流泥沙演變、河道湖泊系分佈特點以及河道湖泊浚工程布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維力學計算模型預測浚工程實施后的位、流量、流速流場變化,為河道、航道港整治、河道浚清淤等工程決策與實施提供了可靠理論依據。
  6. After researching the part thermal equipments and systems include heaters, steam leakage and receiving systems, low pressure drain system etc, and computing the efficiency of the systems, find out the better choice of the imported assemblies than the domestic assemblies in parameter and the disfigurements in design and making. based on the above, point out the measure to progress them. according to the analysis, we can get some measures to increase the economical level of the systems and save more energy

    對局部熱力設備及熱力系統進行分析研究,包括:加熱器設備、漏汽及回收系統、低加系統、主、再熱蒸汽系統以及凝汽器等部位;並計算汽輪機本體高、中、低壓缸效率,藉此著重對汽輪機通流部分進行了剖析,找出國外進機組動、靜葉柵、葉型的選擇比國產機組先進性以及國產機組在通流部分設計和製造中的諸多缺陷,並且指出了改進的方向,為機組提高熱經濟性、節能降耗奠定了理論基礎。
  7. Haitong terminal , with 219. 4m berth length and 13. 2m water depth , enjoys good port facilities and transportation advantages , and could receive ro - ro vessels of various kinds

    海通碼頭泊位長219 . 4米,前沿深13 . 2米,具有得天獨厚的港設施和良好的集運環境,適合各類滾裝船隻靠泊。
  8. An experimental research on notching wet beach of the yellow river with the short - delay blasting is made for eliminating the risk that the main river channel is often threatened by some horizontal and slanting streams occurred on the downstream of the river and solving the problems from the bend cut - off for river channel harnessing, water way dredging and the siltation of the water diversion outlets along the channel

    摘要為了利用爆破解決黃河下遊河道經常出現的橫河和料河威脅河道安全的險情以及河道整治中的裁彎取直、浚航道和河道引淤積的問題,在黃河濕灘上進行了微差爆破開槽試驗研究。
  9. In a situation that this imported product demand will also be improved further in the following several years, must optimize system this purchase, transport, load and unload, store, dredge competence of link of transporting etc., introduce the advanced idea and method on the materials supplies of expressway construction abroad, adopting more advanced modern material flow thought on the software, the pitch is provided and deliver to constructing ; develop performance excellent keeping the tank wagon warm with low costs on the hardware ; supply the barge special - purpose and in bulkly ; the special - purpose pitch shipping dock stores pot, etc. to equip, thus propose that the transport way in which our country imports the pitch is chosen, and use the economic technological demonstration method to carry on the demonstration of economic technology to these ways, therefore get our country out of and impor t the imagination of transporting way reform of pitch, propose and purchase and concentrate on and melt, transport in bulk to take the whole province or the whole country this supply platform and accord with international advanced transport suggestion of technology in unison

    在未來幾年這一進產品需求量還將進一步提高的情況下,必須優化這一體系在采購、運輸、裝卸、貯存、運等環節的平,引進國外在高速公路建設的原材料供應上的先進思想和做法,軟體上採用較先進的現代物流思想,對施工瀝青進行配送;硬體上研製成本低、性能優的保溫槽車;專用散裝供應駁船;專用瀝青裝卸碼頭貯罐等裝備,從而提出我國進瀝青的運輸方式選擇,並運用經濟技術論證方法來對這些方式進行經濟技術方面的論證,由此提出我國進瀝青運輸方式改革的設想,提出采購集中化、運輸散裝化這一全省或全國統一供應平臺且符合國際先進運輸技術的建議。
  10. The adequate rainfall and sparse population permitted americans to use water and to pollute water with abandon.

    充足的雨量和稀的人使美國人能夠隨意用和隨意將弄污。
  11. Sparedescription : tendency of deposition in the guanting reservoir and dredging on mouth bar of the guishuihe estuary are analyzed by the data from the model experiments

    描述:在實體模型試驗的基礎上,對官廳庫的泥沙淤積發展和媯攔門沙的清淤浚措施進行了研究。
  12. Based on the back silting analyses of the sandbar - dotted waterway in the oujiang river estuary after three times dredging, reasons for back silting in the waterway are presented considering influences of flow dynamics, waves and salinity distribution on sediment concentration

    摘要通過對甌江攔門沙航道3次浚后的回淤分析,以及從甌江流動力條件、風浪、鹽度分佈對含沙量影響等的初步分析,得出了攔門沙航道回淤的原因。
  13. This paper outlines the design and construction conditions of the yangtze estuary deepwater channel regulation project, describes the comparison and selection of the design schemes for the 1st & 2nd phase projects, and expounds the construction organization and administration, the core of which is dynamic management

    摘要全面介紹長江航道治理工程整治建築物工程和浚工程的設計條件和施工條件,並在此基礎上介紹一、二期工程設計方案的優選情況,以及工程實施過程中以動態管理為主要內容的施工組織管理情況。
  14. The pocket accommodating the aromatic ring of phenylalanine is formed predominantly by hydrophobic side - chains, including those of ile10, ile13, prol50, leul75, leul79, phe209, ser211 and val221 ; whilst the amino group and carboxylate group of phenylalanine is coordinated by asp6, asp7, gln151 and ser180. the n - terminal region is found to be important to the function of arog. point mutation reveals that residue substitution of ilelo to ala10 leads to desensitization in the presence of 1 mm phenylalanine, simultaneously, exhibits a dramatic decrease in enzymatic activity

    綜合前人的研究和本研究工作的實驗數據,得出以下結論: 1 )在arog的反饋抑制位點供苯丙氨酸結合的疏水口袋由asp6 、 asp7 、 ile10 、 ile13 、 pro150 、 gln151 、 leu175 、 leu179 、 ser180 、 phe209 、 ser211和val221等12個氨基酸殘基構成; 2 )苯丙氨酸結合的疏水口袋分為兩個區域,與苯丙氨酸的苯環發生作用的區域由ile10 、 ile13 、 pro150 、 leu175 、 leu179 、 phe209和val221的側鏈構成,而asp6 、 asp7 、 gln151和ser180的側鏈構成了與苯丙氨酸的氨基和羧基相互作用的區域。
  15. With continuous maintenance and improvements, the government could also supply water to areas less densely populated, and districts further afield, such as chai wan, ap lei chau and stanley. by the 1930 s, with the completion of various major reservoirs, the water supply network had reached a satisfactory standard. in the early half of the 20th century, the government decided to develop the kowloon peninsula, in order to ease the pressure from the increasing population

    一些人較稀,地處偏遠的地區如柴灣、鴨利洲、赤柱等地,也因多個大型塘的落成,紛紛於二十世紀上半期獲得自來的供應,港島的供網路,大抵於二十世紀三十年代,自香港仔塘建成后,發展得相當完善。
  16. Back pressure of steam trap

    蒸汽系統器出外凝結的壓力
  17. Through static emulating calculation of the high - pressure heater, the influence of high - pressure heater leakage upon its operation paeameters, such as outlet temperature of the feed - water, pressure loss of the steam extraction pipeline, and temperature of the drain, has been analysed

    摘要通過對高壓加熱器的靜態模擬計算,分析了高壓加熱器?漏對其運行參數,如給溫度、抽汽管道壓損、溫度的影響。
  18. A trailing suction hopper dredger is one of the most popular dredging tools for regulation of waterway and harbors. it is a large self - propelled and self loaded dredger which can be used in wide water area such as an estuary or a river mouth. it is adaptive economical, it is widely used in large dredging projects in most countries in the world

    耙吸式挖泥船是最常用的清理河道港浚工具之一,它是力式挖泥船中大型自航、自載式挖泥船,適用於域開闊的海灣、河,具有廣泛的適用性和經濟性,為世界上各個國家在較大的浚工程中廣泛採用。
  19. But currently a huge amount of sediment deposited there has caused severe problems and need to be dredged. dredging is one of the effective engineering measures to control floods and improve navigation, irrigation conditions and environment

    但是,目前這些河流、湖泊、庫和港的泥沙淤積嚴重,需要進行清淤浚,以提高防洪、灌溉、通航能力,改善生態環境。
  20. The new exit will be opened for public use when the contra flow scheme is implemented at lo wu leading passengers to the departure hall and then proceed to the arrival hall for departure formalities

    當羅湖車站實施潮式運作以導人潮時,三號月臺的新出亦會同時開放,讓部分乘客可由此通道直接通往出境大堂,然後前往上層入境大堂辦理出境手續。
分享友人