目標控制項 的英文怎麼說

中文拼音 [biāokòngzhìxiàng]
目標控制項 英文
destination control
  • : Ⅰ名詞1 (眼睛) eye 2 (大項中再分的小項) item 3 [生物學] (把同一綱的生物按彼此相似的特徵分為幾...
  • : Ⅰ名詞1 [書面語] (樹梢) treetop; the tip of a tree2 (枝節或表面) symptom; outside appearance; ...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • 目標 : 1. (對象) target; objective 2. (目的) goal; aim; destination
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. If the control is a valid drop target, the

    如果該是有效的放置,則
  2. It then checks to see if the control is a valid drop target

    然後它將檢查該是否是有效的放置
  3. To be valid drop targets, controls must be capable of displaying the underlying data type of the item dragged onto it from the data sources window

    必須能顯示從「數據源」窗口拖放的的基礎數據類型才能成為有效的拖放
  4. The drop - down list of associated controls in the data sources window is only available when a valid drop target such as a form is the active window

    僅當活動窗口為有效的放置(如窗體)時「數據源」窗口中的關聯下拉列表才可用。
  5. The result shows that, in condition of fixed price contract, coordination incentive of multi - objects can not only actualize pareto improvement of the two contracting sides and prevent moral hazard of the contractor, but also can promote the contractor to improve its efforts and to allocate its resources rationally in multi - objects so as to realize coordination equilibrium improvement among the multi - objects through providing a balanced incentive combination

    結果表明,在固定總價合同下,從多角度實施協調激勵,不僅可以實現雙方收益的帕累托改善,防範承包商的道德風險;而且通過提供均衡的激勵組合策略,可以使得承包商在多上提高併合理分配自己的努力水平或資源,從而實現之間的協調均衡改善。
  6. The paper studied the management method reformation of construction enterprises in the choosing of organization form and the three major target management ( quality, progress and cost ) innovation and technical improvement. this paper also brought up the principle for choosing the form of organization mechanism ; analyzes the factors which affects the construction quality, progress and cost. based on this, it proposed a new method for full quality management and whole course dynamic progress managing as well as cost managing

    論文重點研究了工程管理在組織機構選擇和三大(質量、進度和成本)方面的管理方法改革和技術措施改進;給出了施工企業選擇管理組織機構的原則;對影響施工質量、進度及成本的因素進行了分析,在此基礎上,針對施工企業管理中存在的問題,提出了全面質量管理、全過程動態進度管理和成本管理的新方法。
  7. If the target control is disabled, or if the focus is removed from the target control in a

    如果禁用了目標控制項,或將焦點移離
  8. This thesis systemically researched construction project management with theory and way of system engineering. this thesis was based on the basic concept, basic character, main content of construction project management and mainly analyzed main question and reason of construction management. according to the total process of construction project management, it systemically researched and discussed the biding, setting up project office, project planning, object controlling ( including schedule, quality, safety and cost of controlling ), and it researched how to strengthen element management, contract management, information management, site management, organization coordinating, construction final accounts for realizing object of project management

    根據施工管理必須經歷的過程,分別對管理過程中的承攬任務、組建經理部、管理規劃、(施工進度、質量、安全、成本的) ,以及為實現管理必須加強的要素管理、合同管理、信息管理、現場管理、組織協調和運行機等作了系統的分析和研究,並通過案例進行論證。
  9. Property does not have a value, the

    屬性中輸入的目標控制項沒有值,則
  10. With the advent of mass customization, destinies of manufacturers are directly depended on the designing of their products, design for mass customization ( dfmc ) technologies have been listed the first priority of research focuses. based on the national high tech. research programme ( 863 programme ) - " the research of dfmc for informationalized electrical application ", this paper develops a dfmc system using network virtual reality, discusses human - computer interaction ( hci ) topics including virtual navigation, collision avoidance, target control, dimention dfmc, and appereance dfmc, as well as file interfaces and data extension

    論文依據國家高技術研究發展計劃( 863計劃) a類? ? 「面向信息家電的三維數字化定製設計關鍵技術研究」 ,開發出一套基於網路虛擬現實的定製設計軟體平臺,在此基礎上重點研究了包括虛擬漫遊、碰撞預防、、尺寸和色彩定製設計在內的人機交互問題,並介紹了系統的文件介面和數據組織。
  11. In this thesis, study on engineering project administration method reform, applying scientific administration and engineering specialty theory knowledge under the guidance of modern project administration theory and strategy, a useful investigation and research on engineering project administration method reform is set off. the analysis and research is mainly focused on organizational structure guarantee as well as administrative method reform and technical measure improving for three great goal ( quality, cost and progress ) control in engineering project administration. the organizational structure selection scheme which aims to geo - engineering project administration as well as systematic and whole progress administration theory method and technical way of engineering project quality, cost, progress is presented

    《工程管理方法改革研究》一文在現代管理理論和方法的指導下,運用科學管理與工程專業理論知識,對工程管理方法改革展開了有益的探索和研究,著重分析研究工程管理在組織機構保障方面及三大(質量、成本和進度)方面的管理方法改革和技術措施改進,提出了適宜於地學工程管理的組織結構選擇方案和工程質量、成本和進度的系統化全過程管理理論方法和技術途徑。
  12. If the user leaves the targeted control blank, it passes the custom validation test

    如果用戶將目標控制項保留為空,則將通過自定義驗證測試。
  13. Class with the specified target control and argument data

    用指定的目標控制項和參數數據初始化
  14. True if the postback event should return the page to the current scroll position and return focus to the target control ; otherwise,

    如果回發事件應將頁返回到當前的滾動位置並將焦點返回到目標控制項,則為
  15. In each case, the data is copied from the source control in the left column and pasted into the destination control in the right column

    每種情況下都是從左列的源數據並粘貼到右列的目標控制項中。
  16. Control that allows the user to change the

    ,用戶通過它可以更改目標控制項
  17. Gets the control target that receives the postback event

    獲取接收回發事件的目標控制項
  18. Property cannot be converted to the appropriate data type,

    屬性中的目標控制項值無法轉換為適當的數據類型,則
  19. Property cannot be converted to the appropriate data type, then

    屬性中的目標控制項值無法轉換為適當的數據類型,則
  20. First of all, this thesis analyzes current situations of chinese project management and problems in existence, along with basic methods and problems of the project objective control

    論文首先分析我國管理的現狀和存在的問題以及的基本方法和存在的問題。
分享友人