石過梁 的英文怎麼說

中文拼音 [dànguòliáng]
石過梁 英文
lintel stone
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  1. Specification for ancillary components for masonry - lintels

    附屬元件規范.門窗
  2. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎頂面平擱簡支、柱架榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實驗研究: (一)通木柱礎靜摩擦試驗,測定了柱腳與礎古鏡面間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通單柱承載力試驗,測定了古建築中木柱的受力變形特徵、破壞模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通柱架低周反復荷載試驗,測定了柱架的抗側移剛度、柱架恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱架及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通斗?低周反復荷載試驗和受壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通式殿堂間架模型振動臺試驗,測定了殿堂木構架結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  3. I wandered, on a moonlight night, through the grass - grown enclosure within : here i stumbled over a marble hearth, and there over a fallen fragment of cornice

    在一個月光如水的夜晚,我漫步穿裏面雜草叢生的圍場。一會兒這里絆著了大理火爐,一會兒那裡碰到了倒地的斷
  4. The quiescence of the never really blossomed love between chang chang chen and hua gong li is elaborated by their seemingly closed yet distant dialogues and interaction. apart from the " handjob " in the beginning, chang and hua never really approach each other further, the most chang does is merely playing with the " qipau " chinese dress of hua in his little seaming room. in this scene, wong kar wai accurately and convincingly visualizes the repressed mind of the character who is engaging in a forbidden affair

    小張和華小姐盡管藕斷絲連但除了最初的手外兩人皆沒有進一步的親密身體接觸小張苦戀著華最親密的動作只不是把玩她的衣服這種對于愛欲和感情的壓抑可以算是繼花樣年華內朝偉把心事寄託于洞后最成功又最令人感傷的一次情感發泄也是整部愛神中最教人動容的一幕。
  5. In this thesis, we set our background in lishui bridge over shigui mountain in changsde, hunan province. through life circle cost program, the cost perdition of bridge structure in its life circle and its maintenance optimization can be demonstrated vividly

    本文以湖南常德龜山澧水大橋為工程背景,通壽命周期成本程序,清晰地反映出橋結構在其預期的壽命周期中的一系列成本預測和最優化維護安排。
  6. We crossed the marble courtyard, walked up the steps with their carved dragons coiling in the middle, into an entrance hall, with painted beams and intricate painted ceiling, red lacquered pillars, huge lamps

    我們穿大理庭院,走上正中雕有蟠龍的臺階,來到前廳,看見精緻的雕畫棟,丹漆柱子,還有高高大大的燈臺。
  7. Methods of test for ancillary components for masonry - part 11 : determination of dimensions and bow of lintels ; german version en 846 - 11 : 2000

    工程輔助元部件試驗方法.第11部分:門窗尺寸
  8. Through a real project - - - - - - " b " bid section of shijiazhuang south bridge. it is proved that high - low brace gantry crane wide double guiding girder method is a good and new technique of bridge construction

    實際工程(家莊南環大橋b標段)的施工實踐驗證,證明高低支腿龍門吊寬幅雙導法是一種優良的橋工程施工新技術。
  9. Speaking at a ceremony to mark the completion of works on the main drainage channels for river indus, river beas and river sutlej, the director of territory development, mr wong hung - kin, said today ( september 17 ) that the works for these three rivers in the river indus basin were sizable and entailed the straightening and widening of some 9km of existing meandering rivers with raised river embankments. the works also included the re - provisioning of existing facilities that were affected by the projects such as the reconstruction of 12 river - crossing bridges

    拓展署署長黃鴻堅今日(九月十七日)在梧桐河、雙魚河及上河主要排水道工程竣工典禮上致辭時表示,整項梧桐河盆地的治河工程涉及上述三條位於新界北區的主要河道,規模龐大,新河道總長約9公里,將原來迂迴曲折的河道拉直及擴闊,並且將河堤加高及重置受工程影響的原有設施,包括12條河橋
  10. With the steps of reformation and opening up, having experienced rains and winds of over ten years, nowadays the company has become a comprehensive garden sculpture company integrating stone carving, stone inscription, sculpture of stainless steel, rockery, fountain, pavilion and green of corridor park

    東磊園林雕塑工程有限公司,位於中國雕刻之鄉山東省莒南縣,公司始建於90年代初,伴隨著改革的步伐走了十多年的風雨歷程,昔日小樹終成棟。如今已發展成集刻金屬不銹鋼雕塑假山噴泉涼亭長廓園林綠化為一體的綜合性園林雕塑公司。
  11. Be it known unto the king, that we went into the province of judea, to the house of the great god, which is builded with great stones, and timber is laid in the walls, and this work goeth fast on, and prospereth in their hands

    奏知大王:我們去這猶大省,到了偉大神的殿,見殿正用光滑塊修建,木插入墻內;這工程進行審慎而迅速。
  12. This subject directly investigates 14 construction enterprises and more than 40 construction sites. the types of the projects involve railway, bridges, tunnel, municipal, road, industry and civil construction, airport runway, hydraulic tunnel and others. this paper deeply analyzes and assesses the occupational health and safety management actuality of the construction site, points out the main problems in the process of hazard identification, risk assessment and risk control, and also analyzes why these problems exist

    該課題研究直接調查了十四家施工企業和四十多個項目施工現場,項目類型涉及鐵路工程、市政公用工程、公路工程、房屋建築工程、機場場道工程、橋工程、水工隧洞工程、土方工程等,對施工現場實際的職業健康安全管理現狀進行深入的分析、評估,指出了危險源辨識、風險評價、風險控制程存在的主要問題,並分析了為什麼會存在這樣的問題。
  13. Methods of tests for ancillary components for masonry - part 9 : determination of flexural resistance and shear resistance of lintels ; german version en 846 - 9 : 2000

    工程輔助元部件試驗方法.第9部分:門窗抗彎曲
分享友人