破損穩度 的英文怎麼說

中文拼音 [sǔnwěn]
破損穩度 英文
damage stability
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : Ⅰ動詞1 (減少) decrease; lose 2 (損害) harm; damage 3 [方言] (用尖刻的話挖苦人) speak sarcas...
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 破損 : damaged; worn; torn; damage; failure; breakage
  1. By surveying the sample plot, the relations between the stabil ity of the mountai n slope of soil preparation for planting by using explosion and other factors s uch as precipitation, terrain , were studied. by using the method of quantitative t heory i, the interrelation between the damaged degrees of soil preparation progra ms by using explosion in low mountain area with abundant precipitation and terrain factors was systematically analysed, and the mathematical models relate d were developed. the results show that the precipitation in early days and the m aximum precipitation per day are the primary factors causing the soil prepara tion program damaged. the main terrain factors of the mountain slope that affect the program stability are according to their importance, slope, position and dir ection. the suitable mountain slope for soil preparation by using explosion is th e slope of less than 25

    通過典型標準樣地調查資料,探討了造林爆整地工程的坡地定性與降水、地形等因子的相互關系,應用數量化理論,對在有充分降水條件下的低山丘陵區的爆整地工程失程與地形因子之間的關系進行了系統分析,並建立了相應的數學模型,研究指出,充分的前期降水和日最大降雨量是引起爆整地工程失的激發因素;影響爆整地工程定性的主要地形因子是地面坡,其次為坡位、坡向,實施爆整地工程的地面坡以不超過25為宜。
  2. The acceleration time process of road surface plainness is got by using two integral calculus of the acceleration time process which is measured by five - wheel equipments. this data is worked as the input of the road surface for theoretical calculation. the result of experiments mostly fits that of calculation, and then the multiple - acceleration power spectrum distribution of the artillery and tractor are acquired

    在瀝青路面、鋪磚路和砂石路面上以不同速進行了平隨機激勵牽引試驗,用五輪儀測量得到的加速時間歷程進行兩次積分的方法得到路面不平的時間歷程做為路面輸入進行對應的理論計算,試驗結果和計算結果基本相符,得到了火炮和牽引車多個加速功率譜分佈。
  3. In the relently twenty years, in pace with the high development of highway and hydroelectric power station, being inevitable decompose to terrain and landforms, decomposed slope s steady and impelled into being and developing of landslip. thereby giving project security to bring the grave effect, condition the projects rate of aduance, ading the project invests, at the same time also probably creates great wealth loss and the personal safety

    近二十年來,隨著高等級公路和大型水電站事業的迅速發展,不可避免地對邊坡地形地貌產生壞,給邊坡定性造成潛在威脅,有的甚至產生滑坡,從而給工程安全性帶來了嚴重影響,制約了工程進,增加了工程投資,同時也可能造成重大的人身安全和財產失。
  4. Three numerical simulations have showed that the gabp has a better stability, precision and robustness than the traditional bp neural network, and is the reliable and accurate methods in structural damage detection

    對比遺傳bp網路與傳統bp網路對三個模擬算例的識別結果,遺傳bp網路的定性更好,精更高,對噪聲有很強的魯棒性,是一種準確有效的結構診斷方法。
分享友人