破碎帶地下水 的英文怎麼說

中文拼音 [suìdàidexiàshuǐ]
破碎帶地下水 英文
fracture groundwater
  • : Ⅰ動詞1 (完整的東西受到損傷) be broken; be damaged 2 (使損壞) break; break down; damage 3 (使...
  • : 動詞[書面語] (觸; 撞) strike; bump
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 破碎 : 1. (破成碎塊的; 零碎的) tattered; broken 2. (使破成碎塊) smash [break] sth. to pieces; crush
  1. 6 diversity fragmentation and evenness of ecological landscape in fukang increase with more utilization and development. the change of landscape pattern about land utilization is mainly area variation of plantation and wasteland in pluvial fan and alluvial plain, the key influence factors are the dynamic of soil moisture and salinity under the development of water and land resource

    6 、在阜康各景觀中,隨人為開發利用程度的增強,景觀多樣性、度和均勻性增加;荒漠綠洲土利用景觀生態格局的變化,集中體現在位於洪積扇與沖積平原的耕和荒面積變動上,關鍵影響因子是土資源利用的土壤鹽動態變化。
  2. Alkali basite, which came from upper mantle or lower crust, invaded through those structure, which not only bring cu et al mineralizing elements, but also the most important is that thermal energy. it cycled the formation water ( yinmin fonnation and luoxue formation ), and form alkali - rich, middle - high temperature and salinity fluid mixed with alkali - rich magmatic water. there were high rate of percolation and well voidage in the contact zone between yinmin purple stratum and yinmin rubblerocks, which is in favor of the transposition and mineralization of minerogenetic fluids

    因此,總結東川稀礦山式銅礦成礦模式為沉積( fe 、 cu ) ?熱液疊加( cu )改造:晉寧-澄江期,小江深大斷裂發生走滑運動,在東川礦區造成右行旋扭及其派生構造,形成「 z 」字形落因,同時來自深源(殼或上幔)堿基性巖漿侵入,不僅來了大量cu等成礦物質,更重要的是提供了熱源,促使(落雪組白雲巖和因民組紫色層)循環,與富堿( na和k )巖漿混合,形成富堿中高溫高鹽度流體。
  3. With practical engineering examples, this paper describes the application of gpr to engineering investigation of such harmful geological structures as karst, faults and fractures

    摘要結合貴州福泉翁溪庫、芙蓉江沙阡電站、冗各電站3個工程實例,介紹探雷達勘探在巖溶、斷層等不良質構造勘察方面的應用。
  4. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋鉆孔灌注樁基樁施工中,在不同質條件上鉆機平臺的搭設、成孔設備的選型、事故的處理,並對鋼護筒的埋設及傾斜巖面上鉆孔嵌巖面上鉆孔樁孔底標高問題作了探討
  5. Fault fracture zones often form in active fault zones and appear as long extension with stable trending, they are jointly controlled by active faulting, underground water concentration and freezing expansion

    斷層裂縫沿斷層定向分佈,產狀穩定,成群產出,與斷層活動、運移、不均勻凍脹存在密切的關系,是構造變形與融凍變形聯合、內外動力耦合產生的復合成因裂縫。
分享友人