確定任務 的英文怎麼說

中文拼音 [quèdìngrèn]
確定任務 英文
project definition
  • : 形容詞1. (符合事實; 真實) true; reliable; authentic 2. (堅固; 堅定) firm
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 任名詞(姓氏) a surname
  • : Ⅰ名詞1 (事情) affair; business 2 (姓氏) a surname Ⅱ動詞1 (從事; 致力) be engaged in; devote...
  • 確定 : 1. (明確地定下) define; fix; determine; ascertain 2. (明確而肯定) definite; certain; for sure
  1. Secondly, programmed the image processing arithmetic code which include the bottom arithmetic for the general condition comprises threshold division, region combination and informate and the middle level arithmetic for the given task comprises detecting the line dation creirection according to the hough transform in order to fix on the hole ’ s azimuth angle, detecting the aiguille tip position according to the image movement according to the environment and the image format

    然後,根據目標環境要求和攝像機採集圖像格式,開發了圖像處理演算法程序。圖像處理演算法包括底層演算法和中層演算法兩部分,底層演算法針對通用情況,包括閾值分割、區域合併和信息生成。中層演算法針對具體設計,包括利用hough變換檢測棱線的方向,從而圓孔的方位角和利用基於圖像運動檢測鉆頭尖端位置。
  2. Area electronic buoys system is a large - scale underwater sound equipment of tracking and locating moving objects such as submarines, torpedoes and ships. with advanced vector sensors as detective devices, it has excellent antinoise performance, and its signal noise ratio is high

    區域電子浮標系統是一套大型的水聲跟蹤位設備,其主要是準跟蹤和位海上多個運動目標(如潛艇、魚雷、船隻等)的運動軌跡。
  3. Fiduciary duty is the basis of the verdict

    誠信義報告法律責的依據。
  4. Determine if tasks cost more or less than budgeted

    確定任務成本與預算的差距
  5. To determine if tasks cost more or less than budgeted

    如果要確定任務成本與預算的差距:
  6. Determine if tasks are starting and finishing according to plan

    確定任務是否按照規劃開始或完成
  7. Determine the best sequence for your tasks

    確定任務的最佳順序
  8. Enter task and project constraints

    確定任務和項目的限制。
  9. To determine if tasks are starting and finishing according to plan

    如果要確定任務是否按照規劃開始和完成:
  10. Before you link tasks, you need to determine the sequence of tasks

    在鏈接之前,需要確定任務的順序。
  11. To figure out the task sequence, answer these questions for each task

    確定任務的順序,請就每個思考以下幾個問題:
  12. The sample code initially parses the source of the notification to determine the task id

    範例程式碼首先解析通知源以確定任務id 。
  13. Run method lets you determine how late the task was executed, in milliseconds

    進行判斷,可以讓您確定任務延遲了多久執行(以毫秒為單位) 。
  14. Missions and mission measures of success as well as the key linkages required to tie materiel measures of performance to mission measures of success can be defined appropriately within this framework., and it can meet the needs of mapping the physical performance of components within weapons platform to mission - based utility in military operations so as to evaluate the effectiveness of weapons systems and systems - of - system

    在該框架下可以合理地確定任務成功的量度標準及武器裝備性能量度到效能量度的關鍵聯系,實現軍事作戰中復雜武器平臺內組件的實際性能到基於的作戰效能的映射,從而有效地對武器裝備系統和武器裝備體系的效能進行評估。
  15. Based on communication data between tasks and the size of local data memory, the executing order of tasks was determined

    根據之間的關聯數據量和局部數據存儲器的容量,確定任務的執行順序。
  16. Manipulate - level methods use symbolic / structural languages to describe the robot motion. task - level approaches may incorporate and use natural languages to describe the robot task in an objective - oriented rather than manipulator - oriented way

    級編程時,編程者只給機器人直接下達執行某一確定任務的命令,應用人工智慧的技術使機器人自動完成指,而不需要指機器人每一個動作的細節。
  17. How can we ensure that a user who is working on a particular task is not overwhelmed with irrelevant information

    如何才能保處理特的用戶不會受到與之無關的信息的干擾?
  18. Finally, image based asteroid lading navigation system structure is designed and numerical simulation is performed. the framework of the image navigation system is designed and functions of every subsystem are introduced. the simulation results suggest the navigation system proposed in this paper is feasible

    模擬結果表明基於圖像序列的自主導航系統的有效性和可行性,利用基於圖像序列的自主導航系統能夠有效地完成對導航相機的軌道和姿態確定任務,本文給出的系統設計是可行的。
  19. Firstly the characteristic of r & d project based on da was found compared to general r & d project and large engineering project, and the three dimensions structure of r & d project based on da was model. then the key problems of the project were pointed out : how to break down the project in layer of mission, what ’ re relations among missions in the project, and how to resolve the uncertainty of the time of completing project

    本文通過和大型工程項目、一般研發項目比較,引入系統工程模型建立了動態聯盟研發項目的三維模型;並用結構化的數據來描述動態聯盟研發項目;提出項目計劃的三個關鍵問題: ( 1 )如何完成子項目層到層的分解; ( 2 )如何確定任務之間的關系; ( 3 )如何應對不因素對項目周期的影響。
  20. Space path planning have to decide a safe collision - free path when the robot perform certain task in entity space

    空間路徑規劃是,當機器人在實體空間里完成一時,必須一條安全的無碰撞的穿行路徑。
分享友人