礦山法 的英文怎麼說

中文拼音 [kuàngshān]
礦山法 英文
mine tunneling method
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : 名詞1 (地面形成的高聳的部分) hill; mountain 2 (形狀像山的東西) anything resembling a mountain...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 礦山 : mine; hacienda; diggings; bal; groove礦山安全 mine safety; 礦山測量 [采礦工程] mining survey; lat...
  1. For protective female worker healthy, law set the labor range that female worker prohibits be engaged in, unit of choose and employ persons must not arrange female worker to be engaged in the following these law prohibit the labor that female worker is engaged in : ( 1 ) course of study of mine well dirty ; ( 2 ) silvan industry cutting, put in arris and banish exercise ' s charge ; ( 3 ) " physical labor intensity classifications " the 4th class in the standard the exercise of physical labor intensity ; ( 4 ) the assembly of bldg. scaffold and remove operation, and the altitude wiring of electric power, telegraphic industry works ; ( 5 ) load continuously ( point to load the frequency is in 6 times hourly above ) load every time more than 20 kilograms, discontinuous load load every time more than 25 kilograms exercise

    為了保護女職工的身體健康,律規定了女職工禁止從事的勞動范圍,用人單位不得安排女職工從事以下這些律禁止女職工從事的勞動: ( 1 )井下作業; ( 2 )森林業伐木、歸楞及流放作業; ( 3 ) 《體力勞動強度分級》標準中第四級體力勞動強度的作業; ( 4 )建築業腳手架的組裝和拆除作業,以及電力、電信行業的高處架線作業; ( 5 )連續負重(指每小時負重次數在6次以上)每次負重超過20公斤,間斷負重每次負重超過25公斤的作業。
  2. At present, however, there is still no convincible wags to mine transportation vechile scheduling, for all mathematical means we have is limited in solving this problem, and instructing science theory is wanted. in order to solve these problems, we usually with the help of heuristic method for decision - making and judgement - making in mine transportation vechile scheduling, so the development and invention of intelligence compute software is desperately needed

    運輸車輛調度過程復雜多變,現有的數學方在解決此問題時還很不完善,缺乏科學的理論作指導。這些問題的解決,往往需要用啟發式方( heuristicmethod )作出決策和判斷,這就有賴于智能計算軟體的開發和研製。
  3. This paper research the mining press the meaning of the spirit system with the principle of basic theories and superior, application that press the windpipe net to compute the analysis method of the system theories, press the present condition of the spirit system to proceed to investigate the research to old factory tin mine of company of yunnan tin industry group, minimum tree principle within " diagram theories " of key problem, adoption that find out the esse, right pressed the windpipe net to proceeds the superior

    本文闡述了研究壓氣系統的意義和壓氣管網計算的基本理論及優化原理,並運用運籌學的分析方,對雲南錫業集團公司老廠錫壓氣系統的現狀進行了詳細的調查研究。針對目前老廠錫壓氣系統存在的管網長、漏氣多、壓力損失大等主要問題,採用「圖論」中最小樹原理,對壓氣管網進行了優化研究。
  4. This thesis primarily makes below the work of a few aspects : ( 1 ) the method to append the section line in the geological section plane and the geological plane graph intersected each other ; ( 2 ) the principle and method that automatic determinate of orebody on transverse section with the neural network theory was presented, and draw the slippery boundary of ore ; ( 3 ) the method that drawing the surveying well and lane way engineering in the geological and survey graph ; ( 4 ) the method to automatic calculation and statistics output ore reserves and grade ; ( 5 ) the method that automatic creating the geology cross section of the hole ; this thesis realizes automation for managing geological graph based on the substantive research work

    本論文主要作了以下幾個方面的工作: ( 1 )提出了在相交平面圖和剖面圖中添加剖面剖切線的方; ( 2 )提出了應用人工神經網路理論確定剖面中體界線的理論和方以及巖界線圓滑的原理與方; ( 3 )實現了生產實測工程數據處理與地測圖件的有機結合; ( 4 )實現了塊地質品位和儲量的自動計算和統計輸出; ( 5 )提出了中深孔炮孔排面地質剖面圖自動剖切的原理和方。本論文在大量研究工作基礎上,實現了地測圖件管理的計算機自動化。
  5. After many years of civil construction and facility renovation, shmp become a modern large enterprise with complete management organization, strong technical ability, sufficient manufacturing facility, advanced procedure, perfect testing method to finish design and manufacturing of heavy equipment for power industries, metallurgy and rolling industries, forging and pressing industries, minery and cement industries, water conservancy, and also high quality heavy casting and forging

    我公司經過多年的基本建設和技術改造,現已成為一個組織管理機構健全,技術力量雄厚,加工設備齊全,工藝手段先進,測試方完善,可以獨立設計、製造大型電站、冶煉、軋鋼、鍛壓、、水泥建材設備和大型優質鑄鍛件的現代化大型企業。
  6. Proper redistribution of dump in pingzhuang western open - pit coal mine

    國中南部煤田公司
  7. Public law analysis of mining safety regulation

    安全監管的公思考
  8. It is very complicated to valuate risks that it can not be satisfying results by traditional regressing methods

    投資項目的風險評判相當復雜,傳統的回歸分析方並不能取得令人滿意的效果。
  9. This paper briefly introduced management and treatment measures to control acid mine wastes and acid mine drainage in australia and it could be used as reference to our work in mine environmental protection in china

    本文簡要介紹了澳大利亞含酸廢棄物及酸性廢水的管理與處理方,將為我國的環境保護提供借鑒作用。
  10. A new systematic method for rock engineering design - mechanism pathway analysis is presented. it is pointed out that, by way of studying the internal mechanism network in rock engineering system, it is able to forcast the systems general behaviour characteristics so as to provide a reliable policy - making basis for the optimization design of the rock engineering of underground mines

    介紹用於巖石工程設計的新系統方? ?機理路徑分析方,指出通過研究巖石工程系統內部的機理網路,能夠預測系統的總的行為特性,能夠為地下巖石工程問題的優化設計提供可靠的決策依據。
  11. In order to realize the orebody model, put forward a method to construct 3d object from multiple branching contours based on triangulation, and in this process, calculate the bulk of the orebody automatically

    在數字體模型的建立過程中,提出了一種基於三角剖分的多輪廓線之間的三維重構方,並在重構的過程中計算出了體的體積。
  12. The application of the cemented filling technic in this mine has proven that it has such advantages as high concentration of slurry, low cost of filling and filling without dewatering, etc., so that it is special fit to underhand drift cut - and - fill stoping

    應用證明,該技術具有充填濃度高、充填成本低、充填體不需脫水等顯著優點,特別適合於下向進路膠結充填采中應用。
  13. Simulation and analysis are made for the various excavation schemes for the drift cut - and - fill stoping production in xiaotianjing mine district of heqing manganese ( group ) co. by 3 - d fem and the optimized excavation scheme has played a great role in assuring a safety mine production

    應用三維有限單元對鶴慶錳業集團公司小天井區上向進路分層乾式充填采過程進行了不同開挖方案的模擬分析,所優選的開挖方案對安全生產起到較大作用,模擬結果與生產實際基本一致。
  14. Because almost all the ore in the surface of ground and in the shallow stratum has been found, the increase of resources should be concentrated on deep stratum and outer of the mine enterprise. but only depended on the normal geological methods and regulations, the effect is not good. so we must introduce new geological theories and methods

    由於地表、淺層都已枯竭,增儲的重點應集中在深部和外圍找上;僅僅依靠常規地質方和手段,很難取得理想的效果,因此必須引入新的地質理論和新的找
  15. The modeling method and algorithm for three - dimensional geographic network in mine

    地理網路模型及演算
  16. Provide assistance in the administration of the day to day grade control geology functions of the tanjianshan gold mine

    持續地改進地質工作體系和方,以確保地質工作能安全、有效地服務于灘澗
  17. It is suggested that line 12 passing underneath line 1 shall adopt the freezing process of solid and mining method

    對推薦換乘樞紐提出了水平孔凍結加固、礦山法構築穿越段的施工方
  18. ( 2 ) if the tunnel is constructed by blasting method, the shock vave from blasting endangers the safety and stabilization of existing tunnel structure

    ( 2 ) 、對于鄰近隧道礦山法施工,開挖爆破產生的沖擊波會危及既有隧道襯砌結構安全及穩定。
  19. Surface settlement is due to layer losses and the layer losses are due to the changes of stress state and water content. it is necessary to probe into the principle, but to pay more attention to the aftermath of layer losses - surface settlement and its regularity. this paper has focused on discussing about the regularity of surface settlement in tunneling construction

    地表之所以發生沉降,是因為發生了地層損失,而地層損失主要是由於土的應力狀態和土的含水量發生了變化,機理的探討是必要的,但是人們更關心地層損失造成的後果?地表沉降,更關心地表沉降的規律性,本文討論了隧道施工過程中地表沉降的規律,將隧道施工方分為盾構礦山法兩種,結合理論分析和實測結果,分別給出了地表沉降曲線和沉降范圍的經驗公式,其結論對北京地鐵隧道的設計與施工具有重要的參考價值。
  20. Traditional mining method and natm ( new austrian tunneling method ) in mountain tunnel construction are researched in theory system, mechanical concept, designation principle and actually use. according to contrast and analysis of the usage of these two ways in construction slide, the whole process handle slide in the way of natm are deeply discussed to different kind of slide type

    嶺隧道施工中的傳統礦山法和新奧在理論體系、力學概念、設計原理、實際應用等方面進行了探討,對比和分析了這兩種方在施工坍塌方中的處理應用,並針對不同塌方類型,深入地探討了用新奧的思路處理塌方的過程。
分享友人